hmm, interesting, anyone know if stuttgart 21 will reduce the journey time from Stuttgart to Tübingen? at the moment it takes a circuitous route & takes and hour, (compared to 30 mins driving).
The thing I find ironic about stuttgart 21 is the political capital the local green party are making from opposing it, do we not need better high speed rai links to compete with short haul aviation to reduce carbon & noise emissions, reduce dependance on fossil fuels & improve energy security etc...
At the moment, according to
http://www.bahnprojekt-stuttgart-ul...chnell_unterwegs/regionalverkehr/default.aspx
the fastest journey time from Stuttgart to Tübingen is 45 minutes (most trains take 61 minutes). It is claimed that Stuttgart 21 will reduce the journey time to 41 minutes and these fast trains will be more frequent. But with only 8 platforms in the new station (as opposed to 16 at present), there isn't much slack in the system. I'm not familiar with the Tübingen area. I believe that some of the lines around there are not electrified and as diesel locomotives will not be allowed to use the new underground station, some passengers who currently have direct services to Stuttgart will have to change trains - in Tübingen? The likelihood that there will be any funding for electrification in the future is reduced by the cannibalisation effect of Stuttgart 21. The line from Stuttgart to Singen has been a single-track route since the end of the war when the French took the second track as a reparation payment. Shouldn't DB be fixing this instead of blowing billions of euros of taxpayers' money on a prestige project that will look good in their privatisation brochures?
You might enjoy this Pro-Stuttgart 21 video. It's a computer-generated fantasy about the HSL between Ulm and Stuttgart which involves digging numerous tunnels through some of the most difficult geology imaginable. Note how the fate of the existing Hauptbahnhof ("Bonatzbau") is glossed over at the end:
http://www.youtube.com/watch?v=rbM0RtOXmxI&feature=player_embedded
The video provides a glimpse of the new, suspiciously white, station but doesn't tell you that it has been given a special dispensation in order to allow it to be built with a 15% slope from one end of the platforms to the other. This means that it will be impossible to couple or separate trains there. The platforms will also have to be built with a transverse slope away from the edge to prevent luggage trolleys from rolling onto the track. That doesn't sound like good planning to me. That sounds like they're desperate to build this thing and grab the land that'll be freed up.
I agree that better rail links are a good idea, but I don't think high-speed rail is always automatically the answer. Isn't it better to invest in giving people the rail services that they can rely on and that connect with each other usefully? An integrated regular-service timetable is what is required. This is possible with the current station, but out of the question with Stuttgart 21.
It's a pity there isn't really any English-language material about the alternatives to Stuttgart 21 as it would be interesting to hear what people in this forum think about them. Non-German speakers could still download the alternative K21 brochure here (6.3 MB)
http://www.kopfbahnhof-21.de/fileadmin/bilder/stellungnahmen/K21_Altern_zu_S21_4_Auflage.pdf and have a look at the diagram of the new airport station (on page 29, PDF-page 15) which would be built as part of Stuttgart 21. There are five escalator levels to negotiate. This is probably good news for ThyssenKrupp but not for people with luggage.
Tomorrow (22 October) the first session in the "mediation" process between S21 opponents and DB/regional government is being held in Stuttgart. This is widely viewed as the pro-faction just playing for time and hoping the protests will die down. There isn't anything to mediate. Either they build it or they don't. But the DB won't even reveal the "true" costs. The interest in this is so intense that the proceedings will be shown live on the web/TV here:
http://www.phoenix.de/content//332677 and here:
http://fluegel.tv/
--- old post above --- --- new post below ---
I am sorry to disagree sir...
I thought I had posted this yesterday but it didn't appear - here goes again:
The SMA study of the Stuttgart 21 project was commissioned by the interior ministry of Baden-Württemberg who then kept it locked away for two years because the study concluded that there was a high risk that the stability of the timetable could not be maintained, that the entire system would be difficult to manage and that there was little scope for changing the timetable to offer additional services.
When the SMA report was leaked to Stern magazine and published, the interior ministry first dismissed it as out of date and then promptly reacted to one of the points criticised in it by agreeing that a second line to the airport was required.
Yes, it will be nice for people from Heilbronn who want to go to the airport and Ulm. But will it work? On the days when everything works perfectly certain S-Bahn routes will be faster. When things go wrong (and they went wrong quite often during the summer) there will no longer be the capacity of the overground platforms at the terminus station to fall back on. Deutsche Bahn is incapable of operating its existing system properly. It is obsessed with cutting investment and maximising profit to get ready for privatisation. And aren't there better ways of spending 10 billion euros of taxpayers' money?
It's going to take exactly ten years to build? The architect Ingenhoven, Sobek the architect/building engineer, and Azer the DB-Projektbau manager don't even know whether the tower of the Hauptbahnhof is built on oak piles or not. The oak piles used to be mentioned on the project web site but then, when people started asking what happens when the groundwater is lowered (won't the oak piles dry out and be weakened?) the reference to them was suddenly removed. Is the tower supported on oak piles or concrete ones? If Azer and company don't know, they shouldn't start lowering the groundwater. If they do know, why don't they tell the public?
Then there are all the difficulties associated with the geology of the Stuttgart area. They will have to tunnel near the existing Wagenburg road tunnel, which was meant to be a twin tunnel but the second bore was abandoned because of the problems with the Gipskeuper - info here:
http://www.schutzbauten-stuttgart.d...nutzung/tabid/374/language/de-DE/Default.aspx
As for defaming politicians... How could anybody defend the politicians who were behind the police action of 30 September?
Concrete and metal wasteland? DB Chairman Rüdiger Grube even called it a "Schandfleck" a "shameful stain" on the city. But it's been there for 150 years (the lines to the first Stuttgart station ran on the same route). The railway lines were there before most of the current city existed. This nonsense about reuniting a divided city is one of the most ridiculous arguments from the pro-Stuttgart 21 side. The real shameful stain on Stuttgart is the hideous, soulless collection of banks built next to the current station. That also applies to the new library which is popularly known as "Stammheim 2".
Many of the 3000 new trees (sometimes it's 5000) will be lining streets. Might look OK in a hundred years or so. At least they will partly obscure the hideous banks and the library. The extra park land will be much further from the city centre park area which will be destroyed by the new station. And the new station will cut the park in half with an 8-metre high grass-covered concrete barrier (actually the station roof but it is optimistically called the Strassbourger Platz) topped with 4-metre high skylights. Ingenhoven, the architect, likes to boast that it will be a zero-energy station? What about the 50 escalators and I don't know how many lifts (at the moment there is completely level access from street level to the platforms)? He says it won't need heating or cooling. How many railway stations this side of Murmansk or Rangoon need heating or cooling? It's just cynical greenwash.
What's going to be built on the land that's freed up? Offices, hotels, unaffordable housing and a shopping centre (built/operated by ECE - who have interesting links to various politicians in Stuttgart - German TV reported on this a few days ago:
http://www.youtube.com/watch?v=g6SHxS9I-Ls&feature=player_embedded ).
And if the rail infrastructure is crumbling at the moment, it's because it has been criminally neglected by DB over the past 15 years.
Mineral water - yes there are tunnels and underground car parks already. But nothing on the scale of the new underground station and its tunnels which run at right angles to the flow of water. There are experts who say the mineral water is at risk. Who knows? If things are left as they are the mineral water will be safe. If the new station is built, it might not.
I will not comment on your opinion of the Stuttgart 21 opponents other than to say that before politicians/DB put pressure on him to blast the protesters with water cannon and pepper spray, Stuttgart Police Chief Siegfried Stumpf said that, in the past decades, he had never seen a protest "by so many intelligent people, with so much creativity and organisational talent".
As for the claim that people had plenty of opportunities to object to S21. Please read this article which appeared in the Süddeutsche Zeitung a few days ago.
http://www.sueddeutsche.de/politik/...stuttgart-und-der-unheilbare-mangel-1.1013415
It shows that the decision to go ahead with Stuttgart 21 was taken in November 1995 and any alleged consultation process was about irrelevant details. The people of Stuttgart have been stitched up by their elected representatives.
K21 (Kopfbahnhof 21 which would keep the terminus station) is an alternative. The space for the additional lines is already there on existing DB land and the bridge would cross the industrial area between Obertürkheim and Mettingen. I'm not sure I'd call that one of the "most beautiful valleys in the Stuttgart area". And in any case, since when did Pro-Stuttgart 21 people give a damn about what the landscape looked like? If Stuttgart 21 is built, train passengers will see nothing of the attractive surroundings of the city as they will be confined to the 60 kilometres of tunnels you want to build. K21 would cost perhaps 1.5 billion euros compared with the offical figure of 4.1 billion for S21.
And the EU isn't funding a single penny of the station part of Stuttgart 21. It is providing some funding for the high-speed line after 2016.
Postscript
Today's mediation session actually went rather well for the S21 opponents. The Deutsche Bahn expert with the permanent grin and Baden-Württemberg environment/transport minister Tanja Gönner failed to come up with any arguments that would justify the vast sums involved in S21.