Does anyone know the lengths of all the Platforms once everything has been completed.
I would hope that the through platforms 1,3 & 4 could accommodate an 8x23m coach train such as a class 380 and the bays 6 x 23m.
I believe it was said earlier in this thread that the new platform 5 would be 140 metres.If so that would seem to be long enough for 6x23m. The modified bay platform 2 would seem to be longer than platform 5 on the latest NR diagram.
1 is 225m, 2 is 115m, 3 is 225m, 4 is 250m and 5 is 140m. That is off the signalling diagram.
The diagram on the NR website would suggest that Platform 2 is as long as if not longer that Platform 5 but clearly not so. That means that Platform 2 can only handle up to 4 car I believe.
According to an email update from Metro, the work is finished and it only cost £20 ...
But what services will be using the modified bay platform 2 ?
--- old post above --- --- new post below ---
Now that is what I call extremely good value for money...hock:
I have no idea what services will use platform 2. It will be accessible from both Piccadilly and Victoria directions.
At the moment only some Liverpool services use the bay and I imagine that will use Platform 5. However in the future and when the Hub and Electrification works have been completed more services are planned to use Stalybridge because of the capacity problems at Victoria. Therefore I would expect more terminating services.
Seems that only the through platforms 1,3 and 4 were in use early this morning. Nothing using the bays, although new bay 5 now appears to be handling Liverpool Lime Street turn backs.

I have no idea what services will use platform 2. It will be accessible from both Piccadilly and Victoria directions.
The only reason that I asked this was as a result of your previous comment about only 4-car services being able to access this bay platform.

That post looks like it is going to be very good at blocking the platform.
Isn't there meant to be a clear dimension from the edge on Platforms?
But what services will be using the modified bay platform 2 ?
According to an email update from Metro, the work is finished and it only cost £20 ...
Route now open!
The first trains have run through Stalybridge his morning, following the completion of Network Rails £20 investment in the station with construction of two new platforms, installation of new trackwork and signalling.
Train services now operate at the times shown in timetable booklets and on station posters dated Sunday 14 May 2012 until Saturday 8 December 2012 for the Caldervale Line timetable (pdf, 523k - opens in a new window) and Huddersfield Line timetable (pdf, 312k - opens in a new window). However due to a train fault the 0648 Marsden to Leeds service has started from Huddersfield this morning.
Will need to check, but only 3 springs to mind.
Is there a PID on Platform 5 because I couldn't see one in the photos.
It's this one, unless you meant (New) Platform 1 in whch case there's a support post but no PID yet.
(New) Platform 1 is not in use, they were still laying some of the edging stones today.
Has the signal box been taken out of commission?
It has I think. Now controlled by Manchester East control centre?