In responses made to Lewisham Council, Transport for London are considering adding a service into London Bridge along the Sydenham corridor to relieve the current ELL service which has become overcrowded, especially in the morning peak due to Southern cutting the London Bridge service from 4tph to 2tph due to revenue cuts.
If this happens, it'll be a Crystal Palace service as there's no capacity to terminate them at West Croydon.
In the response to Lewisham Council - PDF File - https://councilmeetings.lewisham.gov.uk/documents/s111890/PTLC Responses 04102023 2.pdf
If this happens, it'll be a Crystal Palace service as there's no capacity to terminate them at West Croydon.
TfL considering London Overground extension to London Bridge
Transport for London (TfL) is considering extending the London Overground to run into London Bridge station to replace capacity lost when Southern cut services in south London.
www.ianvisits.co.uk
Transport for London (TfL) is considering extending the London Overground to run into London Bridge station to replace capacity lost when Southern cut services in south London.
In the response to Lewisham Council - PDF File - https://councilmeetings.lewisham.gov.uk/documents/s111890/PTLC Responses 04102023 2.pdf
Operating additional services during peak periods between Crystal Palace and London Bridge, replacing capacity on this routing that has been lost following the reduction to Southern services • This would represent a new routing for London Overground services that would necessitate significant changes to operational arrangements and driver training. Further work is therefore required to establish the feasibility and business case for this change • There are currently no confirmed timescales for the implementation of either of these options due to the further work they require.
Last edited: