Certainly not new to the UK. happens all the time at Wigston, Scrubs lane, and various points on the Great Western main Line
Ah well there we go.
It's even more disappointing then.
Certainly not new to the UK. happens all the time at Wigston, Scrubs lane, and various points on the Great Western main Line
Perhaps it is more random in the applications you mention and/or on TfW the unit speed is far more precise. So varying the unit speed would be useful. Perhaps a variable speed limit sign that varied by time all day long.Certainly not new to the UK. happens all the time at Wigston, Scrubs lane, and various points on the Great Western main Line
They cut back on the number of feeder stations to free up capital to finance Taffs Well depot, and because of this anything more than 12 flirts in combined mode causes the system to go into low power. Trains get warnings and systems show up faults. The 4 an hour is out of the question, 36 of these cannot run on the current system.
Is it not possible that the current ability of the infrastructure is deliberately limited because of cost savings? I've heard that TFWs cash flow isn't particularly good, so I'd assume that the necessary OLE provision for 4tph has been delayed until actually required, along with Queen Street track layout reconfiguration and 398 introduction. This is purely speculative.If this was true and those working on the project know the proposed 4tph service is impossible... why are we only reading this from a single individual in a railway forum and not in the mainstream media? If you were so confident this was all 100% true I don't understand why you, or many others who presumably have the same knowledge, haven't been talking to journalists.
It doesn't add up.
Is it not possible that the current ability of the infrastructure is deliberately limited because of cost savings? I've heard that TFWs cash flow isn't particularly good, so I'd assume that the necessary OLE provision for 4tph has been delayed until actually required, along with Queen Street track layout reconfiguration and 398 introduction. This is purely speculative.
A pair !.View attachment 202903
398 019 + 398 030 at Pontypridd today. Test runs to Treherbert & Aberdare.
Cash flow is supposedly linked directly to the budget for transportation, set by the WA. Money is desperately needed elsewhere too!Is it not possible that the current ability of the infrastructure is deliberately limited because of cost savings? I've heard that TFWs cash flow isn't particularly good, so I'd assume that the necessary OLE provision for 4tph has been delayed until actually required, along with Queen Street track layout reconfiguration and 398 introduction. This is purely speculative.
I saw some running to Treherbert a few weeks ago in multiple formation too.View attachment 202903
398 019 + 398 030 at Pontypridd today. Test runs to Treherbert & Aberdare.
Also at Westenhanger on HS1at 300kph!Certainly not new to the UK. happens all the time at Wigston, Scrubs lane, and various points on the Great Western main Line
raising a pantograph at Westenhanger? What's the Eurostar running on before that? *Mind you, it did happen (at lower speed) when the 373s were still using the original Boat Train Route.Also at Westenhanger on HS1at 300kph!
There's definitely one of those right next to Westenhanger station, I noticed looking back at my footage from there, a 373 panning back up
As I understand it, Eurostar needs an extra long pantograph in the Channel Tunnel because of the extreme height of the catenary (designed for the Le Shuttle trains).raising a pantograph at Westenhanger? What's the Eurostar running on before that? *Mind you, it did happen (at lower speed) when the 373s were still using the original Boat Train Route.
Yep! Testing is getting along nicely. The aim, as has already been said in this thread, is for a June run in service with a unit on the Bay to Pontypridd run.Seemed to be several 398 test runs going on today.
The requested page could not be found.Here's one of the test runs from a distance - this is just north of Taffs Well. I hope this will be a common sight soon.
View attachment 203100
Shows now, but at very small resolution (just 296x185). If you click/tap "Attach files" and select the photo, it should just attach at full resolution.
Shows now, but at very small resolution (just 296x185). If you click/tap "Attach files" and select the photo, it should just attach at full resolution.
The Eurostar pantographs are lowered and then raised at Westenhanger when changing between HS1 and ET catenary configurations. The ET catenary is considerably higher than that on HS1 for obvious reasons.raising a pantograph at Westenhanger? What's the Eurostar running on before that? *Mind you, it did happen (at lower speed) when the 373s were still using the original Boat Train Route.
Any I/D's of the units on test today please?3Q00 and 3Q10 appear to be the initial reporting numbersAt least one more test run today. Just seen two units out and about in formation.
Appears to be multiple runs planned today according to RTT and they've all been on time so far which hopefully means they were successful.
Does anyone know how many miles of fault free running are needed?
3Q10 was the one I saw - didn't manage to see the unit numbers.Any I/D's of the units on test today please?3Q00 and 3Q10 appear to be the initial reporting numbers
Just saw 3Q24 as well - unit numbers were 019 and 030Any I/D's of the units on test today please?3Q00 and 3Q10 appear to be the initial reporting numbers
It’s 1,500 per unit, however the WA have supposedly reduced this under a dispensation agreement to allow the units get out quicker.At least one more test run today. Just seen two units out and about in formation.
Appears to be multiple runs planned today according to RTT and they've all been on time so far which hopefully means they were successful.
Does anyone know how many miles of fault free running are needed?
Scraping the barrel here, I'd hardly call a 10 second job of "installing" a yellow sticker a "modification"It’s 1,500 per unit, however the WA have supposedly reduced this under a dispensation agreement to allow the units get out quicker.
They went to the test track to have this done, but I think funding has been an issue again. So they came back early.
The current units out are fault free runs to accumulate this, and drivers are currently training, 4 days classroom and 12 hours handling.
Due to unit unavailability, drivers are currently having issues getting the hours in to pass out competent. So there’s already a backlog on those completing the classroom phase and into handling. They cannot simply do a short conversation course because of the nature of the units.
Stadler are saying that the majority of the issues are software related, but before they go out there’s a load of modifications they need to have, such as extending tables to be removed due to issues with health and safety concerns around hand entrapment.
The door mechanism is also visible, and yellow stickers need to be installed around these too.
Most of the delay would be in ordering and producing the stickers. That would take rather more than 10 seconds.Scraping the barrel here, I'd hardly call a 10 second job of "installing" a yellow sticker a "modification"
Just a quick chat?They cannot simply do a short conversation course because of the nature of the units.
Conversion course, I'm guessing.Just a quick chat?