185
On Moderation
- Joined
- 29 Aug 2010
- Messages
- 5,709
So many times this has failed to get off the ground, they are finally spending some money on it but doubt it will ever happen.
7 stations, mostly following the route of the TF1 highway: Santa Cruz (the capital) - Anaza, Candelaria, San Isidro, TFS Airport, Los Cristianos and Las Americas.
https://es.wikipedia.org/wiki/Tren_del_Sur_(Tenerife)
(Only in Spanish, click translate if your browser has that option)
To back this up, local newspaper El Dia has done a few reports on the matter recently. People are quite astounded it's going ahead, however some cynics mention it's nearly election time.
A potential northern extension is mentioned, following the TF5 highway from Santa Cruz up the hill to La Laguna, TFN Airport, then down into La Orotava / Puerto Cruz and Los Realejos - with a further potential extension to Icod de los Vinos.
7 stations, mostly following the route of the TF1 highway: Santa Cruz (the capital) - Anaza, Candelaria, San Isidro, TFS Airport, Los Cristianos and Las Americas.
https://es.wikipedia.org/wiki/Tren_del_Sur_(Tenerife)
(Only in Spanish, click translate if your browser has that option)
Wikipedia said:The Tren del Sur is a project managed by the Council of Tenerife , specifically by the company owned by the Metropolitan Council o Tenerife , through which the island of Tenerife will be provided with a train that runs along the northeast coast, until reachingf the south . It will start at the Transport Interchange of Santa Cruz de Tenerife , and its last stop will be in Adeje . It will be operated by Metropolitano de Tenerife , a company that also operates with the Tenerife Tramway . The works were expected to begin in 2010, and to be inaugurated in 2017 . However, at the end of 2011 the project was halted for economic reasons, but it was resumed at the end of 2017 where the projects have already begun to be drafted; and in 2019 it is planned to begin expropriations of the plots affected by the project.
To back this up, local newspaper El Dia has done a few reports on the matter recently. People are quite astounded it's going ahead, however some cynics mention it's nearly election time.
A potential northern extension is mentioned, following the TF5 highway from Santa Cruz up the hill to La Laguna, TFN Airport, then down into La Orotava / Puerto Cruz and Los Realejos - with a further potential extension to Icod de los Vinos.