Have Southern/GTR stopped producing leaflet 08 (Hampden Park - Eastbourne)? Not too bothered if they have, as it was one of the most difficult leaflets to get hold of when trying to collect the full Southern set. No .pdf's on the website either.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
Apologies if its been mentioned before but despite CHX to LBG running again from after the August Bank Holiday there is a large gap in train service from CHX to LBG between 7:56 and 9:09. This seems rather odd as it forces any commuters from North/West London to get on the already overcrowded Jubilee line if they work around the Shard area. I assume its to get the stock out of Charing Cross quickly in the high peak but surely to get a some trains to stop every 10/15 minutes to relieve the Jubilee isn't that difficult?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,242
Apologies if its been mentioned before but despite CHX to LBG running again from after the August Bank Holiday there is a large gap in train service from CHX to LBG between 7:56 and 9:09. This seems rather odd as it forces any commuters from North/West London to get on the already overcrowded Jubilee line if they work around the Shard area. I assume its to get the stock out of Charing Cross quickly in the high peak but surely to get a some trains to stop every 10/15 minutes to relieve the Jubilee isn't that difficult?

It was discussed about here: http://www.railforums.co.uk/showthread.php?t=110286&page=106
...in the long running thread about the timetable effects of the London Bridge redevelopment.

I don't know whether it might be better to transfer this question there for consistency, this thread is really about what has already happened in the May 2016 national timetable change...
 

berneyarms

Established Member
Joined
26 Nov 2013
Messages
3,111
Location
Dublin
A fully updated version of the eNRT is now available on the Network Rail site, either as a single pdf file (should please some people here!) and as individual table pdf files.

http://www.networkrail.co.uk/aspx/3828.aspx

Also, updated timetable pdf files are available from the TOC websites:
Scotrail (from Aug 8)
Southeastern (from Aug 28)
Virgin East Coast

Temporary GWR timetables are also available here during the Severn Tunnel works:
https://www.gwr.com/travel-updates/planned-engineering/severn-tunnel
 