SWR Class 458 to be retained

Status
Not open for further replies.

Invincible

Member
Joined
23 Apr 2022
Messages
853
Location
Surrey
25 years, and a subfleet of just eight units
SWR in it's 2017 bid was going to return all 458s to Porterbrook (along with 455s)when the 701s entered service. But strangely refurbish the 27 year old 422s.
Then covid and the 422 refurb had problems.
Still looks like SWR will return 8 of the 458s once the 701s eventually rollout, but the 455s should be returned before the 458/5s
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LUYMun

Established Member
Joined
15 Jul 2018
Messages
1,382
Location
Cancelled
This evening 458420 and 458415 got into a spot of bother while operating the 2V55 (1837 WAT-TWI) service where at Chiswick smoke was emitting from the 2nd coach. While the fire brigade came and reported no fires, the units have been sent to depot early.
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
This evening 458420 and 458415 got into a spot of bother while operating the 2V55 (1837 WAT-TWI) service where at Chiswick smoke was emitting from the 2nd coach. While the fire brigade came and reported no fires, the units have been sent to depot early.
I do wonder if this is another traction motor issue. A few weeks ago there was a similar occurrence, unit had to be taken out of service due to smoke coming from the motors.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,813
Location
Epsom
A very shiny 458 410 just went through Southampton Parkway ( 12.42 ) on its own in the up direction.

Edited to add back down through Eastleigh at 14.06
 
Last edited:

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,386
Will 8415/8420 issue today affect the first SO diagrams tomorrow? Guessing there's more than enough units to cover them now but though I'd ask?
 

TEW

Established Member
Joined
16 May 2008
Messages
6,226
The issues with the units was yesterday. Looks like the right number of units finished at Feltham Depot tonight for the diagrams tomorrow.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,386
Thanks. On 2s20 now. Just passed Feltham and there's 2x8 still on the yard.
Initial thoughts - theyve done a pretty decent refurb.
Yes, the refurb, but the turd around it has all been left - the rotten windows, rusty heater vents, tired toilets. Can't knock the chaps at Widnes though, they only did what they were instructed. Nice job too.
Mind you, the seats are very comfortable, about the best they've got on the network I'd say. And the ride quality seems better to me as well.
Still don't understand their use on suburban though, they really should put these to their intended use, and free up the higher (~50 per set?) capacity 450s for the busier suburban.
These would be a nice ride on the PDL.

== Doublepost prevention - post automatically merged: ==

And not five mins after I posted, there was a loud crash as a bin cover clattered to the floor, scaring the hell out of half the carriage.!
 

Attachments

  • 20240817_093353.jpg
    20240817_093353.jpg
    3.9 MB · Views: 194

TEW

Established Member
Joined
16 May 2008
Messages
6,226
458408 entering service this afternoon on 2S45, 1522 London Waterloo to Weybridge.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,156
And not five mins after I posted, there was a loud crash as a bin cover clattered to the floor, scaring the hell out of half the carriage.!
That's been a normal feature ever since they were first introduced, but at least the carpet cushions the noise more than the old flooring.
 

swr444

Member
Joined
26 Aug 2008
Messages
994
Location
London
8413 and 8423 just broke down after passing queenstown road causing mayhem on the Windsor side, just in time for rush hour once again there’s a code red.
 

gazr

Member
Joined
24 Mar 2014
Messages
560
8413 and 8423 just broke down after passing queenstown road causing mayhem on the Windsor side, just in time for rush hour once again there’s a code red.
Could be worse. Use P2 for Down trains and run Up trains on the reversible not stopping at QRB.
 

swr444

Member
Joined
26 Aug 2008
Messages
994
Location
London
Could be worse. Use P2 for Down trains and run Up trains on the reversible not stopping at QRB.
Problem was it broke down on the point work I believe, so nothing could get through. Train has now wrong direction moved back onto 3.
 

TEW

Established Member
Joined
16 May 2008
Messages
6,226
Another diagram added next week.

2R03 0615 Twickenham to Waterloo
2S13 0722 Waterloo to Weybridge
2S22 0903 Weybridge to Waterloo
2S27 1052 Waterloo to Weybridge
2S36 1233 Weybridge to Waterloo
2V43 1537 Waterloo to Waterloo via Brentford and Richmond
2R49 1715 Waterloo to Waterloo via Richmond and Brentford
2S59 1852 Waterloo to Weybridge
2S68 2033 Weybridge to Waterloo
2S79 2352 Waterloo to Hounslow
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,156
Another diagram added next week.

2R03 0615 Twickenham to Waterloo
2S13 0722 Waterloo to Weybridge
2S22 0903 Weybridge to Waterloo
2S27 1052 Waterloo to Weybridge
2S36 1233 Weybridge to Waterloo
2V43 1537 Waterloo to Waterloo via Brentford and Richmond
2R49 1715 Waterloo to Waterloo via Richmond and Brentford
2S59 1852 Waterloo to Weybridge
2S68 2033 Weybridge to Waterloo
2S79 2352 Waterloo to Hounslow
Thanks for the update.
 

Chriso

Member
Joined
7 Dec 2006
Messages
526
There coming on thick and fast. When are the Hounslow loop trains returning off-peak?
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,156
They aren’t, the DfT which sets the service specification no longer wishes its service provider to operate those services outside the peaks.
But this is the same DfT which approved Southeastern's restoration of a minimum 4tph off peak to all metro stations from this December, so I see no reason why they wouldn't necessarily approve the same on the South Western in due course.

Plus of course we've been promised a move away from DfT micromanagement.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,476
But this is the same DfT which approved Southeastern's restoration of a minimum 4tph off peak to all metro stations from this December, so I see no reason why they wouldn't necessarily approve the same on the South Western in due course.

Plus of course we've been promised a move away from DfT micromanagement.

And DfT have likewise approved similar enhancements on SWR such as restoration of the 2tph Waterloo to Salisbury last December.

But it doesn’t mean they want to buy them all again!
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,156
And DfT have likewise approved similar enhancements on SWR such as restoration of the 2tph Waterloo to Salisbury last December.

But it doesn’t mean they want to buy them all again!
I agree, but it also doesn't mean that future enhancements will always be ruled out. Anything less than 4tph at London stations really should be addressed ASAP. 2tph has got no place in a modern urban public transport system.
 

swr444

Member
Joined
26 Aug 2008
Messages
994
Location
London
I agree, but it also doesn't mean that future enhancements will always be ruled out. Anything less than 4tph at London stations really should be addressed ASAP. 2tph has got no place in a modern urban public transport system.
Agreed, it’s also a problem at Barnes, Putney and Wandsworth town where all trains come in within 10 mins of each other and then nothing for over 20min.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,087
Location
West Wiltshire
They aren’t, the DfT which sets the service specification no longer wishes its service provider to operate those services outside the peaks.
Interesting thinking by DfT to not restore these services, especially as this week DfT updated its post covid spreadsheet and it is showing rail use at 97% of pre covid on some days (or 107% in the column including Elizabeth line)

 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,963
I agree, but it also doesn't mean that future enhancements will always be ruled out. Anything less than 4tph at London stations really should be addressed ASAP. 2tph has got no place in a modern urban public transport system.
Or timetables like the Guildford fasts which are 3tph but with a half hour gap most hours, that sometimes followed by just a single 5-car train. It's the poorest timetable I can remember on that line, when it was 3tph twenty years ago it was at least even 20 minute intervals.
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
Or timetables like the Guildford fasts which are 3tph but with a half hour gap most hours, that sometimes followed by just a single 5-car train. It's the poorest timetable I can remember on that line, when it was 3tph twenty years ago it was at least even 20 minute intervals.

Just thinking about Waterloo departures you now wouldn’t get a 20 minute frequency without a complete rewrite. Xx:00 would be okay, but xx:20 would clash with the Exeter service, and xx:40 would have to be xx:39 using the old Waterloo - Poole path. That’s before you even get to Guildford, or the very congested Havant - Portsmouth corridor. Then you would have to work out which path was the fast to stop the fast being pathed through the stopper and the semi.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,963
Just thinking about Waterloo departures you now wouldn’t get a 20 minute frequency without a complete rewrite. Xx:00 would be okay, but xx:20 would clash with the Exeter service, and xx:40 would have to be xx:39 using the old Waterloo - Poole path. That’s before you even get to Guildford, or the very congested Havant - Portsmouth corridor. Then you would have to work out which path was the fast to stop the fast being pathed through the stopper and the semi.
Using the 458/4s to reinstate the second Pompey semifast each hour would be my preferred solution! But we seem to be stuck with a chicken and egg situation of poor timetable and reduced revenue reinforcing each other to cause an apparently permanent deterioration of the service.
 
Status
Not open for further replies.

Top