• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Starting over: a redesigned UK rail network

Status
Not open for further replies.

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,327

Thank you - very interesting map. Of course this would only have been the starting point, and there would be plenty of gaps to flll - numerous large towns in Scotland, Wales & England were omitted from this first phase - and suburban networks serving the larger cities. Too complicated to list everything here, but, amongst many other places, railways would need to serve Greenock, Paisley, Livingstone, Sunderland, Dewsbury, Burnley, Derby, Shrewsbury, Hereford, etc., together with lines to serve the larger seaside resorts such as Blackpool, Scarborough, North & West Wales coasts, Torquay, Southend, Great Yarmouth, etc.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Please do because I really don't have the time.
https://www.google.com/maps/d/edit?hl=en&mid=1-QPx-0KyR4mc1yn5iJoGWyp7evkbR7dT&ll=51.22640642187166,0.571699442520412&z=9

Thank you - very interesting map. Of course this would only have been the starting point, and there would be plenty of gaps to flll - numerous large towns in Scotland, Wales & England were omitted from this first phase - and suburban networks serving the larger cities. Too complicated to list everything here, but, amongst many other places, railways would need to serve Greenock, Paisley, Livingstone, Sunderland, Dewsbury, Burnley, Derby, Shrewsbury, Hereford, etc., together with lines to serve the larger seaside resorts such as Blackpool, Scarborough, North & West Wales coasts, Torquay, Southend, Great Yarmouth, etc.
If you wanted to expand upon it you could always make a copy of the document and edit it yourself.
 

Jnismith

Member
Joined
29 Dec 2011
Messages
13
In the situation given, I.e. no Railways at all, why would you start again. Surely it would be better to optimise use of the road network or find a new technology. Building heavy rail from scratch doesn’t make sense on a crowded 66 million country.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
(Or, How I Learned To Stop Worrying And Love Crayons)

Coldplay famously sang that they were just guessing at numbers and figures. Well, this thread is about pulling the science apart. And, yes, nobody said it was easy. We're going back to the start.

Welcome to Britain. A small island of the coast of Europe. Population: about 66 million. But there's one catch.

You see, Beeching, Marples and co. didn't hold back when they enacted their 'plan' for the railways in the 1960s. They reduced the railway network massively in its scope. And Serpell did for the rest in the 1980s. In fact, all the mainlines were shut down, the alignments obliterated. All that remain are the subway networks in London, Newcastle and Glasgow.

For years, people have campaigned for the reopening of the railways. Finally, the government has buckled. They've decided to commission a whole new railway network for the UK. Someone's been put in charge of planning it all.

And that person is you. It's your job to create the UK's rail network. Where would you put your mainlines and branch lines? Which towns would you connect, which cities would you link together? Would you do things any differently?

Obviously, this is all completely theoretical - and there's no suggestion that Beeching or Serpell would ever have closed all the railways. Your job is to design the new network.

I am sorry minster but it is completely impossible to deliver this plan. The cost would be astronomical and the bad publicity would make such a decision politically "brave". The public may want trains but once they relasie that to create such a network will result in the compulsory purchase and demolition of their homes and vast tracts of city centres they will soon change their tune. Once they notice their taxes will have to rise to pay for all this they will soon change their tune. it simply cant be done.

We don't even have the people, skills, experience or equipment needed to undertake such a vast construction enterprise. We are going to have to bring it all in from abroad. How will that look to your UKIP coalition partners? Minster please they can go on all they like about Britain of the 1950's but at least then we had people skilled in building railways. We don't now!

No Minster we cant simply buy these skills in. Look at the recent bad publicity surrounding the failure of Carillion. We cant risk that kind of failure again. There are so many of our contract lawyers caught up in the post brexit trade deals that they haven't the time to look at new contracts for railway construction and operation.

What I would suggest we do is arrange for a Commission to be created to look into the costs and returns associated with such a development and await their advice. That should easily push the issue into the next Parliament, by which time you will have been reshuffled twice!
 
Last edited:

SEClass375

Member
Joined
16 Aug 2016
Messages
112
Here is an update on my SE Network Map:
I have done almost all of the Western Section but I need to sort out a mistake in the London Area and a spelling mistake I have just noticed.
What do you guys think so far
 

Attachments

  • SELKentNew.svg
    140.2 KB · Views: 32

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
I am sorry minster but it is completely impossible to deliver this plan. The cost would be astronomical and the bad publicity would make such a decision politically "brave". The public may want trains but once they relasie that to create such a network will result in the compulsory purchase and demolition of their homes and vast tracts of city centres they will soon change their tune. Once they notice their taxes will have to rise to pay for all this they will soon change their tune. it simply cant be done.

We don't even have the people, skills, experience or equipment needed to undertake such a vast construction enterprise. We are going to have to bring it all in from abroad. How will that look to your UKIP coalition partners? Minster please they can go on all they like about Britain of the 1950's but at least then we had people skilled in building railways. We don't now!

No Minster we cant simply buy these skills in. Look at the recent bad publicity surrounding the failure of Carillion. We cant risk that kind of failure again. There are so many of our contract lawyers caught up in the post brexit trade deals that they haven't the time to look at new contracts for railway construction and operation.

What I would suggest we do is arrange for a Commission to be created to look into the costs and returns associated with such a development and await their advice. That should easily push the issue into the next Parliament, by which time you will have been reshuffled twice!
All valid points.

However, this is a completely theoretical scenario centred on what the network would look like.

Here is an update on my SE Network Map:
I have done almost all of the Western Section but I need to sort out a mistake in the London Area and a spelling mistake I have just noticed.
What do you guys think so far
Very nice! I have to say I like this map quite a lot.
 

SEClass375

Member
Joined
16 Aug 2016
Messages
112
Completed the South East Rail Map for the railways proposed by backontrack
 

Attachments

  • SELKentNew.png
    2.8 MB · Views: 28
  • SELKentNew.svg
    212.5 KB · Views: 25

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
All valid points.

However, this is a completely theoretical scenario centred on what the network would look like.

If cost and geography are no problem you would build a network of high speed lines running out of London serving the major towns and cities and between key cities further north.. The general axis of the current mainlines is about right but the news lines would be a lot straighter and much faster. Those HS stations would act as a hub for a further network of rapid commuter style trains with attached tram/ light rail where suitable. Personally I think this is going to need a lot of tunneling & underground caverns to put stations right in the heart of cities.

Freight infrastructure focused on distribution of modern goods rather than what worked in the past. Link up ports and distribution centres to central freight handling locations in key towns and cities. Any key industry we have left to be considered. That is going to be bulk transfer of imported fuels.

All those lovely but silly branchlines lines that spotters love would be long gone. Not worth the trouble.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
I guess the question is whether the idea is “how would you build a heavy rail network from scratch to reflect travel needs in the twenty first century” or “how would you build a country from scratch to reflect people’s idealistic stuff about how they’d like the country to look”.

I’d go with the former, in which case your starting point would be to assess which markets are big enough to justify the kind of large volumes of people suited to heavy rail.

That doesn’t mean insisting everything is profitable but at least trying to focus on markets where hundreds/ thousands of people want to travel.

So, in the absence of any existing railways to use as a benchmark, I’d look at a map of motorways. Look at a map of “trunk roads”. Look at busy coach services (since coaches would presumably have taken a much bigger chunk of long distance travel than they currently have?). Look at frequent inter-urban bus services (as a rule of thumb with real life re-openings, if an inter-urban route can sustain a frequent commercial bus service – like Stirling – Alloa – then there’s scope for a railway).

If places aren’t near a motorway/ trunk road and don’t have a frequent coach service then they probably aren’t going to be busy enough for heavy rail to be justified.

Everything is electrified from day one, obviously. Build trains/ gauges to ensure there’s no need for 3+2 seating.

Come up with a threshold for whether a line will be busy enough to warrant heavy rail. Say a half hourly service with a three coach EMU. If your line won’t justify that then it doesn’t get built. Say at least 250,000 journeys per annum at each station? So each station is big enough to be staffed (and potentially barriered), no need to by on board. DOO for doors (you’d build new stations with straight platforms) but at least one other employee on all trains – more in the case of trains over a certain length (e.g. 200m).

Forget about freight. Or at least forget about mixing it with passenger services. If there’s a business case for dedicated freight lines between ports/ distribution centres/power stations then build it, but I’d be wanting a passenger railway where 100mph+ is standard, and I can’t see any room for slow irregular freight services. And, whilst you can build new passenger lines to attract human beings, if we’ve not had freight trains since the 1960s (?) then presumably the word coped moving its coal/ steel/ cement/ nuclear fuels around by road?

Forget about most suburban train services – give provincial cities budgets for their own light rail networks. You can run Supertram/ Metrolink without operating subsidies, compared to “forty pence per mile” subsidy for heavy rail, so it’s not worth it in a lot of cases.

Parkway stations where lines cross motorways and ring roads.

If you are starting from scratch then there’s obviously no reason why you’d have to follow the routes that we currently have. If we build them to a fast enough alignment (say 125mph minimum ) then one line can link as many intermediate places as two or three existing routes. I’m not saying that everything has to stop everywhere, but if you’re going to start from scratch then you can get a lot more bang for your buck and they’ll still compete with motorway journey times.

So maybe Leeds – Manchester runs through Bradford, Huddersfield AND Oldham. A 125mph train would still do that faster than Leeds – Manchester on the M62.

London –Newcastle could run through Luton, Milton Keynes, Northampton, Leicester, Nottingham, Sheffield, Barnsley, Wakefield, Leeds, Harrogate, Darlington, Durham, Washington and Gateshead (and still be faster than the M1).

Manchester – Chester could run through the Trafford Centre, Warrington, Liverpool Airport, Liverpool and Birkenhead.

London to Peterborough via Stratford, Stansted and Cambridge. That kind of thing. If you build lines that can run fast enough then you don’t need to travel as the crow flies.

That’d mean some areas would have very little railway. If “Cardiff” had a budget for their own light rail/metro network then the only heavy rail in Wales might be along the south coast to Carmarthen and along the north coast to Bangor (possibly Holyhead). I doubt you’d build anything in Scotland north/west of the Glasgow – Aberdeen line. You’d struggle to justify brand new lines in places like Lincolnshire, the Cumbrian coast and other rural areas.

At the same time, some areas would have much more. I could see significantly more lines around the biggest cities – London would end up resembling Chuggington! But that’d only work in places with high population density. Focus resources on where services will be most used. That means that heavy rail won’t be the answer to everything but it means that heavy rail can focus on what it does best, instead of the messy network that we currently have.
 

SEClass375

Member
Joined
16 Aug 2016
Messages
112
My ideas and thoughts if we start over:

I'm not bothered about where the trains go execpt in London and Kent and backontrack has made a map that I like for that section.
Also, try and guess which class/type of train I am biased to from what I have said.

Management:
The railways will be split up into locational areas and an intercity brand.
They will be somewhat privatised however in the different sections there will be a general meeting every 6/12 months with local MPs to discuss how well the section is being run, putting forward suggestions generated from the public and to assess if the franchisee can continue running the section.

Branding:
Franchisees have no control over branding whatsoever.
Branding is different for each section.
Branding must last at least 5 years minimum as so not to confuse the public.
Where a station serves 2 or sections, the branding is to be the neutral national rail branding

Electrification:
Ideally the whole network is to be electrified either by 25kV AC OHLE or 750V DC 3rd Rail.
InterCity routes must have 25kV AC OHLE.
Rural routes must have 750V DC 3rd Rail as to not spoil the area.

Signalling and Infrastructure:
InterCity routes must have in cab signalling to allow 225km/h / 140mph + speeds.
Each station is to have at least one passenger information screen for one platform.
InterCity and as many mainline routes as possible to have slow and fast lines.
InterCity lines must be kept seperate to other lines to to in cab signalling on intercity lines and rolling stock only

Rolling Stock(split into 4 different categories):
InterCity:
To have a selection of 5 car and 9 car AC Hitachi A-train HST with comfy 2+2 seating (2+1 in first) (basically a class 395/801).
Mainline:
To have mainly 4 car and some 3 car AC and DC ADtranz Electrostar with comfy 2+2 seating (2+1 in first) (basically a class 375) and end gangways.
Rural/Branch:
To have a selection of 2 car(no 1st class) and 3 car AC and DC ADtranz Electrostar with comfy 2+2 seating (2+1 in first) and end gangways.
Suburban/Metro:
To have a selection of 4 car and 6 car (no 1st class on all) AC and DC ADtranz Electrostar with slimline 2+2 seating (sounding like, but better than, a class 376)

Tickets:
You must have a seat resevervation to travel on an InterCity service.
Appropiate railcards like existing ones to be used.
Pricing: idk
Style of Tickets:
Non InterCity tickets to be printed on credit card sized stock.
InterCity tickets and ticket that include InterCity portion to be printed on DL sized stock. See attached picture.
Information placement to be researched properly and tested.
Purchacing of ticket:
All ticket machines must be debranded.
Every station must have facilities to buy tickets with card and cash as well as collecting tickets bought online.
Every ticket office, ticket machine and certified online booking sites must sell all available walk-up tickets.
One centralised booking site.

That is what I have thought of so far.
 

Attachments

  • InterCity ticket.png
    InterCity ticket.png
    66.3 KB · Views: 34

LOL The Irony

Established Member
Joined
29 Jul 2017
Messages
5,335
Location
Chinatown, New York
If cost and geography are no problem you would build a network of high speed lines running out of London serving the major towns and cities and between key cities further north.. The general axis of the current mainlines is about right but the news lines would be a lot straighter and much faster. Those HS stations would act as a hub for a further network of rapid commuter style trains with attached tram/ light rail where suitable. Personally I think this is going to need a lot of tunneling & underground caverns to put stations right in the heart of cities.

Freight infrastructure focused on distribution of modern goods rather than what worked in the past. Link up ports and distribution centres to central freight handling locations in key towns and cities. Any key industry we have left to be considered. That is going to be bulk transfer of imported fuels.

All those lovely but silly branchlines lines that spotters love would be long gone. Not worth the trouble.
Like this?
https://drive.google.com/open?id=1RcJnj_PzgYJihS_0NhDBz3uMznMmmFpS&usp=sharing
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
I guess the question is whether the idea is “how would you build a heavy rail network from scratch to reflect travel needs in the twenty first century” or “how would you build a country from scratch to reflect people’s idealistic stuff about how they’d like the country to look”.

I’d go with the former, in which case your starting point would be to assess which markets are big enough to justify the kind of large volumes of people suited to heavy rail.

That doesn’t mean insisting everything is profitable but at least trying to focus on markets where hundreds/ thousands of people want to travel.

So, in the absence of any existing railways to use as a benchmark, I’d look at a map of motorways. Look at a map of “trunk roads”. Look at busy coach services (since coaches would presumably have taken a much bigger chunk of long distance travel than they currently have?). Look at frequent inter-urban bus services (as a rule of thumb with real life re-openings, if an inter-urban route can sustain a frequent commercial bus service – like Stirling – Alloa – then there’s scope for a railway).

If places aren’t near a motorway/ trunk road and don’t have a frequent coach service then they probably aren’t going to be busy enough for heavy rail to be justified.

Everything is electrified from day one, obviously. Build trains/ gauges to ensure there’s no need for 3+2 seating.

Come up with a threshold for whether a line will be busy enough to warrant heavy rail. Say a half hourly service with a three coach EMU. If your line won’t justify that then it doesn’t get built. Say at least 250,000 journeys per annum at each station? So each station is big enough to be staffed (and potentially barriered), no need to by on board. DOO for doors (you’d build new stations with straight platforms) but at least one other employee on all trains – more in the case of trains over a certain length (e.g. 200m).

Forget about freight. Or at least forget about mixing it with passenger services. If there’s a business case for dedicated freight lines between ports/ distribution centres/power stations then build it, but I’d be wanting a passenger railway where 100mph+ is standard, and I can’t see any room for slow irregular freight services. And, whilst you can build new passenger lines to attract human beings, if we’ve not had freight trains since the 1960s (?) then presumably the word coped moving its coal/ steel/ cement/ nuclear fuels around by road?

Forget about most suburban train services – give provincial cities budgets for their own light rail networks. You can run Supertram/ Metrolink without operating subsidies, compared to “forty pence per mile” subsidy for heavy rail, so it’s not worth it in a lot of cases.

Parkway stations where lines cross motorways and ring roads.

If you are starting from scratch then there’s obviously no reason why you’d have to follow the routes that we currently have. If we build them to a fast enough alignment (say 125mph minimum ) then one line can link as many intermediate places as two or three existing routes. I’m not saying that everything has to stop everywhere, but if you’re going to start from scratch then you can get a lot more bang for your buck and they’ll still compete with motorway journey times.

So maybe Leeds – Manchester runs through Bradford, Huddersfield AND Oldham. A 125mph train would still do that faster than Leeds – Manchester on the M62.

London –Newcastle could run through Luton, Milton Keynes, Northampton, Leicester, Nottingham, Sheffield, Barnsley, Wakefield, Leeds, Harrogate, Darlington, Durham, Washington and Gateshead (and still be faster than the M1).

Manchester – Chester could run through the Trafford Centre, Warrington, Liverpool Airport, Liverpool and Birkenhead.

London to Peterborough via Stratford, Stansted and Cambridge. That kind of thing. If you build lines that can run fast enough then you don’t need to travel as the crow flies.

That’d mean some areas would have very little railway. If “Cardiff” had a budget for their own light rail/metro network then the only heavy rail in Wales might be along the south coast to Carmarthen and along the north coast to Bangor (possibly Holyhead). I doubt you’d build anything in Scotland north/west of the Glasgow – Aberdeen line. You’d struggle to justify brand new lines in places like Lincolnshire, the Cumbrian coast and other rural areas.

At the same time, some areas would have much more. I could see significantly more lines around the biggest cities – London would end up resembling Chuggington! But that’d only work in places with high population density. Focus resources on where services will be most used. That means that heavy rail won’t be the answer to everything but it means that heavy rail can focus on what it does best, instead of the messy network that we currently have.

That all seems sensible. One thing: congestion on the A9 in this universe means that you'd probably want a new line to Inverness duplicating it. Places like York and Hull should probably also get mainlines.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
My ideas and thoughts if we start over:

I'm not bothered about where the trains go execpt in London and Kent and backontrack has made a map that I like for that section.
Also, try and guess which class/type of train I am biased to from what I have said.

Management:
The railways will be split up into locational areas and an intercity brand.
They will be somewhat privatised however in the different sections there will be a general meeting every 6/12 months with local MPs to discuss how well the section is being run, putting forward suggestions generated from the public and to assess if the franchisee can continue running the section.

Branding:
Franchisees have no control over branding whatsoever.
Branding is different for each section.
Branding must last at least 5 years minimum as so not to confuse the public.
Where a station serves 2 or sections, the branding is to be the neutral national rail branding

Electrification:
Ideally the whole network is to be electrified either by 25kV AC OHLE or 750V DC 3rd Rail.
InterCity routes must have 25kV AC OHLE.
Rural routes must have 750V DC 3rd Rail as to not spoil the area.

Signalling and Infrastructure:
InterCity routes must have in cab signalling to allow 225km/h / 140mph + speeds.
Each station is to have at least one passenger information screen for one platform.
InterCity and as many mainline routes as possible to have slow and fast lines.
InterCity lines must be kept seperate to other lines to to in cab signalling on intercity lines and rolling stock only

Rolling Stock(split into 4 different categories):
InterCity:
To have a selection of 5 car and 9 car AC Hitachi A-train HST with comfy 2+2 seating (2+1 in first) (basically a class 395/801).
Mainline:
To have mainly 4 car and some 3 car AC and DC ADtranz Electrostar with comfy 2+2 seating (2+1 in first) (basically a class 375) and end gangways.
Rural/Branch:
To have a selection of 2 car(no 1st class) and 3 car AC and DC ADtranz Electrostar with comfy 2+2 seating (2+1 in first) and end gangways.
Suburban/Metro:
To have a selection of 4 car and 6 car (no 1st class on all) AC and DC ADtranz Electrostar with slimline 2+2 seating (sounding like, but better than, a class 376)

Tickets:
You must have a seat resevervation to travel on an InterCity service.
Appropiate railcards like existing ones to be used.
Pricing: idk
Style of Tickets:
Non InterCity tickets to be printed on credit card sized stock.
InterCity tickets and ticket that include InterCity portion to be printed on DL sized stock. See attached picture.
Information placement to be researched properly and tested.
Purchacing of ticket:
All ticket machines must be debranded.
Every station must have facilities to buy tickets with card and cash as well as collecting tickets bought online.
Every ticket office, ticket machine and certified online booking sites must sell all available walk-up tickets.
One centralised booking site.

That is what I have thought of so far.
Nice ticket machine. I like your ideas.
Completed the South East Rail Map for the railways proposed by backontrack

Wow, that's pretty much spot on! There are a couple of minute differences but what you've created there I really like :)
 

LOL The Irony

Established Member
Joined
29 Jul 2017
Messages
5,335
Location
Chinatown, New York
generally. I might change some of the routes but the idea is correct However you are going to need lots of tunneling on some of your axis as you cross 2 national parks!
I'd have it sunken or blended in through both. I'd want the passengers to see the view. I'd also have it where towns & cities can sell themselves for a line or spur to increase tourism. My approximation is 1.5 hours to the lakes.
 

squizzler

Established Member
Joined
4 Jan 2017
Messages
1,912
Location
Jersey, Channel Islands
Anybody interested in alternative railway systems needs to buy or borrow a book The World's First Railway System by Mark Casson

It contains a counterfactual (i.e. alternative) railway network that would have served the UK including an index of each line - divided into four categories - trunk, primary, secondary, minor. I'd scan the diagram if I had it to hand.

It is a good starting point for imagining an ideal railway system. There are changes I'd make to his network in light of modern world:
  • Lose some of the rural dead-end branches
  • Take full advantage of modern civil engineering such as Chinese HSR style viaduct construction and tunnelling via immersed tube and tunnel boring machine which will yield a number of benefits over our old manually built railways:
    • Different routes become possible from that in Casson's book. His network omitted risky engineering such as the Severn, Tay and Forth crossings (these were later projects in the railway building age)
    • Straighter, faster alignments
    • Reduce visual impact on landscape
In real life the closest you might get to the scenario of the original poster is that of Israel's railways. From virtually nothing they have developed over a couple of decades a soon to be electrified railway linking the country. The trains are all modern European stock, predominantly double deckers with push-pull loco haulage.
 
Last edited:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,297
If you are only after journey times end to end that are faster than motorways, with a Shinkansen you can have stopping trains that can go nearly twice as far as the road journey and still match them in time.

Although running a service that is entirely stopping would turn it into the world's fastest and longest distance Metro.... it would give you more capacity than you could ever use.
18 400m trains per hour in each direction..... I think ten is probably enough with a mix of stopping patterns, then you can grab the air market too.

Also I like the idea of named trains for marketing purposes but also like clockface timetables.
So perhaps named "diagrams", like they have in Japan?
So the fast train that departs on the hour has a set name, rather than it being an actual individual train.
 

Cambus731

Established Member
Joined
19 Jul 2013
Messages
1,403
Location
Chelmsford
If the UK was in this situation, even if the treasury allocated a huge sum of money say about a 200 billion to a new railway system built form scratch, we couldn't just suddenly make a huge army of engineers , other workers and construction machines magically appear from nowhere. So I expect it would be worked on one or two lines at a time. Probably something a long the lines of the current plans for HS2 would probably be the result. along with something similar to the present HS1. presumably they would be linked, so lets have there be a huge state of the art London terminal at the site of the present Kings Cross. I envisage a four track HS1 running from London to the Chunnel, probbaly along the current line of route of the present HS1 although with a spur from Ebsfleet to Brighton via Chatham, Maidstone, Tunbridge Wells, Uckfield and Brighton.
There would be a link between HS1 and HS2 probably running around London joining the lines together at somewhere like Milton Keynes.
I would completely demolish the town of Stevenage to build a new depot and Marshalling yard and manufacturing site for new trains, (encouraging private train manufacturers to build factories there.) HS2 would follow pretty much its present course although I'd extend the western branch from Manchester to Leeds and York where it could then continue to Edinburgh, and Glasgow with a spur to Perth and Dundee/Aberdeen. If resources are available maybe a small network of lines from Manchester and Preston to Burnley, Nelson and Colne to Leeds. This of course has nothing to do with the fact that my daughter lives in Nelson. And lastly a small network in East Anglia from Kings Cross to Norwich via Stansted Airport and Cambridge with a spur from Stansted Airport to Colchester continuing onto Norwich with some services continuing onto Lowestoft. And a line from Kings Cross to Colchester via Chelmsford with a spur from Shenfield to Southend. And i think a line from Rayleigh to Stansted Airport via Chelmsford. there would of course be full junctions where there lines cross the HS1-HS2 link enabling places like Norwich/Chelmsford/Colchester/ Southend to have through trains to the north and Scotland. I like the idea of having direct trains from Chelmsford/Braintree to Nelson and possibly Perth. Not that I'm allowing self interest to influence my thinking at all. Obviously Stevenage would have to be completely flattened to create a manufacturing and research base for the new railway. While we are at it we should build a new purpose built 100k all seater stadium for West Ham United close by a new Brentwood Parkway station near the M25/A12 interchange. I would also have a new branch of the HS2 from Manchester to Glasgow and Edinburgh. Maybe have an additional spur so enable trains from England to reach Perth without going through either Edinburgh or Glasgow.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
I'd have it sunken or blended in through both. I'd want the passengers to see the view. I'd also have it where towns & cities can sell themselves for a line or spur to increase tourism. My approximation is 1.5 hours to the lakes.
One of your lines crosses the tip of a lake, Haweswater!*

*technically a reservoir
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Last edited:
Status
Not open for further replies.

Top