YorkshireBear
Established Member
- Joined
- 23 Jul 2010
- Messages
- 9,665
As is Taunton. A Dawlish bypass isn't going to help with either of these.
It just proves my point that no amount of route reopening would help against what has happened
As is Taunton. A Dawlish bypass isn't going to help with either of these.
I note exeter is cut off completely now. Which 50s railway lone will solve that!
As long as the flooding north/east of Taunton has cleared.Ah but it's only till Monday
Can somebody update the position regarding Meldon viaduct - is it rail connected i.e. the head shunt in-use. Is the Quarry open?
A look at Google earth shows rails connected to the site.
Mike.
There are plenty of routes in the UK that run by the sea
There are plenty of routes in the UK that have no realistic parallel route for diversions
There are plenty of routes in the UK that have been closed for periods over the last few years
There's nothing unique about the Dawlish line in this respect.
I'm all for re-opening lines that have a decent business case (or, y'know, opening brand new alignments that aren't necessarily following the trackbed of something built 150 years ago), but...
...an "inland" route through Devon should be assessed alongside other proposed new routes/ infrastructure spending (is it more of a priority than Bristol to Portishead? is it more of a priority than electrifying from Bristol to Weston once the wires reach Temple Meads? is it more of a priority than re-doubling the Exeter - Salisbury line) - not just a blanket assumption that we must reopen every old line.
All very well but one small problem is the fact that the seawall prevents the natural erosion of the cliffs there is no material to replenish the beaches, if you remove the groins then the whole beach will disappear not just the Kennaway tunnel end.
I'm all for re-opening lines that have a decent business case (or, y'know, opening brand new alignments that aren't necessarily following the trackbed of something built 150 years ago), but...
...an "inland" route through Devon should be assessed alongside other proposed new routes/ infrastructure spending (is it more of a priority than Bristol to Portishead? is it more of a priority than electrifying from Bristol to Weston once the wires reach Temple Meads? is it more of a priority than re-doubling the Exeter - Salisbury line) - not just a blanket assumption that we must reopen every old line.
It just proves my point that no amount of route reopening would help against what has happened
there is a political calculation for the Secretary of State to make, many West Country MP's are unhappy with the amount of spending on HS2 whist Devon and Cornwall are getting next it nothing in terms of rail spending, some are even threatening to vote against HS2. Reopening Okehampton - Tavistock would cost £250 Million or approximately 2% of HS2 £14 billion contingency fund.
The weather is central to the case. This stretch of main line [Exeter-Newton Abbott] is unique and is not comparable to other stretches of line you have tried to compare it with in some of your posts.As I keep trying to explain, the (£250m) bill for an inland route through Devon should stand or fall on its own merits - nothing to do with the weather.
The business case methodologies haver been misused and abused to give whatever result was one the politicians required. Electrification on the MML had one of the best business cases I've ever seen, yet it was put prioritised behind lots of other schemes including other electrification schemes, Scottish re-openings, and Crossrail, and further ago Thameslink.
If you prioritised all schemes just on the basis of business case, nothing outside London would ever get done.
In the case of the need for a more reliable route into the far South West, how do you put a value on the wider regeneration and social benefits and political benefits that would arise?
That I agree with, I would like to see the new methodology used for HS2 used to assess reopening other closed rail routes across the country, I wonder if could make some re-openings viable?
With the exception of Portishead, all of your other examples are existing routes that already provide a decent service. None of these would provide anything like the improvement that reopening the mid Devon route would bring because what is there at the moment is already pretty decent
I don't have a problem with giving priority to the schemes with the best business case. Playing politics and tokenism would create a "camel" of a railway.
Something like "the wider regeneration and social benefits and political benefits" is clearly intangible, and sounds like the kind of thing used to prop up a weak case.
Any investment will have some regeneration/ social benefits, whether that's in urban London or rural Devon - you can fiddle these kind of figures however you want (which is why I'm wary of them).
Depends on whether you see reopening redundant lines as an end in itself (or a means to achieving other things) I suppose
...but if you want to spend £250m on an Okehampton route then you need to prove that its better than spending that £250m on other schemes (and, as I've suggested, there are other competing schemes in the south west - would an Okehampton route benefit more people than redoubling the SWT line to Exeter / reopening Bristol to Portishead/ further electrification?) - which scheme would bring about the biggest increase in passenger numbers/ benefit the most people?
Yes. Personally I see the Okehampton route as desirable rather than essential. What is essential, to prevent Plymouth and Cornwall from being inaccessible by rail, is a new inland route. On cost grounds it will probably be easier to pursuade a government to authorise a direct Exeter-Newton Abbott line rather than an Exeter -Plymouth direct line.Surely the best thing to do is to look at the long-term strategic needs of the region? Would a completely new and faster inland alignment be better? Allowing for a reduction in journey times, as well as securing the route from further coastal erosion.
Yes. Personally I see the Okehampton route as desirable rather than essential. What is essential, to prevent Plymouth and Cornwall from being inaccessible by rail, is a new inland route.
As I have explained previously, the past climate is not a useful guide to the future when looking at this particular type of extreme event. The environment has changed, therefore the mathematical return period of such an event becomes considerably shorter.Why is it essential?
Because we've just had the first collapse since 1855?
The problem is that the amount of investment....lets call it what it is rather than subsidy.....is less per head of population in Devon and Cornwall than in the rest of the country. And it is decreasing! Money needs to be spent on infrastructure here!
Mentioned in the thread before was the slow speed (40mph) from Lydford to Plymouth. This was done by the Southern as an economy. The speeds were higher in LSWR days!
Whilst I can understand the romance and nostalgia of reinstating a long-closed route; but is re-opening the Okehampton route the best choice for a Dawlish avoiding line?
What is the Okehampton line meant to be? A secondary diversionary route? Or to take over as the main route, with the Dawlish route being retained for local services and diversions only?
Surely the best thing to do is to look at the long-term strategic needs of the region? Would a completely new and faster inland alignment be better? Allowing for a reduction in journey times, as well as securing the route from further coastal erosion.
Why is it essential?
Because we've just had the first collapse since 1855?
As a resident of the South West affected by this disruption I'd rather they spent hundreds of millions on something else. It's a kneejerk reaction. Dawlish does not close often.
Whilst I can understand the romance and nostalgia of reinstating a long-closed route; but is re-opening the Okehampton route the best choice for a Dawlish avoiding line?
What is the Okehampton line meant to be? A secondary diversionary route? Or to take over as the main route, with the Dawlish route being retained for local services and diversions only?
Surely the best thing to do is to look at the long-term strategic needs of the region? Would a completely new and faster inland alignment be better? Allowing for a reduction in journey times, as well as securing the route from further coastal erosion.
My suggestion for a good next step in that option would be for it to be promoted in the next Greater Western franchise competition - perhaps even as a priced option.
Is there demand to/from Okehampton now? the tracks are there and in money terms would be a lot cheaper to get going. DCR tried it and didn't get off the ground. FGW didn't appear too bothered by them trying and certainly haven't shown any interest in it?
The much hyped "rebellions" in Westminster against HS2 have come to nothing thus far - I doubt that a few MPs from the south west are going to make much difference to it's progress. And since its an area dominated by coalition MPs (of both colours) there's little political advantage for any sitting MP to blame the authorities too much (not as if Devon or Cornwall are high up the Labour list of swing seats).
As I keep trying to explain, the (£250m) bill for an inland route through Devon should stand or fall on its own merits - nothing to do with the weather, nothing to do with ensuring that every route in the UK has a parallel diversion, nothing to do with some crumbs from HS2's leftovers - I suspect that we are going to see a lot of weak schemes being justified with the "...but its a fraction of the cost of HS2..." argument.
I don't have a problem with giving priority to the schemes with the best business case. Playing politics and tokenism would create a "camel" of a railway.
Something like "the wider regeneration and social benefits and political benefits" is clearly intangible, and sounds like the kind of thing used to prop up a weak case.
Any investment will have some regeneration/ social benefits, whether that's in urban London or rural Devon - you can fiddle these kind of figures however you want (which is why I'm wary of them).
Depends on whether you see reopening redundant lines as an end in itself (or a means to achieving other things) I suppose
...but if you want to spend £250m on an Okehampton route then you need to prove that its better than spending that £250m on other schemes (and, as I've suggested, there are other competing schemes in the south west - would an Okehampton route benefit more people than redoubling the SWT line to Exeter / reopening Bristol to Portishead/ further electrification?) - which scheme would bring about the biggest increase in passenger numbers/ benefit the most people?
Option GW3A -Exeter -Okehampton Monday – Sunday -Operation of eight trains per day in each direction between Exeter St David’s and Okehampton services calling at all stations between 06:30 and 20:30 from Exeter St David’s.
Assumed start date: December 2014 subject to rolling stock availability. If rolling stock is a constraint, Bidders should indicate this in the submission and start the service from the earliest achievable timetable change date.
https://www.gov.uk/government/uploa...hment_data/file/3596/invitation-to-tender.pdf