• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

SSR resignalling

JustPassingBy

Member
Joined
17 Oct 2018
Messages
73
Thanks for the reply. Wouldn't want anyone to break rules/put their jobs at risk. Was just asking as I thought there might be some dates that are public knowledge that I just didn't know.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,933
Location
here to eternity
The first section of the long awaited SSR resignalling, Thales CBTC Signal Migration Area 0.5 from Hammersmith-Latimer Road goes live with the first trains tomorrow morning.
Hammersmith signal cabin (OZ) will close after the last train tonight. >insert tears from bluegoblin7<

A normal weekend timetable will operate but trains will initially run empty from Paddington-Hammersmith until passenger approval is gained, hopefully sometime on Sunday.

The contract was signed on 3 August 2015:
http://www.railwaygazette.com/news/...-sub-surface-lines-resignalling-contract.html

Maximum line speed will be increased to 50mph in this section, from the previous 35-40mph. Restrictions obviously remain on certain infrastructure and pointwork.

Thread reopened to allow @Dstock7080 to update.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,509
Location
West London
This weekend a software update for the forthcoming SMA 8 Finchley Road-Preston Road commissioning has addressed the tag-reading issue restricting maximum speed in CBTC to 56mph.
From today District/H&C trains operating to the planned 62mph in the appropriate sections.
 

A60stock

Member
Joined
26 Aug 2019
Messages
229
Location
London
Apologies if I have missed this but what is the go live date for SMA8? I recall seeing July 2025?
 

Kay_M

Member
Joined
18 Apr 2019
Messages
251
Hopefully 31 May/1 June weekend
Hoping so. Thank you for the update.

== Doublepost prevention - post automatically merged: ==

This weekend a software update for the forthcoming SMA 8 Finchley Road-Preston Road commissioning has addressed the tag-reading issue restricting maximum speed in CBTC to 56mph.
From today District/H&C trains operating to the planned 62mph in the appropriate sections.
Quick question. (If this has been asked before then apologies) with regards to the fast lines (tracks) on the met line from Wembley Park to Harrow. Will that part remain conventional signalling until the next update.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,168
Location
0035
Hoping so. Thank you for the update.

== Doublepost prevention - post automatically merged: ==


Quick question. (If this has been asked before then apologies) with regards to the fast lines (tracks) on the met line from Wembley Park to Harrow. Will that part remain conventional signalling until the next update.
No, the signalling applies to all roads. Meaning that even Fast / Semi-fast trains will have to stop and change over
 

A60stock

Member
Joined
26 Aug 2019
Messages
229
Location
London
Sorry, are Northbound fast trains also stopping outside Preston Road? Or do these switch over at Wembley?
 

A60stock

Member
Joined
26 Aug 2019
Messages
229
Location
London
SM9 is also expected in 2025 right? So we won't have this situation for too long?

Also what happens if a driver forgets and runs past the boundary at normal line speed?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
Out of interest, why do they have to stop to switch systems? Thameslink trains dont when switching to ATo over ETCS, and I’m fairly sure Elizabeth line trains don’t on approachto the Crossrail core (although I’m happy to be stood corrected on that).
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,778
Location
Somewhere, not in London
Not to be too critical with it, but it might have something to do with it being the 3rd company that has been selected to deliver the system, and not exactly being 'optimised' for the purpose?
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,305
Location
Hertfordshire / Teesdale
Out of interest, why do they have to stop to switch systems? Thameslink trains dont when switching to ATo over ETCS, and I’m fairly sure Elizabeth line trains don’t on approachto the Crossrail core (although I’m happy to be stood corrected on that).

I suspect the answer is that this is how the off-the-shelf product works, and to attempt to change this would have been extremely expensive (as well as introducing risk), likely not worth it when virtually all the boundaries are at a station in any case.

Seltrac seems to work on the basis of providing a movement authority from A to B, so going in you have to have a start point, and coming out you have to have an end point. It’s also the case that when entering the system a series of checks have to be made, and I’m not sure to what extent the system would allow for these being done on the move.

There’s also the issue that the the train has to be changed in and out of tripcock mode. I believe the tripcock remains operative (it certainly did on the Jubilee), but there’s a risk of having a train able to proceed at full speed with no protection if the changeover into ATC doesn’t occur correctly. I suspect this would be regarded as being risky.

There was an issue recently on the District Line where it was found that trains could enter a platform under ATC at the exit point into conventional signalling, with the preceding train potentially stopped within the overlap of the first colour-light signal.

The other issue that springs to mind is that, on the Jubilee and Northern, drivers had to operate a switch, which meant standing up and theoretically turning away from the driving position. Also if operating under ATO then you’d have to cross the cab to change the train to manual operation, or vice versa. This couldn’t be done on the go without leaving the driving position. Also the traction/brake controllers aren’t designed for this, as to go from motoring to stow, which would involve passing through the emergency brake positions. I daresay design changes could be made, but presumably massive cost all for a couple of locations.

So, in essence, cost/complexity/risk versus benefit doesn’t stack up. And Thales don’t exactly have a great record of coming up with solutions to very LU-specific problems - “send us your problem over to Canada and we’ll see if we can find a workaround, meanwhile if you could please give your attention to the invoice we’ve just sent you it would be much appreciated”…
 
Last edited:

pbin

Member
Joined
25 Jul 2022
Messages
35
Location
London
I’ve seen that trains are running between Putney Bridge and Parsons Green. I assume that these are using CBTC as the line is closed for SMA12 testing, is that right?
 

starlight73

Member
Joined
1 May 2024
Messages
167
Location
London
Similarly… the CBTC boundary signal/sign is now in use at Stamford Brook and I saw a district train running out of service, so perhaps the same on this section?
 

starlight73

Member
Joined
1 May 2024
Messages
167
Location
London
There was also an engineers battery loco with track waiting outside Hammersmith (district westbound) - perhaps this was one of the test trains too?
 

apbj

Member
Joined
18 May 2023
Messages
69
Location
London
I see the Preston Park stop has actually been included in the TfL weekly email to customers

To help us embed the new signalling system, between Monday 2 and Thursday 5 June only, there will be changes to the Metropolitan line timetable, including fewer peak hour services operating across the line and changes to usual train times throughout the day.

Also from Monday 2 June, fast and semi-fast services on the Metropolitan line will need to pause for several seconds in the Preston Road area while drivers switch between signalling systems. This will not impact on journey times. The switching between signalling systems will continue until the next phase of the upgrade is implemented in about a year's time.

From Friday 6 June the summer timetable, which came into effect on Monday 14 April, will resume.
 

ChristopherJ

Repeatedly returning banned member
Joined
8 Aug 2005
Messages
494
Location
London, UK
I really don't understand LUL's fascination with having the mode selector (a very important dial) on the other side of the cab, meaning the driver has to physically leave the driving seat to change from Manual to ATO modes.

The Central 1992 stock and Victoria 2009 stock are no better.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,509
Location
West London
It gives a few seconds thinking time to make a deliberate action.
Hence why tripcock reset, control governor cut-our etc were always on the offside of cab.
MCBs (miniature circuit breakers) are usually out of reach too, although S Stock do have some useful ones immediately behind the driver but in a locked compartment.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,778
Location
Somewhere, not in London
I really don't understand LUL's fascination with having the mode selector (a very important dial) on the other side of the cab, meaning the driver has to physically leave the driving seat to change from Manual to ATO modes.

The Central 1992 stock and Victoria 2009 stock are no better.

Because they’re very deliberately not within the reach of the normal driving position.
The system design that dictates this all the way back to the issues with 1967TS pre-dates the idea of half doing an ATP/ATO system with changeover points at inter-station stops…
 

Top