The signalling regulations keep referring to module T2, however this seems to have been withdrawn. Instead there are a series of handbooks and one of these details "blocking" the line. Are you no longer allowed to run trains through what used to be a T2? If this is the case then why have an option to "block" the line at all? You could just use a T3 for everything.