Bletchleyite
Veteran Member
Followed by a 2 car 150 rolling in![]()
I'm sure I recall a LU station (forget which one) that had an automatic announcement saying "please use the full length of the platform" when a short Circle Line train arrived.
Followed by a 2 car 150 rolling in![]()
What gets me is that it has quite slender platforms yet gets packed during the peaks and has trains travelling through at speed - the Reading/Manchester XC and some freight services come through at 60mph+. It's not always possible to 'stand behind the yellow line' without nudging and pushing people over towards the other platform or squashing up by the walls.
You may find some drivers might back off - learning from experience how crowded certain stations can be. I know at Stratford (London) some non-stop trains don't run through at linespeed is my perception.
You may find some drivers might back off - learning from experience how crowded certain stations can be. I know at Stratford (London) some non-stop trains don't run through at linespeed is my perception.
Trains to Whitlocks End don't go through Solihull. Whitlocks End is on the North Warwickshire line not on the Didcot to Chester line.
As far as Solihull is concerned the platforms at Solihull are far better than 15 years ago; when Chiltern wanted to extend the platforms back to 8-cars, CT, who was still the SFO at that point, insisted that NRIL levelled and brought them up to standard to produce compliant platform stepping distances.
There is only a problem with passing Voyagers or freight trains if passengers insist on congregating around the entrance, if they walk either way along the platforms there is plenty of room to stand on the platform well away from the tactiles and yellow lines.
Unless the train can stop on a sixpence that seems to be only a gesture.
I use Solihull station everyday and it is becoming busier and busier, like many provincial places where the roads nearby get gridlocked in the morning.
What gets me is that it has quite slender platforms yet gets packed during the peaks and has trains travelling through at speed - the Reading/Manchester XC and some freight services come through at 60mph+.
Apart from the OP.I have never suggested they did. I don't think anyone else has either.
On Japanese lines where there is more than a bit of overcrowding on narrow platforms- a fast train that is not stopping has lights flashing and horn going on approach (a bit like US practice)
Biggest problem is also the same issue as Moor Street (Both run by Chiltern Railway), unlike London Midland Chiltern don't announce the train length resulting in people congregating around the Stairwell / buildings. Commuters are very good at learning train lengths but every busy period still has large numbers of unfamiliar congregators.
A message about train length and perhaps a little education about carriage stop signs would go a long way but is clearly no where near a magic bullet due to train vehicle lengths differences. (all trains that stop at Solihull on a regular basis are C3 (23m) I believe)
As the problem would appear to be shortly before the arrival of morning peak hour trains in one direction and maybe only on weekdays, how about a "signalling solution" where the few non-stop trains preceding a stopper would see caution signals on the approach to Solihull.
I witnessed quite a dangerous incident along these lines yesterday at Lancaster. The PIS announced "Platform 3 for the xx.xx service to Barrow in Furness", shortly followed by a 185 on a Glasgow service belting through at linespeed with no warning. Although you're not meant to until the train stops, passengers had already started to move forward to board, and some were quite taken aback.
I'm surprised a modern PIS didn't announce a warning, but this really needs fixing. If it can't be, the through train needs to be scheduled to pass through at reduced speed, and a manual "stand away" announcement done.
Why was a 185 belting through Platform 3 at Lancaster at linespeed? Why wasn't it on the through lines? I thought the platform loops were (relatively) low speed anyway?
It went through at a reasonable pelt - not 100mph but reasonably quick. Definitely on platform 3. No idea why, though apparently "it happens all the time, people get confused because it stops on a weekday".
As the Barrow was coaches D, E and F does it portion work with that and split at Preston I wonder? Was the one arriving Ulverston at 1501, I think it was 1413 off LAN.
Usually, there is a message requesting people stand back as "the next train does not stop here".
There wasn't in this case - indeed, the "Platform 3 for the 1413 service to Barrow..." had seemingly been triggered prior to it arriving, which was the dangerous (and confusing) occurrence. Passengers were specifically expecting a train to stop which didn't.
Correction, 1423, sorry. Just looked at RTT, it isn't portion worked, it starts at Preston.
That service, and the preceding Glasgow service did indeed arrive in Preston as one train, and divided there. I travelled on the BIF service from Preston to Carnforth, and was amused by the schizophrenic unit. It arrived as a TPE service from Manchester (the conductor confirmed that as one unit it was TPE) but when the units split it changed into a Northern service!!
I can only take from this and the evidence from RTT that the down through line is out of use for whatever reason. Perhaps the PIS does not provide for this eventuality. The speed through the platform is definitely not low.
Definitely not!
I suppose it depends what is defined as low. The permitted speed is 40mph.
As the problem would appear to be shortly before the arrival of morning peak hour trains in one direction and maybe only on weekdays, how about a "signalling solution" where the few non-stop trains preceding a stopper would see caution signals on the approach to Solihull.
A second solution would be to build an additional platform on one of the old four-track beds and close off that side of the island.
A third would be to slew one of the tracks onto the outer trackbed and widen the island but this almost certainly would lead to a significant closure period.
Of these, the first makes the most sense to me as a quick win, but a long term solution is probably also needed.
The exit barriers at Slough station are built out onto the Down Main platform.
HSTs come through at 125mph and you are worried about 60mph?
Wimps!![]()

As the problem would appear to be shortly before the arrival of morning peak hour trains in one direction and maybe only on weekdays, how about a "signalling solution" where the few non-stop trains preceding a stopper would see caution signals on the approach to Solihull.
A second solution would be to build an additional platform on one of the old four-track beds and close off that side of the island.
A third would be to slew one of the tracks onto the outer trackbed and widen the island but this almost certainly would lead to a significant closure period.
Of these, the first makes the most sense to me as a quick win, but a long term solution is probably also needed.
There's ideas being thrown about to move Solihull Station south (making a new build simpler than existing station upgrades), which most people do not want however. There are definite plans to spend a lot of money there, probably starting in about 5 years time.
Ah, so it is recognised that there is a problem that needs to be addressed but money will determine the solution and timeline. Let's hope there is no accident in the interim.