The_Engineer
Member
- Joined
- 24 Mar 2018
- Messages
- 524
Long, long ago........Has that suggestion/proposal quietly fell by the wayside?
Long, long ago........Has that suggestion/proposal quietly fell by the wayside?
The problem with that would be the Selby-Huddersfield stoppers would have to be split at Leeds (unless you carried the wires on to Hudds)
A better, more achievable short-term use would be to wire the Harrogate loop. Double track the single sections between Knaresborough and York and make the whole thing half hourly. Lots of untapped potential to remove traffic from the A59 if that section of line had a quicker, more frequent service with nice rolling stock.
Won't happen though, there needs to be somewhere with wires already in situ ready to take trains right now. I can't think of anywhere suitable.
Regarding the electrification of the Harrogate route, I seem to remember reading somewhere back in the second half of the Noughties that there was a proposal to electrify that route with third rail dc and to use former London Underground trains.
Has that suggestion/proposal quietly fell by the wayside?
Back in 2011.Regarding the electrification of the Harrogate route, I seem to remember reading somewhere back in the second half of the Noughties that there was a proposal to electrify that route with third rail dc and to use former London Underground trains.
Has that suggestion/proposal quietly fell by the wayside?
The problem with that would be the Selby-Huddersfield stoppers would have to be split at Leeds (unless you carried the wires on to Hudds)
Splitting it would also mean that platform 14 would finally have a purpose!Is that really a problem? There may be Selby to Huddersfield stoppers, but there are not the equivalent Huddersfield to Selby services - it appears to be purely for operational convenience.
So why not keep the 332s going until some better rolling stock is avaliable, than doing all these 769s which clearly won't be just a fix until the end of December 2019.
The key reason some of those trains were scrapped was because their operator wanted to start new services on infrastructure they could not be made compatible with. Some were scrapped because more new trains were considered better value for money than the neccesary mid life remidal work. I do not quite see how either point relates to this rolling stock.They effectively sit in a similar kind of niche that the Eurostars do.
In short, it doesn’t fit with their plan. As it stands Northern need more diesel stock rather than electric due to the delays/cancellation to electrification.
Also need to remember that the 332s are not owned by a ROSCO and do not have TPWS. They would also need complete interior refit to make them suitable for Northern.
I'm almost certain it would make no business sense performing such major work on a fleet of this age when taken into account with the interior changes that would also be needed (if it's even possible!). As for installing OHLE 'pretty sharpish' in the current climate...From a business perpective, I'd say equipt the units with TPWS and reform the first four units to five car. Then, providing the Harrogate line can be sparked up pretty sharpish, pressed into operation on that line displacing the 170's which can be send to work on the Nottinghams or the Calder Valleys (basically routes which should have more seating, therefore more money spent as more people will be able to travel on a three car 170 than a two car 158 thus keeping the shareholders happy). The remaining four car 332's are then dismantled and are used as spares to keep the fleet going, since spare parts for these units will eventually become hard to come by.
The 170s will be used on Leeds - Southport via Calder Valleydisplacing the 170's which can be send to work on the Nottinghams or the Calder Valleys
And in 2 months time there are not going to be any airport <> piccadilly shuttles. All journeys to the airport from central Manchester will be covered by services from further away.The 170s will be used on Leeds - Southport via Calder Valley
It would be ideal to use the 332s on Manchester Piccadilly to Airport shuttles given that they're geared up for airport work, but there's no chance of a microfleet of 332s based at Allerton, when the rest of the 333s are based at Neville Hill. It wouldn't make sense from a operational point of view.
The key reason some of those trains were scrapped was because their operator wanted to start new services on infrastructure they could not be made compatible with. Some were scrapped because more new trains were considered better value for money than the neccesary mid life remidal work. I do not quite see how either point relates to this rolling stock.
I might well be wrong but I seem to recall that least in the past the 332's were owned by what was BAA. Is it still the case that they're still owned by BAA albeit now called Heathrow Airport Holdings or similar?
If this is the case it may be that they won't be available for redeployment anyway.
Here's the chance for someone to open up an Open Access luxury commuter operation that doesn't use 442s...
Indeed, best get the UN involved.Heretic, how dare you make such a suggestion....
There's also the displaced Heathrow Express Class 332 units that will be available now which comprises of 14 x 4 car trains (plus 5 additional coaches)
It's a shame the GWR contract for HEx wasn't agreed two years ago, Northern could have used the HEx332's to increase capacity on the Airedale Lines and ordered more 195's instead of 331's.
Would somebody be kind enough to explain the benefit of stripping out the interior of these units and fitting TPWS for re-use in various locations when there are (or will shortly be) dozens of 350s, 360s, 379s and 707s (which, admittedly need to be made a little more AC-compatible) as well as all the Mk-3 derived units.
To my mind, these units are best sent abroad or for scrap.
I wonder if they could be of any use in Thailand? They use 360s on the Bangkok Airport Line and they are short of stock.
Well only if HAL want to be stupid about it. What use are trains without a railway to run them on, or a depot to store them in?
Two problems with the 332s being redeployed.
1. They don't have AWS/TPWS
2. Mechanically they are not in the best of shape
That means they will need serious money spent on them if they are to be re-used. Indeed it is possible they would have needed serious money spending on them if they were to have continued on HEX for the remainder of the operating agreement. That's one of a number of reasons why this deal has been done.
Given the glut of emus soon to be available then I can't see any money being spent on the 332s to allow redeployment. Admittedly stranger things have happened but if I were a betting man then I reckon the scrapyard awaits.