SWR Class 458 to be retained

Status
Not open for further replies.

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
And if one advocates for PRINCE2 in todays project Managment landscape I’m very much of the opinion I would not wish to be working with them…

It is A system, but is very rarely the right system.

Remember all of these frameworks exist for one reason, to sell their product, which is their framework.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

kw12

Member
Joined
12 Jan 2017
Messages
233
It's at the terminus that problems occur. The Southern Railway rebuilt some stations with 820 feet platforms (when joining units was likely), but some were bit more cramped and were nearer 800 feet. Fine for triple 4COR units 3x265=795 feet

The 458/4s are 82.6m (271 feet), or 812 feet long for 3units, which doesn't work in the platforms that are nearer 800 feet long between signal and buffers. A triple 450 is about 3m (9 feet) shorter, just enough to fit.
There were similar issues preventing the introduction of 8 car 777 trains at Southport. The solution there was to extend some of the platforms at their buffer stop end. Could a similar approach be taken at Waterloo?
 

Invincible

Member
Joined
23 Apr 2022
Messages
853
Location
Surrey
And if one advocates for PRINCE2 in todays project Managment landscape I’m very much of the opinion I would not wish to be working with them…

It is A system, but is very rarely the right system.

Remember all of these frameworks exist for one reason, to sell their product, which is their framework.
Prince2 started with the UK Government to set a framework for large projects, and is slowly being taken up and adopted by several commercial industries.
I expect DfT, going into an interim GBR, will insist it be used at high level, especially (where bosses will have to find time attend detailed project board meetings) to control more railway projects, especially where some mistakes (like 442, 458 and say HS2) could have been foreseen and rectified before becoming big costly issues.

However outsourcing it to Peoplecert and charging a lot for training courses and certification my not have been a good move.
 
Last edited:

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,236
Location
UK
However with the 442s each train had different wiring,
That brings back memories (of off record discussions had) with colleagues 20 odd years ago. They (442's) had been subject to a number of mods over the years, and thus there were quite a few differences between units under the surface. Fine whilst those in the know at the time, were still responsible for their upkeep, but a potential minefield going forward. It is no secret now about the 442 v 458 decision in relation to the 2007 refranchise, but that said, I was already hearing (unofficially from some 'on the ground') that the 442's performance had by then peaked, and they were starting to decline in the reliability stakes, which would inevitably cause problems with overall TT performance going forward. So whilst some folk lamented their passing (off the SW at that time), I still believe from a performance stand point, it was the right decision. I'm sure this is a point many can/will argue over for years to come!

== Doublepost prevention - post automatically merged: ==

There were similar issues preventing the introduction of 8 car 777 trains at Southport. The solution there was to extend some of the platforms at their buffer stop end. Could a similar approach be taken at Waterloo?
Not without major expense (£b's). It would mean cutting in to the concourse, primarily (given the line of route/service group under question is the PDL) in relation to platforms 8 to 15. The concourse struggles to cope on many occasions with the vast number of people, and whilst there are a number of retail units backing on to the buffers as such, which could in theory be done away with, the expense and disruption, including the work that would be involved with the under croft below track and concourse level, in relation to what is trying to be achieved would (as said before) never be sanctioned. Not in my life time anyway!

To give a snap shot of the type of work involved, two images I took from the same spot in the area of No 1 Loco Dock (one of two short loco sidings) between platform 11 and (the pre 1989) platform 12 (platform 14 as it is today) at the country end of the old cab road. This was an early part of the work to provide space for Waterloo International, by doing away with the long standing cab road between platform 11 and the (old) platform 12, to provide two new platforms (12 & 13 as they are today), the old p12 becoming todays p14 as said.

That showing the EDL taken in 1985 and the other taken in 1989.
 

Attachments

  • BJ-Waterloo No 1 Dock 1985.jpg
    BJ-Waterloo No 1 Dock 1985.jpg
    353.4 KB · Views: 135
  • BJ-Waterloo No 1 Dock 1989.jpg
    BJ-Waterloo No 1 Dock 1989.jpg
    429.6 KB · Views: 137
Last edited:

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,452
They didn't wait 18 months to cut the services after Covid started, and the timetable is not fundamentally different to that in place Dec2019.

So taking 18 months to consider reversing a decision that took fraction of 18 months, is a rather vague fluffy, not going to put any effort in to restore, sort of reply.
The reality is that the pre-Covid timetable simply did not work. The trains had become significantly longer since the re-write in 2004 and the additionals inserted since then had taken up available capacity which only existed on paper. Longer trains meant more time taken to clear track berths, which meant drivers behind are more likely to be going slower as they chase cautionary signal aspects, which in turn meant trains behind taking even longer and the cumulative effect is far greater than the summation of all the constituent contributary parts. There was virtually no resilience during peak periods and that was the main reason performance fell off a cliff edge in the few years prior to the pandemic. The hope at the time was that the faster acceleration of the 701s would help alleviate that problem, however to date no one knows whether that would actually cure it.

Once sufficient legacy stock has been replaced there will need to be a gradual introduction of those removed services back into the timetable, and allow them time to settle in order to better understand their impact on the network. If political interference continued to play a major part like it was in the pre-pandemic days, the outlook would be quite frankly bleak, to put it mildly.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,236
Location
UK
There was virtually no resilience during peak periods and that was the main reason performance fell off a cliff edge in the few years prior to the pandemic
Correct. The a.m. peak started to struggle (at Waterloo) by around 0830-0900 and the evening peak after about 1800. I spent more hours/days than (it, as a subject) deserved, in the greater scheme of things, re working the peak hours at Waterloo, and it came to a head with some request or other from on high, the details of which escape me now, but the upshot was that by 1810 we ran out of platforms to run the advertised service. Think it had something to do with UP WoE train, 1L44 1L56(?) that due in at 1744 at any rate, and the departure at 1748 to Southampton. It is regrettable that too often some of those at a higher level don't understand (and I don't expect them to necessarily) , but worse don't listen to those at the coal face- it was what it was, and only hope such individuals in todays (SWR) scenario will learn from previous events. Who can tell?
The hope at the time was that the faster acceleration of the 701s would help alleviate that problem
That would be an advantage in the Waterloo throat. The track layout outside p1-4 was prior to the 2017 rebuild, the optimum type of layout, all crossings just off the platform ends, and so any conflicting moves were reduced to the minimum amount of time possible to make. The re occupation time back then was 3 mins for most of my time and before, but this was (at our/SWT planning AFAIR) request extended to 4 mins with the 10 car / extended platform / revised track layout, which meant crossing moves inbound to p1 were made west of Westminster bridge for one, and although the plan for a common 4 min re occupation (except a very few 3 min examples) worked on paper, as you say, reality can be somewhat different. Just one part of the need for increased capacity sometimes being a part trade off with performance when the overall situation has already been virtually maxed out!

Edit - PS: in truth any improved acceleration characteristics of the 701's will have little bearing on the Waterloo throat area on its own, due to the carpet 15 mph PSR. Can't remember off hand exactly where this is relaxed (DMS/DMF)? think it's about adjacent to the blocks in the South Siding, but may be mistaken?
Once sufficient legacy stock has been replaced there will need to be a gradual introduction of those removed services back into the timetable, and allow them time to settle in order to better understand their impact on the network. If political interference continued to play a major part like it was in the pre-pandemic days, the outlook would be quite frankly bleak, to put it mildly.
Couldn't have put it better myself. Well said.
 
Last edited:

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
I believe 2C51 has just been diverted down the mainline - doesn't this make it the first 458/4 to run in passenger service down the mainline?
 

swr444

Member
Joined
26 Aug 2008
Messages
994
Location
London
I believe 2C51 has just been diverted down the mainline - doesn't this make it the first 458/4 to run in passenger service down the mainline?
Interesting, they're not permitted to run down the mainline in passenger service (seems ridiculous if they can run on it as ECS). They must have gotten special permission or someone may be in trouble
 

Phil R

Member
Joined
18 Jan 2020
Messages
162
Location
Guildford
Showing fast Clapham - Virginia Water then cancelled at Wokingham a few minutes late, looks unusual..
 

DavidRail

Member
Joined
1 Jan 2025
Messages
6
Location
South West London
Showing fast Clapham - Virginia Water then cancelled at Wokingham a few minutes late, looks unusual..
The return journey from Reading, 2C62, was cancelled 'Due to a Fault on the train"
2C52 (RDG-WAT) was cancelled 'Virginia Water and London Waterloo due to a level crossing failure'
So it looks like there was a problem at Egham, causing 2C51 to divert via mainline (P9 at CLJ), but odd that it then 'broke down'
 

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
Interesting, they're not permitted to run down the mainline in passenger service (seems ridiculous if they can run on it as ECS). They must have gotten special permission or someone may be in trouble
It ran on the fast, I got bored and tracked it on a website, it ran clj down fast --> addlestone --> virginia water (left -2 from platform 3) --> shunted to the signal and reversed --> went out a few minutes late --> went to wokingham and sat there for 40 minutes --> 5c61 to reading --> 5c62 to waterloo --> waterloo p17 (probably still there)
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,770
It ran on the fast, I got bored and tracked it on a website, it ran clj down fast --> addlestone --> virginia water (left -2 from platform 3) --> shunted to the signal and reversed --> went out a few minutes late --> went to wokingham and sat there for 40 minutes --> 5c61 to reading --> 5c62 to waterloo --> waterloo p17 (probably still there)
Shows on Open Train Times map as still being there with next working 5Z91.
 

davews

Member
Joined
24 Apr 2021
Messages
1,002
Location
Bracknell
Level crossing failure at Egham with trains diverted via the main line Clapham Junction to Virginia Water, with passengers.... I assume the RTT suggestion of a train fault was in error, it would have been terminated at Wokingham to get schedules back to normal after they sorted the crossing.

Level crossing sorted, them immediately a tree on the line between Sunningdale and Longcross, up trains at a standstill....
 

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
I assume the RTT suggestion of a train fault was in error, it would have been terminated at Wokingham to get schedules back to normal after they sorted the crossing.
I mean it was only +8 (i think) at Wokingham, could probably have made that up? although, if the up line was blocked then that makes sense.
 

swr444

Member
Joined
26 Aug 2008
Messages
994
Location
London
I mean it was only +8 (i think) at Wokingham, could probably have made that up? although, if the up line was blocked then that makes sense.
I mean it is a 458 after all so a fault could have been likely. trains have almost a 30 min turnaround at reading so 8 mins is not enough of a delay to warrant a turnaround a at WKM
 

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
I mean it is a 458 after all so a fault could have been likely. trains have almost a 30 min turnaround at reading so 8 mins is not enough of a delay to warrant a turnaround a at WKM
Yeah true, also, do you know why the 458/4s are not permitted down the mainlines, especially considering the original idea was Portsmouh services?
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,452
It ran on the fast, I got bored and tracked it on a website, it ran clj down fast --> addlestone --> virginia water (left -2 from platform 3) --> shunted to the signal and reversed --> went out a few minutes late --> went to wokingham and sat there for 40 minutes --> 5c61 to reading --> 5c62 to waterloo --> waterloo p17 (probably still there)
That is not a permitted route for this stock in passenger service. The service should have been cancelled at Clapham Junction, then ECS onwards or into Wimbledon. I would imagine there will be serious investigations into what happened and the contributions various parties played in this process. 2C51 was subsequently cancelled due to door-related faults at Wokingham, which may or may not be related to this significant error. I am sure those involved in this process would have been mightily relieved when they found out what happened and be grateful it went on the fasts and not the slows.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
That is not a permitted route for this stock in passenger service. The service should have been cancelled at Clapham Junction, then ECS onwards or into Wimbledon. I would imagine there will be serious investigations into what happened and the contributions various parties played in this process. 2C51 was subsequently cancelled due to door-related faults at Wokingham, which may or may not be related to this significant error. I am sure those involved in this process would have been mightily relieved when they found out what happened and be grateful it went on the fasts and not the slows.
Sorry but how on earth can an EMU, cleared for a route, not be cleared to carry passengers on it?
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,452
Sorry but how on earth can an EMU, cleared for a route, not be cleared to carry passengers on it?
A fully loaded train naturally depresses the suspension therefore the body of the vehicles can fall foul of gauging clearance where an empty one does not. It is possible to clear a route for one but not the other. The altered profile of a fully loaded train can also result in specific restrictions on speed, movements on adjacent lines, operating instructions, etc. These 458/4 trains must be run under a 5X headcode when operating ECS via the mainline, which in this case also did not happen.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
A fully loaded train naturally depresses the suspension therefore the body of the vehicles can fall foul of gauging clearance where an empty one does not. It is possible to clear a route for one but not the other. The altered profile of a fully loaded train can also result in specific restrictions on speed, movements on adjacent lines, operating instructions, etc. These 458/4 trains must be run under a 5X headcode when operating ECS via the mainline, which in this case also did not happen.
It can do but usually the secondary suspension is kept pumped up by the compressors, so it shouldn't drop that dramatically to foul a loading gauge.

Isolate secondary suspension could cause a problem.

Seems like there's some gauging work to do on the SW to make it less restrictive then!
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,452
Interesting, they're not permitted to run down the mainline in passenger service (seems ridiculous if they can run on it as ECS). They must have gotten special permission or someone may be in trouble
No special permission can be given unfortunately. They are not route cleared for passenger service full stop therefore I would be extremely surprised if someone would have been brave enough to give that clearance.
It can do but usually the secondary suspension is kept pumped up by the compressors, so it shouldn't drop that dramatically to foul a loading gauge.

Isolate secondary suspension could cause a problem.

Seems like there's some gauging work to do on the SW to make it less restrictive then!
True and true, but I guess there isn't really a pressing need to get them route cleared as the likelihood of requiring such a diversion is fairly small in the grand scheme of things. Useful but with other more pressing issues to resolve I imagine it just isn't high enough on the agenda list of those in charge.
 
Last edited:

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
True and true, but I guess there isn't really a pressing need to get them route cleared as the likelihood of requiring such a diversion is fairly small in the grand scheme of things. Useful but with other more pressing issues to resolve I imagine it just isn't high enough on the agenda list of those in charge.
I would have assumed they would have got the clearance before they even converted them to /4s, and anyway, what is so different between the /5s and the /4s that means they can't run on the mainline?
 

swtrains

Member
Joined
30 May 2024
Messages
193
Location
London
These 458/4 trains must be run under a 5X headcode when operating ECS via the mainline, which in this case also did not happen.
I believe 2S50 ran as 5X50 via the mainline when it got cancelled. 2C52 as 5X52 also.
Would likely have been the first time a 701 has gone down the mainline fast (further than the Hampton Court fasts a month ago) - 2C49.
No special permission can be given unfortunately. They are not route cleared for passenger service full stop therefore I would be extremely surprised if someone would have been brave enough to give that clearance.

True and true, but I guess there isn't really a pressing need to get them route cleared as the likelihood of requiring such a diversion is fairly small in the grand scheme of things. Useful but with other more pressing issues to resolve I imagine it just isn't high enough on the agenda list of those in charge.
Someone ought to be getting the sack then.
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,452
I would have assumed they would have got the clearance before they even converted them to /4s, and anyway, what is so different between the /5s and the /4s that means they can't run on the mainline?
The suspensions are slightly different, but in any case I don't think you can route clear a rolling stock type until they have been produced, if new clearance is deemed necessary. Of course if no other work is involved, just simply a carriage removed, then new clearance is not likely required.
I believe 2S50 ran as 5X50 via the mainline when it got cancelled. 2C52 as 5X52 also.
Would likely have been the first time a 701 has gone down the mainline fast (further than the Hampton Court fasts a month ago) - 2C49.

Someone ought to be getting the sack then.
That is not for me to comment on, as I wouldn't be party to any investigation outcome, but the main objective of investigations would be to learn from an incident and putting forward measures to prevent it from occurring again.

That said I doubt anyone would get the sack off the back of one single incident like this, unless they are on last warnings. Support plans and new guidance would be more likely measures.
 

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
The suspensions are slightly different, but in any case I don't think you can route clear a rolling stock type until they have been produced, if new clearance is deemed necessary.
Ah makes sense, did they not think about that before they decided they were going to run them to Portsmouth? (or maybe they haven't tested it yet?)
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,437
Location
Taunton or Kent
A fully loaded train naturally depresses the suspension therefore the body of the vehicles can fall foul of gauging clearance where an empty one does not. It is possible to clear a route for one but not the other. The altered profile of a fully loaded train can also result in specific restrictions on speed, movements on adjacent lines, operating instructions, etc. These 458/4 trains must be run under a 5X headcode when operating ECS via the mainline, which in this case also did not happen.
Having read this I did a rough calculation to provide some context: if 200 passengers were onboard weighing an average of 70kg each (chosen arbitrarily), that would add an extra 14 tonnes to a 4-car unit's weight (an additional near-10% of the 458's weight), so the fact a passenger load changes a unit's behaviour (beyond the obvious acceleration and deceleration potential) is certainly logical.
 

boiledbeans2

Member
Joined
15 Oct 2020
Messages
963
Location
UK
[...]

True and true, but I guess there isn't really a pressing need to get them route cleared as the likelihood of requiring such a diversion is fairly small in the grand scheme of things. Useful but with other more pressing issues to resolve I imagine it just isn't high enough on the agenda list of those in charge.
Well, it seems the route clearance test has just been performed! It has just been proven that the 458/4s can run on the mainline with passengers. :D
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,901
Location
London
Well, it seems the route clearance test has just been performed! It has just been proven that the 458/4s can run on the mainline with passengers. :D
Not really, may have just got away with it, no one knows how close those yaw dampers were to causing issues with pax on. Especially if doing the tighter 20 turnout towards Addlestone from the mainline at Weybridge.
 