The signalling regulations keep referring to module T2, however this seems to have been withdrawn. Instead there are a series of handbooks and one of these details "blocking" the line. Are you no longer allowed to run trains through what used to be a T2? If this is the case then why have an option to "block" the line at all? You could just use a T3 for everything.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,099
Location
Near where the 3 ridings meet
You never could run a train through any form of T2.
They had to be given up and retaken.
The only time trains can run in a possession are under T3 or T4 and then only engineering trains directly concerned with that possession.
Never a passenger or normal freight service.
T2 possessions were used for activities that could be given up at short notice.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
I seem to remember trains getting stopped at the edge of what I thought was a T2, held until the line was clear and then let through by a handsignalman. Maybe I'm getting confused though as it seems handsignalmen are not allowed to be used for this.
 

nr_signaller

Member
Joined
6 Feb 2011
Messages
94
I seem to remember trains getting stopped at the edge of what I thought was a T2, held until the line was clear and then let through by a handsignalman. Maybe I'm getting confused though as it seems handsignalmen are not allowed to be used for this.


What you are referring to i believe was the old T2H with site and distant handsignaller. The train was allowed to pass the distant handsignaller only (located i believe something like 2 miles from the site handsig and therefore the site of work) though i cannot go into much further detail as have never dealt with or worked anywhere that ever required this method of working

 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
I seem to remember trains getting stopped at the edge of what I thought was a T2, held until the line was clear and then let through by a handsignalman. Maybe I'm getting confused though as it seems handsignalmen are not allowed to be used for this.
This method was used in rural areas under BR although having said that in the 1970s, OHL headspans were erected under such arrangements.

From sometime in the 1990s the method became less used because of the advent of mobile telephony, and has now finally been withdrawn.

Incidentally a T2 is a Block NOT a Possession. There is a difference. A Block is a temporary blockage to the line whereas a Possession is the formal transfer of the line from the Operating Department or whatever term they wish to be known by this month to the Engineering dept.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
So it's not longer allowed to have a T2 block and then clear the line every 30 minutes to let a train through?
 
Last edited:

nr_signaller

Member
Joined
6 Feb 2011
Messages
94
So it's not longer allowed to have a 2T block and then clear the line every 30 minutes to let a train through?

T2 is no more, instead it is referred to as a line blockage which is essentially very similar to the old t2

 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
T2 is no more, instead it is referred to as a line blockage which is essentially very similar to the old t2
It doesn't help much that the signalling regulations still refer to T2 and that the details of the line blockage seem to be in a COSS handbook that I wouldn't have thought signalmen would be issued with.
 

nr_signaller

Member
Joined
6 Feb 2011
Messages
94
It doesn't help much that the signalling regulations still refer to T2 and that the details of the line blockage seem to be in a COSS handbook that I wouldn't have thought signalmen would be issued with.



T2 module has been withdrawn. New signaller instructions now in TS1 reg 13

 

miikey

Member
Joined
9 Jan 2011
Messages
79
For a while we were still using the old T2 forms whilst taking a 'line blockage'.
Confusing.
Why did they have the change it? Its practicaly the same.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
For a while we were still using the old T2 forms whilst taking a 'line blockage'.
Confusing.
Why did they have the change it? Its practicaly the same.
It's part of the new approach to the rule book, reducing the number of modules and issuing handbooks for different duties.
 