• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Station overcrowding and trains coming through at speed

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,664
What gets me is that it has quite slender platforms yet gets packed during the peaks and has trains travelling through at speed - the Reading/Manchester XC and some freight services come through at 60mph+. It's not always possible to 'stand behind the yellow line' without nudging and pushing people over towards the other platform or squashing up by the walls.

You may find some drivers might back off - learning from experience how crowded certain stations can be. I know at Stratford (London) some non-stop trains don't run through at linespeed is my perception.
 

theironroad

Established Member
Joined
21 Nov 2014
Messages
3,717
You may find some drivers might back off - learning from experience how crowded certain stations can be. I know at Stratford (London) some non-stop trains don't run through at linespeed is my perception.

Is that because the platform is crowded or because the train is running on restrictive signals or it's using a DAS system or using route knowledge to prevent arriving at a junction early and having to stop for a conflicting move?
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,914
You may find some drivers might back off - learning from experience how crowded certain stations can be. I know at Stratford (London) some non-stop trains don't run through at linespeed is my perception.

Unless the train can stop on a sixpence that seems to be only a gesture.
 

boxy321

Member
Joined
20 Jun 2016
Messages
449
Trains to Whitlocks End don't go through Solihull. Whitlocks End is on the North Warwickshire line not on the Didcot to Chester line.

As far as Solihull is concerned the platforms at Solihull are far better than 15 years ago; when Chiltern wanted to extend the platforms back to 8-cars, CT, who was still the SFO at that point, insisted that NRIL levelled and brought them up to standard to produce compliant platform stepping distances.

There is only a problem with passing Voyagers or freight trains if passengers insist on congregating around the entrance, if they walk either way along the platforms there is plenty of room to stand on the platform well away from the tactiles and yellow lines.

A large number of people do now walk down to the south end of the platform at Solihull due to overcrowding by the entrance and waiting room. If they expect a class 68 mainline train and a small 3 coach 172 turns up that's a lot of people trying to get in one door at the back. The announcements often give incorrect train lengths and an LM 6 coach train often arrives unexpectedly (not a bad thing and even with a full platform, it's half empty to Moor St.).

I didn't realise Whitlocks End had become one of these new 'parkway' type stations so thanks for that info.
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,334
Location
Reading
I use Solihull station everyday and it is becoming busier and busier, like many provincial places where the roads nearby get gridlocked in the morning.

What gets me is that it has quite slender platforms yet gets packed during the peaks and has trains travelling through at speed - the Reading/Manchester XC and some freight services come through at 60mph+.

The exit barriers at Slough station are built out onto the Down Main platform.

HSTs come through at 125mph and you are worried about 60mph?

Wimps! <D
 
Last edited:

theageofthetra

Established Member
Joined
27 May 2012
Messages
3,565
Location
Beckenham
On Japanese lines where there is more than a bit of overcrowding on narrow platforms- a fast train that is not stopping has lights flashing and horn going on approach (a bit like US practice)
 

321446

Member
Joined
15 Nov 2008
Messages
223
Location
Southend Stations
There does seem to be a worrying amount of people for who a station platform is an alien environment. I was "lucky" in that I was using trains from a lad, so had stay back from the platform edge beaten into me from an early age. When a passenger myself, I note the "excited" yelps from the younger generation as a train barrels through Shenfield apparently totally unexpectedly for example (most things stop). More so if it's a container train as alluded to above, the "suck'n'blow" of a train of spaced out containers is quite noticeable.

However, a well packed platform at, say, Romford seen from the cab is quite a vexing sight. My 321 may not have quite the presence of a Class 66 with a load of containers, but it is noticeable that despite platform staff, announcements, horn and big yellow platform markings (the platform staff bring those to the attention of those who for whatever reason are unable to hear or see them) there is a number of people who are oblivious to the effect of over 100 ton of fast moving metal passing less than a foot from their ear.

Even when those who are aware of their environment do and have moved down, there will always be those who just see the yellow hatched path between people's noses and the edge of the platform as an easy path to where they are going. You can educate some of those, my arrival hopefully accounts for some of their re-education, but some you will never reach (hopefully literally not reach).

Without heavily modifying every through platform, the only way is education by experience. Those you don't educate because they don't care will continue to be oblivious. Hopefully the worse thing that will happen to them is they will forget they've left a brick of lego on the lounge floor and they'll find it with their bare feet.
 

Chris M

Member
Joined
4 Feb 2012
Messages
1,060
Location
London E14
On Japanese lines where there is more than a bit of overcrowding on narrow platforms- a fast train that is not stopping has lights flashing and horn going on approach (a bit like US practice)

Every DLR train that passes through a station out of service, regardless of speed, sounds the horn as it approaches the platform. And again as it passes through if necessary.
 

centraluser

Member
Joined
1 Jan 2013
Messages
68
Biggest problem is also the same issue as Moor Street (Both run by Chiltern Railway), unlike London Midland Chiltern don't announce the train length resulting in people congregating around the Stairwell / buildings. Commuters are very good at learning train lengths but every busy period still has large numbers of unfamiliar congregators.

A message about train length and perhaps a little education about carriage stop signs would go a long way but is clearly no where near a magic bullet due to train vehicle lengths differences. (all trains that stop at Solihull on a regular basis are C3 (23m) I believe)

For historical reasons, the screens (and auto-announcing systems) at Solihull are owned and operated by London Midland. Chiltern have no direct access to the systems, except for live local announcements.

All train running information is fed from Darwin, which does not hold data relating to the number of carriages that a train is formed of.

Given that Chiltern do not routinely program in their train lengths to their Customer Information System for Southbound trains, I would say that the likelihood of auto-announcing train lengths at Solihull (which LM would have to input) is very low.
 

daikilo

Established Member
Joined
2 Feb 2010
Messages
1,623
As the problem would appear to be shortly before the arrival of morning peak hour trains in one direction and maybe only on weekdays, how about a "signalling solution" where the few non-stop trains preceding a stopper would see caution signals on the approach to Solihull.

A second solution would be to build an additional platform on one of the old four-track beds and close off that side of the island.

A third would be to slew one of the tracks onto the outer trackbed and widen the island but this almost certainly would lead to a significant closure period.

Of these, the first makes the most sense to me as a quick win, but a long term solution is probably also needed.
 
Last edited:

221129

Established Member
Joined
21 Mar 2011
Messages
6,515
Location
Sunny Scotland
As the problem would appear to be shortly before the arrival of morning peak hour trains in one direction and maybe only on weekdays, how about a "signalling solution" where the few non-stop trains preceding a stopper would see caution signals on the approach to Solihull.

Definitely not!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,749
Location
"Marston Vale mafia"
I witnessed quite a dangerous incident along these lines yesterday at Lancaster. The PIS announced "Platform 3 for the xx.xx service to Barrow in Furness", shortly followed by a 185 on a Glasgow service belting through at linespeed with no warning. Although you're not meant to until the train stops, passengers had already started to move forward to board, and some were quite taken aback.

I'm surprised a modern PIS didn't announce a warning, but this really needs fixing. If it can't be, the through train needs to be scheduled to pass through at reduced speed, and a manual "stand away" announcement done.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
I witnessed quite a dangerous incident along these lines yesterday at Lancaster. The PIS announced "Platform 3 for the xx.xx service to Barrow in Furness", shortly followed by a 185 on a Glasgow service belting through at linespeed with no warning. Although you're not meant to until the train stops, passengers had already started to move forward to board, and some were quite taken aback.

I'm surprised a modern PIS didn't announce a warning, but this really needs fixing. If it can't be, the through train needs to be scheduled to pass through at reduced speed, and a manual "stand away" announcement done.

Why was a 185 belting through Platform 3 at Lancaster at linespeed? Why wasn't it on the through lines? I thought the platform loops were (relatively) low speed anyway?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,749
Location
"Marston Vale mafia"
Why was a 185 belting through Platform 3 at Lancaster at linespeed? Why wasn't it on the through lines? I thought the platform loops were (relatively) low speed anyway?

It went through at a reasonable pelt - not 100mph but reasonably quick. Definitely on platform 3. No idea why, though apparently "it happens all the time, people get confused because it stops on a weekday".

As the Barrow was coaches D, E and F does it portion work with that and split at Preston I wonder? Was the one arriving Ulverston at 1501, I think it was 1413 off LAN.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
It went through at a reasonable pelt - not 100mph but reasonably quick. Definitely on platform 3. No idea why, though apparently "it happens all the time, people get confused because it stops on a weekday".

As the Barrow was coaches D, E and F does it portion work with that and split at Preston I wonder? Was the one arriving Ulverston at 1501, I think it was 1413 off LAN.

Not quite clear what services you are trying to describe. The TPE is actually booked via Platform 3 but this doesn't answer your question, unfortunately.
Usually, there is a message requesting people stand back as "the next train does not stop here".
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,749
Location
"Marston Vale mafia"
Usually, there is a message requesting people stand back as "the next train does not stop here".

There wasn't in this case - indeed, the "Platform 3 for the 1413 service to Barrow..." had seemingly been triggered prior to it arriving, which was the dangerous (and confusing) occurrence. Passengers were specifically expecting a train to stop which didn't.

Correction, 1423, sorry. Just looked at RTT, it isn't portion worked, it starts at Preston.
 
Last edited:

daveo

Member
Joined
13 Dec 2015
Messages
238
There wasn't in this case - indeed, the "Platform 3 for the 1413 service to Barrow..." had seemingly been triggered prior to it arriving, which was the dangerous (and confusing) occurrence. Passengers were specifically expecting a train to stop which didn't.

Correction, 1423, sorry. Just looked at RTT, it isn't portion worked, it starts at Preston.

That service, and the preceding Glasgow service did indeed arrive in Preston as one train, and divided there. I travelled on the BIF service from Preston to Carnforth, and was amused by the schizophrenic unit. It arrived as a TPE service from Manchester (the conductor confirmed that as one unit it was TPE) but when the units split it changed into a Northern service!!
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
I can only take from this and the evidence from RTT that the down through line is out of use for whatever reason. Perhaps the PIS does not provide for this eventuality. The speed through the platform is definitely not low.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,749
Location
"Marston Vale mafia"
That service, and the preceding Glasgow service did indeed arrive in Preston as one train, and divided there. I travelled on the BIF service from Preston to Carnforth, and was amused by the schizophrenic unit. It arrived as a TPE service from Manchester (the conductor confirmed that as one unit it was TPE) but when the units split it changed into a Northern service!!

The on-board PIS claimed it was TPE all the way to Ulverston, FWIW.

Irritatingly, reservations had not been placed.

That route is no stranger to multi-TOC workings - in the pre-1998 timetable a NWRR NorthWest Express class 156 left Manchester Airport coupled to an ICWC 158, ran to Bolton where they split with the 156 running via Wigan to Barrow/Windermere and the 158 running via Chorley to Preston, where it coupled to another 158 coming from Liverpool and proceeded to Scotland. One such service was the 1708 from Manchester Oxford Road, but there were others.
 
Last edited:

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,144
Location
Redcar
I can only take from this and the evidence from RTT that the down through line is out of use for whatever reason. Perhaps the PIS does not provide for this eventuality. The speed through the platform is definitely not low.

I suppose it depends what is defined as low. The permitted speed is 40mph.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,749
Location
"Marston Vale mafia"
I suppose it depends what is defined as low. The permitted speed is 40mph.

Still not great if people are moving forward past the yellow line to board. (I know they shouldn't have been, but they were!)

One of those cases where no information would have been better than wrong information.
 

boxy321

Member
Joined
20 Jun 2016
Messages
449
As the problem would appear to be shortly before the arrival of morning peak hour trains in one direction and maybe only on weekdays, how about a "signalling solution" where the few non-stop trains preceding a stopper would see caution signals on the approach to Solihull.

A second solution would be to build an additional platform on one of the old four-track beds and close off that side of the island.

A third would be to slew one of the tracks onto the outer trackbed and widen the island but this almost certainly would lead to a significant closure period.

Of these, the first makes the most sense to me as a quick win, but a long term solution is probably also needed.

There's ideas being thrown about to move Solihull Station south (making a new build simpler than existing station upgrades), which most people do not want however. There are definite plans to spend a lot of money there, probably starting in about 5 years time.

BTW, got from Moor St. to Solihull on a 168 in 6.5 minutes this morning! Driver gave it welly to 90mph right from the off as the LM train was late and had been overtaken. Put a smile on my face as it got me to work faster than the 5min earlier LM train would have!
 

FGW_Lad

Member
Joined
19 Mar 2011
Messages
150
Location
Berkshire
The exit barriers at Slough station are built out onto the Down Main platform.

HSTs come through at 125mph and you are worried about 60mph?

Wimps! <D

100% Agree! Watch passengers on P2/P3 suddenly get the fright of their lives when a HST blasts through! :)
 

boxy321

Member
Joined
20 Jun 2016
Messages
449
As the problem would appear to be shortly before the arrival of morning peak hour trains in one direction and maybe only on weekdays, how about a "signalling solution" where the few non-stop trains preceding a stopper would see caution signals on the approach to Solihull.

A second solution would be to build an additional platform on one of the old four-track beds and close off that side of the island.

A third would be to slew one of the tracks onto the outer trackbed and widen the island but this almost certainly would lead to a significant closure period.

Of these, the first makes the most sense to me as a quick win, but a long term solution is probably also needed.

There's ideas being thrown about to move Solihull Station south (making a new build simpler than existing station upgrades), which most people do not want however. There are definite plans to spend a lot of money there, probably starting in about 5 years time.

BTW, got from Moor St. to Solihull on a 168 in 6.5 minutes this morning! Driver gave it welly to 90mph right from the off as the LM train was late and had been overtaken. Put a smile on my face as it got me to work faster than the 5min earlier LM train would have!
 

daikilo

Established Member
Joined
2 Feb 2010
Messages
1,623
There's ideas being thrown about to move Solihull Station south (making a new build simpler than existing station upgrades), which most people do not want however. There are definite plans to spend a lot of money there, probably starting in about 5 years time.

Ah, so it is recognised that there is a problem that needs to be addressed but money will determine the solution and timeline. Let's hope there is no accident in the interim.
 
Status
Not open for further replies.

Top