Any future Chiltern main line stock will almost certainly have an ETCS solution for Met line operation; ETCS and CBTC are not dissimilar when it comes to underlying signalling principles - it is the track to train communications path and the bespoke software applications that are different. A very simple view is all that is needed is for new Chiltern stock be ETCS fitted but with additional CBTC antennae and the conversion done by train borne processors, or, for Met line trackside CBTC kit to transmit ETCS messages, or for the central 4LM CBTC processors to communicate with the central NR ETCS processors. This type of integration of dual ETCS / CBTC equipped trains is already in place on 345s that have (Siemens) CBTC for the Eliz line core and ETCS for Heathrow Airport - it is not unknown territory. Hitachi/Thales CBTC is simply another variation, not a blocking point. IIMU a longer term aspiration, at least a concept not plan, for LU Ealing / Richmond / Wimbledon is some form of integration with ETCS when NR do eventually get around to it.With some of Chiltern’s DMUs reaching end-of-life in the foreseeable future, will whatever new replacement rolling stock that Chiltern gets in the future have to have multiple signalling systems, including CBTC, or will they just remain tripcock-based?
Last edited: