we can't electrify the entire network all in one go - so in the meantime there have to be ways to keep services going where they straddle electrified and non-electrified routes.
Indeed, but building new trains specifically designed for the task of keeping partially-electrified
INTERCITY services going will lead to either:
- Delay of eventual full-electrification of the routes in question or
- Expensive-to-run Intercity units to cascade and nowhere such a train is really suitable (same problem that's exists with Voyagers)
Much better, in my opinion, to use old, existing, diesel-powered trains* that are suitable for the task but closer to retirement. That way, there is more incentive to get the wires up as quickly as possible and when they do go up the full benifits can be realised, rather than keeping most of the disadvatages of diesel for 30+ years by ordering new bi-modes.
* Possible options include:
- Intercity 125 continuation
- Push-pull LHCS with a loco-swap at limit of wires (if TDM's a problem, why can't it be fixed?) (electric locos could be new, existing diesel take over at end of wires, diesel locos can then be retired if wires go up)
- IEP pure-electrics with diesel-loco haulage beyond wires (old diesel locos, which can then be retired if wires go up)
- Class 222 bi-modes if NYM is right about there being a case for them despite there not being one for 220s/221s
As I see it, the bi-mode option looks better for the Cotswolds line, IC125s for Plymouth/Penzance/Taunton/Exeter and loco-hauled EMUs for the others.
What on earth makes you think there is any difference between a 222 and 220 when it comes to trying to use overhead electric power? The kit under the floor is the same and that's where the issues and costs which killed the 220 notion lie.
As I said in my previous post, NYM suggested that things might be different with 222s. I had assumed e-Meridian was as dead as e-Voyager, but NYM's post got me all excited that it might not be dead after all.
Bluster all you like, a donkey engine is the shunting/get out of an area where electric power has been lost engine for the straight-electric sets, not the main power plant engines for use when bi-modes are running on diesel.
I KNOW THAT, what I want from IEP is pure-electric units. 'Pure-electric' meaning no diesel engines at all, not even the 'donkey engine' for shunting/OHLE-failures.
Slight correction on numbers a 5 coach IEP is currently shown as having 270 standard seats and 45 first class seats. As others have suggested this may be reconfiggered; for example it could be that the doubled up 5 coach trains (pure electric) run to Wales, with 9 coach bimodal trains running on the Cotswolds line.
Yes, it may be reconfigured, but until it is done I can do no better than assume the published numbers and base my criticisms on them. The most recent published plans I've seen are for no 'pure-electrics' and a mix of 5-car bi-mode and 9-car psudeo-electric sets.
If bi-mode 222s are as dead as bi-mode 221s/220s then I think the IEP fleet should be reconfigured to consist solely of 9-car 'pure-electrics' (instead of the 9-car psudeo-electrics in the published plans) and a minimal number of bi-modes of at least 7-car length. Prefrably, there would be some alternative to bi-mode on the Cotswolds line and all IEPs could be 9-car pure-electrics.
One of the problems with your suggestion of doing away with potion workings is that oftern there are not enough paths to allow two seperate trains to run over part of the route (oftern into London)
Are we talking Waterloo - Exeter or GWML? If the former, I don't suggest doing away with portion working, just that any new units should have gangways like the present 158s/159s. Portion working is great in my opinion, just not if you can't walk between units while the train is moving.
Hindsight is a wonderful thing, again at the time they were seen as a good thing.
Why would a surburban DMU with poor-acceleration (which a class 170 is, according to what I've picked up on this fourm) be considered a good thing? Surely acceleration matters more if you are making more stops, meaning if anything the 170s should have EMU-acceration and 220s should accelerate more slowly.
Given that this thread is talking about train services to Cornwall, where the trains are pretty much full from London to Exeter and often to Plymouth, then having extra catering staff is an advantage. It also means that people would be more inclided to use the catering services if all of them can walk to a bufet in up to 3 coaches (7 coach 222) or up to 2 coaches (5 coach 222) rather than up to 5 coaches as at present.
I don't get that argument. Of course a shorter train will mean passengers having less distance to walk to a buffet. However, given that you just said the trains are full, a shorter train is the last thing you want. Shorter units are less likely to provide the more-substantial standard of catering (from a kitchen/buffet) that longer-distance passengers are more likely to require. Do 5-car 22xs have kitchens/buffet or is it only a trolley service, the 5-car IEP floor plan seemed to be trolley-only.
Also most people will book a seat for IC train services if they are traveling any sort of distance and so there is less likely to be empty half of a train while the other half is jam packed. This could be further aided by booking as many seats in the country half of the train as possible (assuming running out of London), so that the commutors fill up the "emptier" half when they all jump on at the last minute.
That might limit the damage a little I suppose. My grandmother and I have a theroy that many passengers with reservations often don't bother finding their resevered seat if they can get a seat otherwise. I still would hope both units ran the full-length of the service though, in case passengers cut it fine and jump on at the nearest door which happened to be the wrong unit.
Given the time required to split a train it is more than possible for the train staff to identify those passengers in the wrong portion and aid them into the right portion for their journey. Espicially as this happens up and down the network on a daily basis already.
If you provide enough time between the train arriving and the first portion departing to make it a connection that would work. In theroy however with 158s, 377s etc. the guard(s) can make sure everyone is in the correct portion before the split-station and the detached units can depart in less time than would be required for a safe connection.