• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Stagecoach West Scotland

Joined
21 Aug 2017
Messages
1,026
Location
Glasgow
Is Stagecoach locked in to running the X19 as a result of anything from the SPT/FastLink days? I thought there was a grant involved from SPT for the X19 to be extended via the FastLink to QEUH but that feels like 10+ years ago?

Just trying to figure out why Stagecoach still want to be seen to be running the X19 at all - albeit via a subcontract - and can only think it is because of some commitment they can't get out of without some penalty.

Or is it just killing time until McGills switch to running via the FastLink roads to avoid SPT having to explain why all that money was spent yet there is no buses using it.
The 23 won't really touch the X19 a lot of people use it from end to end for work and other things
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Metal Mickey

Member
Joined
9 Nov 2021
Messages
370
Location
Scotland
I doubt the X19 will last to be honest. Could First take on what’s left as basically a sped up 19/41? Keeping its X19 number.
Hardly anyone uses the First 19 and 41 as an alternative to the Stagecoach X19.

== Doublepost prevention - post automatically merged: ==

Is Stagecoach locked in to running the X19 as a result of anything from the SPT/FastLink days? I thought there was a grant involved from SPT for the X19 to be extended via the FastLink to QEUH but that feels like 10+ years ago?
If there’s a tendering agreement with a local transport authority and the operator wants to pull the plug early they may encounter financial penalties as a consequence.

But no operator is locked into operating a service under the normal process for more than 90 days following its commencement.

== Doublepost prevention - post automatically merged: ==

The 23 won't really touch the X19 a lot of people use it from end to end for work and other things
I think what Clydeflyer is saying with McGill’s rerouting the 23 via Squinty Bridge & Broomielaw, it may give Stagecoach justification to withdraw the City Centre to QEUH section effectively reverting to Easterhouse to City Centre only like it did 10+ years ago.
 
Last edited:

Glasgowbusguy

On Moderation
Joined
21 Feb 2019
Messages
546
Hardly anyone uses the First 19 and 41 as an alternative to the Stagecoach X19.

== Doublepost prevention - post automatically merged: ==


If there’s a tendering agreement with a local transport authority and the operator wants to pull the plug early they may encounter financial penalties as a consequence.

But no operator is locked into operating a service under the normal process for more than 90 days following its commencement.

== Doublepost prevention - post automatically merged: ==


I think what Clydeflyer is saying with McGill’s rerouting the 23 via Squinty Bridge & Broomielaw, it may give Stagecoach justification to withdraw the City Centre to QEUH section effectively reverting to Easterhouse to City Centre only like it did 10+ years ago.
Yes but as has been explained most of the QEUH passengers on the x19 start there journey in the east end.
 

NorthClyde320

Member
Joined
30 Jun 2019
Messages
299
Location
North of Glasgow
Is Stagecoach locked in to running the X19 as a result of anything from the SPT/FastLink days? I thought there was a grant involved from SPT for the X19 to be extended via the FastLink to QEUH but that feels like 10+ years ago?

Just trying to figure out why Stagecoach still want to be seen to be running the X19 at all - albeit via a subcontract - and can only think it is because of some commitment they can't get out of without some penalty.

Or is it just killing time until McGills switch to running via the FastLink roads to avoid SPT having to explain why all that money was spent yet there is no buses using it.
I'm sure when the Fastlink first opened around the time the QEUH opened there was a stipulation that any route operating on it had to operate at least every 10 mins during the day and every 20 mins eves Mon to Sat (always thought the evening 20 min freq is overkill) Sunday freq stipulation I'm unsure of. At that time the Stagecoach X1 started and a week later the McGill's F1 started so the Fastlink was very well served, the X1 was replaced about 4 or 5 months later by the X19 (sure it served Buchanan Bus Station for a few months before being taken out due to reliability issues) and the McGill's F1 was withdrawn after 6 months. The only minor change being the 10 min frequency reduced to 12 mins but still the evening frequency remains every 20 mins I'm sure because of the frequency stipulation for the Fastlink and the hospital.
 

Clydeflyer

Member
Joined
4 Aug 2019
Messages
51
Thanks NorthClyde320 and Metal Mickey. That's exactly what I was wondering... some stipulation from NHS/SPT had Stagecoach obligated to run the X19, hence the arrangement with WCM to avoid failing to do so. If McGills fulfil that obligation with the 23 then Stagecoach will be free to just pull the plug on the X19 and then maybe WCM start their own X19 just Glasgow - Easterhouse, or it just ceases. There certainly doesn't seem to be anything permanent about this arrangement with WCM from the outside. And it doesn;t seem the Stagecoach way... if they wanted to ditch the route they would ditch it without a thought, but somehow they've had to hang on here.
 

CMBS

Member
Joined
24 Jan 2026
Messages
77
Location
Scotland
Noticed a suspicious number of deckers operating both the X76 and X77 at the moment, being multiple on one route at the one time. Are some of the coaches unavailable at the moment? Or is it Stagecoach being Stagecoach.
 
Joined
3 Aug 2021
Messages
827
Location
Glasgow
Noticed a suspicious number of deckers operating both the X76 and X77 at the moment, being multiple on one route at the one time. Are some of the coaches unavailable at the moment? Or is it Stagecoach being Stagecoach.

On Wednesday there were two EV400s on the X76 whilst an e400MMC 10931 was on the X77.
 
Joined
21 Aug 2017
Messages
1,026
Location
Glasgow
Noticed a suspicious number of deckers operating both the X76 and X77 at the moment, being multiple on one route at the one time. Are some of the coaches unavailable at the moment? Or is it Stagecoach being Stagecoach.
Services probably running late as well due not being able to go any faster than 50mph, Always end up behind with a decker, that extra 12mph always helps with timekeeping
 
Joined
21 Aug 2017
Messages
1,026
Location
Glasgow
Stagecoach finally going with Ticketer TK300 machines UK wide I'm hearing with a 12 month national roll out starting in September, it’s somewhat normal for the X19 punters due to them having West Coast Motors ticketers fitted
 

Scotrail88

Member
Joined
21 Jul 2014
Messages
453
Is there any news on when Ardrossan will get the next batch of EVs to become fully EV as part of ScotZeb3
 

ClydeCoaster

Member
Joined
31 Jul 2019
Messages
203
I noticed some transfers going on, a couple of Panther LEs and an Oxford Tube Panorama in Kilmarnock bus station for a start. I'm told they're "extras for the £2 fare cap". As in dupes? There's no timetable changes?
 
Joined
21 Aug 2017
Messages
1,026
Location
Glasgow
I noticed some transfers going on, a couple of Panther LEs and an Oxford Tube Panorama in Kilmarnock bus station for a start. I'm told they're "extras for the £2 fare cap". As in dupes? There's no timetable changes?
Not really seen buses being any busier than usual, Day and weekly tickets still offer better value if you use them more than a few times a week
 

ClydeCoaster

Member
Joined
31 Jul 2019
Messages
203
Not really seen buses being any busier than usual, Day and weekly tickets still offer better value if you use them more than a few times a week
Yeah, I did think it was an odd reason (if indeed it was true). I know the trains are off between Kilmarnock and Glasgow just now but I've not seen any dupes running on the X76 or noticing any real change. Thus far, anyway.

2 Panther LEs at Kilmarnock and 2 at Ayr don't make much sense to me.
 

Fifescottish

Member
Joined
14 Oct 2015
Messages
294
Are they transferred permanently to West Scotland or heading back to East Scotland as I believe they were headed to Dunfermline?
 

Scotrail88

Member
Joined
21 Jul 2014
Messages
453
if buses were full and leaving people, I’m sure the same people will be saying they should have seen this.

At least they have made provisions and with trains off then it isn’t a bad idea.

Sounds like not needed but small provision in grand scheme
 
Joined
3 Aug 2021
Messages
827
Location
Glasgow
Yeah, I did think it was an odd reason (if indeed it was true). I know the trains are off between Kilmarnock and Glasgow just now but I've not seen any dupes running on the X76 or noticing any real change. Thus far, anyway.

2 Panther LEs at Kilmarnock and 2 at Ayr don't make much sense to me.

It's better to have transferred the extra coaches to Kilmarnock and Ayr IN CASE they are required, rather than leave people behind and be told they should have planned. Usually by the same people who complain it doesn't make sense.
 

Spsf3232

Member
Joined
21 Apr 2016
Messages
415
Location
Glasgow
It's only Thursday. We haven't reached the weekend when passenger numbers will spike with day trippers.

We currently are in the lull period where everyone is still working
 

ClydeCoaster

Member
Joined
31 Jul 2019
Messages
203
It's better to have transferred the extra coaches to Kilmarnock and Ayr IN CASE they are required, rather than leave people behind and be told they should have planned. Usually by the same people who complain it doesn't make sense.
Thanks for the patronisation and the inference. Perhaps I should have clarified the bit that didn't make sense is the type of coach transferred and how 2 to each depot rather than concentrate all four. But you do you.
 

Top