Let's get back on topic pleaseThere was no frequency upgrade; the 17-plate batch was bought for the Forfar to Dundee route.
Perhaps with a (battery) fleet upgrade on the way for the Tayway it makes more sense to get rid of the big batch from Arbroath which are up for replacement anyway, and leave the smaller batch at Perth.