No doubt the priority is to bin off the 455s before the 458/5's unless the leasing costs for the former are cheaper....
Nah, the 458/5s will run out of miles before the 455s. They'll come up to their C6 and they'll be binned to Long Marston. They'll be gone by Early-Mid 2026, 455s(the ones in the best condition), will be retained until the Arterios are all in service which could be by 2027, so. Make of that what you will.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DelW

Established Member
Joined
15 Jan 2015
Messages
5,976
I haven't really travelled on a 458/5 but am perfectly happy with 444s to Portsmouth thanks : :D

The 458/4s are superior to the 458/5s, but not up there with the 444s.

I don't think anyone has any objection to 444s to Portsmouth, it's the 450s that have been unpopular ever since they were put onto Portsmouth runs soon after the late lamented 4CIGs and their ilk were withdrawn. Narrow seats, no armrests, poor legroom and table-less six-seat bays aren't appropriate for 2-hour plus journeys.
 

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
This suggests that the Portsmouth plan is over and they will be phased out post the 701 introduction.
I presume they cost more to run than the 701s, also probably more in maintenance after the re-geared motors.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,800
Location
Cambridge
Nah, the 458/5s will run out of miles before the 455s. They'll come up to their C6 and they'll be binned to Long Marston. They'll be gone by Early-Mid 2026, 455s(the ones in the best condition), will be retained until the Arterios are all in service which could be by 2027, so. Make of that what you will.
Again, do you have a source for this, because the last we’ve been told by reputable forumers who work for SWR is that every effort is being made for enough 701s to enter service for the 455s to be gone for the December timetable change? I’m suspicious as to what is fact here, and what might be something you’ve seen on a Facebook group or the like.
 

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
Again, do you have a source for this, because the last we’ve been told by reputable forumers who work for SWR is that every effort is being made for enough 701s to enter service for the 455s to be gone for the December timetable change? I’m suspicious as to what is fact here, and what might be something you’ve seen on a Facebook group or the like.
I'm pretty sure his sources are made up, he's done this stuff in many discord servers and most people just started ignoring him as hes essentially spouting garbage.
 

Doomotron

Established Member
Joined
25 Jun 2018
Messages
1,423
Location
Kent
Really there's so much baseless speculation on this thread that I wouldn't be shocked if it was in the speculative discussion subforum. :lol:

In all seriousness, it would be helpful if we could give sources, even if they're not necessarily reliable. I don't think it's just me who'd rather read "I heard it from a guard I know" or something like that.

My uncle is a driver at SWR who is signed on 458s; he says he believes that they'll either end up being based at Fratton (presumably for PDL work) or scrapped. Whether or not that's up to date knowledge, I don't know.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
807
Location
London
Really there's so much baseless speculation on this thread that I wouldn't be shocked if it was in the speculative discussion subforum. :lol:

In all seriousness, it would be helpful if we could give sources, even if they're not necessarily reliable. I don't think it's just me who'd rather read "I heard it from a guard I know" or something like that.

My uncle is a driver at SWR who is signed on 458s; he says he believes that they'll either end up being based at Fratton (presumably for PDL work) or scrapped. Whether or not that's up to date knowledge, I don't know.
As a quick recap of stuff in the public domain from more official sources - though not particularly recent. The lease on the 458/4s was until August 2027 from the First MTR contract agreement, the DfT operator hasn't published a new contract for the 458s so very likely it has inherited the contract from its predecessor. All other fleets have been extended in full until at least 2028 by the new operator.

In terms of future use, earlier this year (the First MTR operation) SWR Head of Fleet Delivery was quoted in this RailMagazine article saying:
Following the COVID-19 pandemic and subsequent changes in customer travel patterns, the fleet is operating services on our suburban network, as we continue the rollout of our fleet of Arterio trains. We continue to monitor the demand on the Portsmouth route to establish if the trains will need to work this service group in the future.

While the operating company has changed, there isn't a pressing need to make a decision on their future yet and they can wait to see if anything changes. I wouldn't be surprised if speculation was the only thing available until next year. The 701 rollout once complete will free up plenty of 450s based on the current diagrams.
 

moley

Member
Joined
12 Jun 2011
Messages
409
A colleague queried at a recent meet the manager event when the short formed Desiro peak services would return to full strength (those that have gone 12>10, 10>8 and 12>8).

He was told that this would improve as the 701 roll-out continued, but that the priority was to retire the 455s . He also asked if any of the peak time extras were coming back to the mainline and was told that this was being considered for December 2026, but nothing could be done any earlier.

Make of that what you will, but to me it suggests they are going to make use of the 458/4s until they sort out their other issues rather than ditching them.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,108
Location
West Wiltshire
He was told that this would improve as the 701 roll-out continued, but that the priority was to retire the 455s . He also asked if any of the peak time extras were coming back to the mainline and was told that this was being considered for December 2026, but nothing could be done any earlier.
They didn't wait 18 months to cut the services after Covid started, and the timetable is not fundamentally different to that in place Dec2019.

So taking 18 months to consider reversing a decision that took fraction of 18 months, is a rather vague fluffy, not going to put any effort in to restore, sort of reply.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,165
They didn't wait 18 months to cut the services after Covid started, and the timetable is not fundamentally different to that in place Dec2019.

So taking 18 months to consider reversing a decision that took fraction of 18 months, is a rather vague fluffy, not going to put any effort in to restore, sort of reply.
Although it's been stated by both Hendy and Haines that the recast is happening there are those on these forums who with what appears to be inside knowledge claim that it's not happening.

The current timetable is essentially the 2004 recast with significant gaps in it.
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
I’m not convinced the 2019 T/T could just be uploaded without significant issues, there’s been a reduction in the guards working week, GTR have had a recast and I’m certain there’s additional freight paths bid for (but very rarely run). That’s before you factor in driver shortage and the fact the previous timetable only ever worked on paper.

An interesting thought but perhaps belongs in a speculative or Timetable thread.
 

Boalbads

Member
Joined
7 Sep 2024
Messages
126
Location
London
I was thinking, I remember seeing somewhere here that a triple 458/4 would be too long for some platforms, they have ASDO do they not? If the platforms at Waterloo are too short then fair enough, but if its just at some stations then using ASDO for 10/11 coaches cant be that bad of a compromise (although - it would require new PIS setups, since I believe there are currently seperate PIS codes for 5 and 10 car units on the same rotue, even on the /4s, hence why it says be in the front 8 at places like Syon Lane)
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,291
I was thinking, I remember seeing somewhere here that a triple 458/4 would be too long for some platforms, they have ASDO do they not? If the platforms at Waterloo are too short then fair enough, but if its just at some stations then using ASDO for 10/11 coaches cant be that bad of a compromise (although - it would require new PIS setups, since I believe there are currently seperate PIS codes for 5 and 10 car units on the same rotue, even on the /4s, hence why it says be in the front 8 at places like Syon Lane)
ASDO is fine at smaller stops, but terminals, stations with pointwork shortly before/after the platforms, stations where the trains where may need to reverse and probably others that pose problems. So it is more than just Waterloo that would be a showstopper. I’m sure they did look into it, albeit too late really :lol:
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,108
Location
West Wiltshire
I was thinking, I remember seeing somewhere here that a triple 458/4 would be too long for some platforms, they have ASDO do they not? If the platforms at Waterloo are too short then fair enough, but if its just at some stations then using ASDO for 10/11 coaches cant be that bad of a compromise (although - it would require new PIS setups, since I believe there are currently seperate PIS codes for 5 and 10 car units on the same rotue, even on the /4s, hence why it says be in the front 8 at places like Syon Lane)
It's at the terminus that problems occur. The Southern Railway rebuilt some stations with 820 feet platforms (when joining units was likely), but some were bit more cramped and were nearer 800 feet. Fine for triple 4COR units 3x265=795 feet

The 458/4s are 82.6m (271 feet), or 812 feet long for 3units, which doesn't work in the platforms that are nearer 800 feet long between signal and buffers. A triple 450 is about 3m (9 feet) shorter, just enough to fit.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,241
Location
UK
I was thinking, I remember seeing somewhere here that a triple 458/4 would be too long for some platforms, they have ASDO do they not? If the platforms at Waterloo are too short then fair enough, but if its just at some stations then using ASDO for 10/11 coaches cant be that bad of a compromise (although - it would require new PIS setups, since I believe there are currently seperate PIS codes for 5 and 10 car units on the same rotue, even on the /4s, hence why it says be in the front 8 at places like Syon Lane)
The potential issue of 12 car 458 is not about platform lengths/passenger door operation in the context you mention. It's about signal sighting for the driver of any such formation at Waterloo and Portsmouth Harbour. There are only three platforms at Waterloo, and two at Portsmouth Harbour that can accommodate such a formation, and allow the driver to see the departure signal aspect from his/her seated position in the cab. At all other platforms the signal will be so close to, and above the train, that the driver can not see it.
The platform (ramp end) infrastructure at both those stations is very crowded, such that there is little if any space to move the signal gantries any further out, hence the signal sighting issues.
To sum up, three platforms at Waterloo (two of which are not ideally suited to Main Line departures) and two at Portsmouth Harbour, are in theory useable for 12 car 458, but to plan a reliable half hourly service with so few terminal platforms, would be a very risky ask, if one takes in to account potential point & signal failures, which could leave trains with no platform to use, and cause added disruption. But that is for the current operators to decide.

Snow1964 has just commented similarly whilst I've been trying to get my fingers to work!
 
Last edited:

Invincible

Member
Joined
23 Apr 2022
Messages
853
Location
Surrey
I don't think anyone has any objection to 444s to Portsmouth, it's the 450s that have been unpopular ever since they were put onto Portsmouth runs soon after the late lamented 4CIGs and their ilk were withdrawn. Narrow seats, no armrests, poor legroom and table-less six-seat bays aren't appropriate for 2-hour plus journeys.
The 450s replaced some of the 442s but have been recently refurbished with 2+3 seating.
The 458s refurbishment with 2+2 seating so they could replace the 450, some of which run 12 car.
Surprised the signals issue was not highlighted before the 458 refurbishment?
So the issue 1. will be to keep 450s with 2+3 seating.
2. Change the 450s seating to 2+2 even though recently refurbished.
3. Or a difficult move of the signals so 458s can be used.

Interesting that LU have published data that shows 4.5m turnstile uses before COVID, then dropped to 3.6m, now 3.9m. SWR should have stats to show if the PDL is recovering passenger numbers
 
Last edited:

swr444

Member
Joined
26 Aug 2008
Messages
998
Location
London
The 450s replaced some of the 442s but have been recently refurbished with 2+3 seating.
The 458s refurbishment with 2+2 seating so they could replace the 450, some of which run 12 car.
Surprised the signals issue was not highlighted before the 458 refurbishment?
So the issue 1. will be to keep 450s with 2+3 seating.
2. Change the 450s seating to 2+2 even though recently refurbished.
3. Or a difficult move of the signals so 458s can be used.

Interesting that LU have published data that shows 4.5m turnstile uses before COVID, then dropped to 3.6m, now 3.9m. SWR should have stats to show if the PDL is recovering passenger numbers
450s always had 2+3 seating. The "refurbishment" was just new seat covers and a few other bits of cosmetic work
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,165
So they could have changed the seats in the 450s, but presume did not as the use of 458s was expected?
There was never any plan to convert the 450s to 2+2 seating irrespective of the 458s. The refurbishment was new seat cushions and covers, plus carpets, and relocating and reducing the 1st Class area. The 127 450s are used right across the SWR network, mainly on outer suburban services.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,241
Location
UK
I feel that over time the seating issue on PDL has become muddied/muddled in some quarters. To be clear, the trains concerned were/are ONLY the 1Pxx fast services, taking, give or take one & half hours end to end. The 2Pxx slower services, be they to Haslemere or Portsmouth were always planned for 450, and I would imagine are likely to remain so.

I see only one option;

a) The status quo (a mix of 444 and 450) will remain as now, and ditto going forward even/if/when the timetable in revised.

The risk to the timetable and overall performance with running 12 car 458 is I believe such, that I very much doubt it will be sanctioned in any quarter. It would put too much risk (potential disruption wise) in to the plan, not to mention additional restrictions/stress on the signallers concerned, particularly during disruption when those few (12 car 458 suitable) platforms, can never be guaranteed to be kept clear just for those 1Pxx trains formed as such.

The logistics/expense of moving/re-siting numerous signal gantries renders this a non starter.
 

nctd2306

Member
Joined
2 Jan 2024
Messages
364
Location
Berkshire
(With hindsight, maybe keeping them as 5-car and running to Pompey as 10’s might have been better!)
The 5 car conversion changed their gearing and maximum speed to 75mph, which wouldn't work on the Pompey Direct services, this was the whole reason they were reduced back to 4 in the first place: to allow a 90-100mph top speed again.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,976
I feel that over time the seating issue on PDL has become muddied/muddled in some quarters. To be clear, the trains concerned were/are ONLY the 1Pxx fast services, taking, give or take one & half hours end to end. The 2Pxx slower services, be they to Haslemere or Portsmouth were always planned for 450, and I would imagine are likely to remain so.
While that's true, one thing that has changed is that there's now only one 1Pxx per hour, instead of every half hour as previously, so the 2Pxx's are now 50% of the service (although timings will tend to push through passengers onto the class 1s).

At weekends, 450s are far too prevalent too. Taking a random 5 hour period on the Direct yesterday (Sunday 10th), four out of ten 1Pxx were 450s (as were all ten class 2s). That's 14 out of 20 through trains formed of suburban units.

I'm sure your expectations for the future are correct though. It does seem hard to credit that the very expensive refurb and conversion of the 458/4s was authorised without anyone spotting that the signalling problem would prevent their intended use.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,788
Would have thought this would be part of the risk assessment before the 458 refurbishment was given the go ahead.!!!
It’s the same organisation that came up with the 442 fiasco. You weren’t expecting a different outcome were you?! :lol:
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,241
Location
UK
While that's true, one thing that has changed is that there's now only one 1Pxx per hour,
That is so currently, but one would hope 2 x 1P p/h would resume at some stage, but as Stephen42 has mentioned up thread, it would seem SWR are 'watching this space' as to loadings etc going forward before making a decision. May be a lesson learnt perhaps?
I'm sure your expectations for the future are correct though
Not so much my expectations, rather just experience of planning matters in past times and what were certain ideals and disciplines (in addition to laid down rules) that formed the structure(s) of a robust timetable. PS: I always believed (still do) that a passenger's first priority when using a train, is its punctuality, and that only comes about if the TT is a robust one, with a minimum of risk built in.

Can't comment on the decision processes behind either of the latest 458 rebuild or the 442 before that. Long after my time!

Edit: BOLD my belated comment.
 
Last edited:

Invincible

Member
Joined
23 Apr 2022
Messages
853
Location
Surrey
It’s the same organisation that came up with the 442 fiasco. You weren’t expecting a different outcome were you?! :lol:
There is a system called PRojects IN Controlled Environments (Prince2) which the DfT ( or interim GBR) should get all involved to follow.
Not 100% perfect, but the one of the best methods.

The project should not be just a refurbishment, but as a programme of projects to get trains in service with master business case, risk assessment, quality control etc.
Problems like signalling, training etc should be highlighted and costed at an early stage.

Ideally one train should be done first and extensively tested on track with operational staff before the go ahead on other trains.
However with the 442s each train had different wiring, which was not identified as a major problem untill a few trains had been refurbished, but could have been raised as an possible risk at the start of the project.
 