Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Thanks - presumably it's still used then, as there doesn't seem to be any other means of 'tail lamping' a train coming out of the section?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ANorthernGuard

Established Member
Joined
8 Oct 2010
Messages
2,662
Thanks - presumably it's still used then, as there doesn't seem to be any other means of 'tail lamping' a train coming out of the section?
Yep we still use it, its a pain but we don't have much choice lol


 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
The new track and Platform layout is now available on NR website. Link below.

The design of the Ordsall Curve makes provision for an 8 Car train of 23m carriages. I believe it was said earlier that the new bay platform five is supposed to 140m. The existing but modified bay platform two would seem to be a bit longer. However will all three through platforms 1,3 and 4 be able to take 8 Car trains. I would hope so.

http://www.networkrailmediacentre.c...ACKS-AND-STATION-1a46/SearchCategoryID-5.aspx
 

trickyvegas

Member
Joined
10 Dec 2009
Messages
362
Thanks for the link. The new bay platform seemed well underway at the station, when I passed through on Saturday.
 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
I think there maybe an error on the Diagram for the track and Platform Layout.

A train could depart from any platform (other than 4 which is eastbound only) to get to Victoria. However if the red arrow on the diagram on the line out to Victoria is correct (one way only) then surely no train could access platforms 2 or 3 from Victoria which can't be the intention or if it is then there would be no point to the first new section of track (red line ) on the lines to/from Victoria
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Probably just a misplaced arrow - the sole purpose of the facing crossover you mention seems to be to get trains from Vic over to the lower numbered platforms. I wouldn't be surprised if there's a signalled move from platform 4 back towards the west - it's not unusual for such a facility to be provided on a line that's not otherwise bi-directionally signalled.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
My previous posts explain what will happen at Stalybridge. They have missed a trick with the Ashton branch though as that is a slow speed turnout from the Guide Bridge line, especially if more and more traffic is planned to use it.

From the NR press release:
and the speed of trains passing through the station will increase from 40 to 50 mph

So 50mph only in the Guide Bridge direction, with 15mph remaining towards Victoria?
If so it seems to go against the RUS/Northern Hub objectives.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,657
Probably just a misplaced arrow - the sole purpose of the facing crossover you mention seems to be to get trains from Vic over to the lower numbered platforms. I wouldn't be surprised if there's a signalled move from platform 4 back towards the west - it's not unusual for such a facility to be provided on a line that's not otherwise bi-directionally signalled.

There is a missing arrow, you can get to the low numbered platforms from Victoria, I don't recall 4 being bi-di though, will need to check the plans.
 

Waverley125

Member
Joined
2 Sep 2008
Messages
1,010
Location
Leeds, West Yorkshire
so what exactly will the layout be? (Can't access the document). From my limited expertise it would seem the best option would be to introduce a west-facing bay on the north side of the station, reinstate the centre lines and then widen the southern platform to provide another platform face there. So you'd have one terminating bay for services from Victoria, one through platform for services from Victoria, and then two through platforms for trains from Piccadilly, while TPE services pass by on the centre lines.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Three through platforms, one (two?) bi-di; two west facing bays, one as now and one on the north side. No through roads but remodelled trackwork either side.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,400
Location
A typical commuter-belt part of north-west England
With the mention of the last week in October and the first week in November being allocated for works to be effected, where will the normal through services that terminate at Stalybridge be terminated ? Are there crossovers at Ashton under Lyne which would allow that to be the terminal station for those two weeks ?
 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
There is a missing arrow, you can get to the low numbered platforms from Victoria, I don't recall 4 being bi-di though, will need to check the plans.

Will the three through platforms be capable of holding an 8 car train made up of 23 meter carriages as provided for on the Ordsall Chord?

The new bay platform 5 is or was I believe 140 meters long or at least that was the intention based on previous posting. The revised bay platform 2 would seem to be longer but will either now be capable of holding an 8 car train made up of 23 meter carriages as opposed 6 cars
--- old post above --- --- new post below ---
With the mention of the last week in October and the first week in November being allocated for works to be effected, where will the normal through services that terminate at Stalybridge be terminated ? Are there crossovers at Ashton under Lyne which would allow that to be the terminal station for those two weeks ?

I think the plan is to run buses
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,481
Location
Preston Lancs
Wow - this brings back memories. I used to get Peak Wayfarer tickets about 1984-1987? and the Trans-Pennines then were the old Generator 47s and Peaks (class 44,45,46). I would get an early morning train from Preston (loco hauled if at all possible) to Man Victoria. Then would travel back and forward between Victoria and Stalybridge with 45,46, 47 haulage. Then I would go to the pub on Platform (1??) where they had an excellent selection of real ales. Then the unit Stalybridge to Stockport - then class 86/87 into Picadilly -well you get the drift.
 
Last edited:

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
There is a missing arrow, you can get to the low numbered platforms from Victoria, I don't recall 4 being bi-di though, will need to check the plans.
According to NR's powerpoint jobby, 4's not bi-di - is there a signalled move from there back towards the west though?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,657
Looking at the plan, 4 is not bi-di, but as stated you can turn back from it. Platform 5, the new bay is 140m, P4 is 250m, P3 is 225m, P2 existing bay is 115m and P1 is 225m.
 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
Looking at the plan, 4 is not bi-di, but as stated you can turn back from it. Platform 5, the new bay is 140m, P4 is 250m, P3 is 225m, P2 existing bay is 115m and P1 is 225m.


Many thanks.

However looking at the sketch plan platform 2 looks as though it will be longer than 5. Mind you it will depend on which side is intended to be used, platform 1 side or platform 3 side.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,657
It is where the platform signal is placed that causes the length of P2 to be as it is.
 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
From Manchester Victoria or from Ashton under Lyne ?

Below is an extract from a TfGM Committee meeting.

The precise details as to what will happen when the station is closed for nine days in October/November is not known yet but I suspect it will be replacement buses but from where I don't know

"Stalybridge Remodelling
Work to remodel the layout of Stalybridge will commence from 26 March 2012, with the
closure of the bay platform. Services which normally terminate and start at Stalybridge
will be amended until completion of the remodelling in work in November. Some
services will be re-timed, others will start from Manchester Victoria.
There will also be a series of Sunday closures, from 1 April to 24 June inclusive, and
from 16 September to 9 December inclusive. Northern Rail services between
Stalybridge and Manchester will be replaced by buses. Services operated by
Transpennine Express will be diverted via the Calder Valley route.
The work at Stalybridge will culminate in a blockade from Saturday 27 October until
Sunday 4 November inclusive, where a full service replacement plan will be in place.
Details of this will be provided in a future report to this Committee.
The remodelling at Stalybridge will provide a new through platform, and a new bay
platform for terminating services from Manchester Victoria."
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
First new services to take advantage have been agreed, in addition to the existing Dec timetable changes TfGM has got Dft to relinquish their 40% share of extra revenues from new or strengthened Northern services financed by TfGM until the end of the Northern Franchise in 2014. This will (in addition to making the existing funded Sunday services such as the Atherton line cheaper to subsidise) mean that 8 daily mon-fri Southport-Manchester Victoria and 7 daily Kirkby to Manchester Victoria services will now terminate at Stalybridge.

Northern forecasts this will lead to 86,000 more passengers a year while TfGM estimates it will take 25,700 cars off the road annually. This service alteration is based on work done for the Northern Hub which found a market for at least 300 passengers a day on direct Stalybridge-Salford/Bolton journeys for academic purposes.
 

Prodigy

Member
Joined
30 May 2011
Messages
232
Good to see this work going on. Was wondering why a Southport service wasn't departing from platform 3 the other day and instead Platform 2 so this explains it. No idea why are service from Victoria terminated on Platform 1 and headed towards Huddersfield though.
 
Joined
1 Apr 2012
Messages
426
Location
Leeds
Wow - this brings back memories. I used to get Peak Wayfarer tickets about 1984-1987? and the Trans-Pennines then were the old Generator 47s and Peaks (class 44,45,46). I would get an early morning train from Preson (loco hauled if at all possible) to Man Victoria. Then would travel back and forward between Victoria and Stalybridge with 45,46, 47 haulage. Then I would go to the pub on Platform (1??) where they had an excellent selection of real ales. Then the unit Stalybridge to Stockport - then class 86/87 into Picadilly -well you get the drift.

The Stalybridge Station Buffet is still going strong with an excellent range of real ales (and sandwiches).
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,400
Location
A typical commuter-belt part of north-west England
On page 87 of the July 2012 issue of Modern Railways in the Trackwatch section, there is a quarter-page coloured diagram of the present and the proposed station and track layouts at Stalybridge, showing the both the existing and the new platform layouts and platform numberings.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
As there was in a recent TRUK I think. I'm sure the online version is in one of the links posted earlier in the thread.
 