Speculation: Class 222 to GW in the long term?

Status
Not open for further replies.

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
As they are IC trains, and as a lot of people reserve seats on such a service, with buffets then there are fairly easy ways to get around the problem of not being able to get from one part to the other. For instance it could be argued that having two guards for a 10/11 coach train is preferable anyway

I'd agree with the doubling up of staff on longer trains - even if there's a link from each coach - how can one person check all tickets on an HST (for example)? One member of staff can struggle on some Sprinters, so seems optimistic to ask one to deal with a two hundred metre (plus) train - regardless of corridor connection
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
  • The Lymington branch (a fairly trivial irritation that is probably the "least bad" option)

...not a *huge* issue in the long term.

I seem to recall in the 458 thread that the part of the reshuffle when the conversion work is complete will see an extra 158 on WoE work, so have to wonder if the longer term plan is to stick a 450 back on the branch when there is a bit more slack in the fleet
 

Goatboy

Established Member
Joined
23 Jun 2011
Messages
2,274
Except that a 4-car train would definitely be overkill on the branch.

So is a Regional Express DMU - the 450 isn't the best option for the branch, its the least terrible option.
 

Goatboy

Established Member
Joined
23 Jun 2011
Messages
2,274
It's a shame they had to get rid of the 3CIG. It worked well in that there was nowhere else for it to go, it gave the line a little more tourist appeal and solved the 'What on earth do we use on that' issue at the same time.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
It's a shame they had to get rid of the 3CIG. It worked well in that there was nowhere else for it to go, it gave the line a little more tourist appeal and solved the 'What on earth do we use on that' issue at the same time.

But they were both knackered by the time they were withdrawn and needed a large amount of money spending on them which could not be justified in the long term.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,582
Location
Torbay
However ideally the best thing to do there is just to electrify all of the remaining of the SWT's routes . . . it could be a difficult/time consuming job to wire up between Yeovil and Exeter so it may take until at least CP7 to see the full route electrified.

I don't see why Basingstoke - Exeter electrification should be particularly difficult. West of Salisbury, with only one track in place over much of the route, clearance for OHLE through former double track structures should be easier to achieve than on the remaining double track sections. I guess more importantly the scheme would also be dependant on conversion of the Southampton route west of Basingstoke from 3rd rail to OHLE; then perhaps a unified fleet of long distance dual voltage units could be used on both lines.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,343
You wouldn't need to convert the line between Basingstoke and the relevent flying junction really... you just have the trains convert immediately after the junction (which I can't remember the name of at the moment) either by stopping or just doing it on the move.

There is even a station in a reasonable position to do this. But this is made irrelevant by the Electric Spine proposals to rip up all the SWML third rail.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
You wouldn't need to convert the line between Basingstoke and the relevent flying junction really... you just have the trains convert immediately after the junction (which I can't remember the name of at the moment) either by stopping or just doing it on the move.

There is even a station in a reasonable position to do this. But this is made irrelevant by the Electric Spine proposals to rip up all the SWML third rail.

Worting Junction. And I'm not sure which station you mean, Basingstoke is 2½ miles before the junction and the next station, Overton, is not until 5¼ miles after it.

Also bear in mind that it's the fasts that go on to Salisbury at this junction, and the slows that go to Southampton, and it's all at 90 mph. So wouldn't be the best place to stop to pan up.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,692
Location
Nottingham
Some fleets can switch between OLE and third rail on the move, and I guess the 444/450 conversions and any new units would be specified to do this if possible. Assuming the "Electric Spine" conversion goes ahead it will almost certainly be in several stages and being able to switch system without stopping will help to reduce the disruption caused.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Pity they can't sell the Lymington branch to the Southern Electric Group to give them somewhere to run their 4-COR[/flippancy]

It seems as though the potential glut of 125mph DMUs might be an excuse to start doing up the country's main cross-country routes, to get the 'HST' differential up to the same as the 'SP' differential. That would mean that XC could hang onto their Voyagers and use them to replace 170s, while the 222s could end up replacing EMT's 158s. TPX electrification might then allow the 185s to cascade to Scotland or Waterloo-Exeter. Thing is, that means spending money on secondary main lines (i.e. the 'low priority' ones that got out-competed under B.R.).
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,343
Worting Junction. And I'm not sure which station you mean, Basingstoke is 2½ miles before the junction and the next station, Overton, is not until 5¼ miles after it.

5.25 miles of third rail on a twin track would not break the bank....
Or you could potentially just open a new station at Oakley right next to the junction, but that would likely be more expensive.

Also bear in mind that it's the fasts that go on to Salisbury at this junction, and the slows that go to Southampton, and it's all at 90 mph. So wouldn't be the best place to stop to pan up.

As I recall the Eurostars used to put the pan up/down moving relatively fast prior to the opening of the second phase of HS1?

You can probably put the pan up at 90mph.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
5.25 miles of third rail on a twin track would not break the bank....

And 2.5 miles of dual electrification (back to Basingstoke on the fasts only) would break it even less, I think... also all Salisbury line trains stop there so it's the natural place for a power change.

I have no idea why I'm discussing this so much because as you said the SWML OHL will render this whole point moot... :roll::lol:
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,343
You probably wouldn't need to dual electrify it, just move the crossovers back to Basingstoke and then just put in double track cantilevers or headspans to electrify the "fast"/Salisbury lines at purely 25kV.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,582
Location
Torbay
And 2.5 miles of dual electrification (back to Basingstoke on the fasts only) would break it even less, I think... also all Salisbury line trains stop there so it's the natural place for a power change.

Basingstoke is the natural changeover point for Waterloo - Bournemouth route trains too. Currently there's only one non-stop passenger service an hour in each direction normally. Stopping that would be no big deal IMHO and would enable the dual section through the platforms to be as short as possible.

You probably wouldn't need to dual electrify it, just move the crossovers back to Basingstoke and then just put in double track cantilevers or headspans to electrify the "fast"/Salisbury lines at purely 25kV.

That would work but as Eagle said probably a moot point :)
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
It seems as though the potential glut of 125mph DMUs might be an excuse to start doing up the country's main cross-country routes, to get the 'HST' differential up to the same as the 'SP' differential. That would mean that XC could hang onto their Voyagers and use them to replace 170s, while the 222s could end up replacing EMT's 158s. TPX electrification might then allow the 185s to cascade to Scotland or Waterloo-Exeter. Thing is, that means spending money on secondary main lines (i.e. the 'low priority' ones that got out-competed under B.R.).

I recon this is a key issue coming up for CP6. Upgrading key regional secondary routes in terms of capacity and speed is what the network needs, but will there be the political will to do it?
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
Basingstoke is the natural changeover point for Waterloo - Bournemouth route trains too. Currently there's only one non-stop passenger service an hour in each direction normally. Stopping that would be no big deal IMHO and would enable the dual section through the platforms to be as short as possible.

As the total journey time could be dropping due to better acceleration from not having to rely on the thrid rail for power an extra stop is unlikely to make any/mich differance (other than adding up to 5 minutes more than would be needed if the change over happened at Woking).
--- old post above --- --- new post below ---
It seems as though the potential glut of 125mph DMUs might be an excuse to start doing up the country's main cross-country routes, to get the 'HST' differential up to the same as the 'SP' differential. That would mean that XC could hang onto their Voyagers and use them to replace 170s, while the 222s could end up replacing EMT's 158s. TPX electrification might then allow the 185s to cascade to Scotland or Waterloo-Exeter. Thing is, that means spending money on secondary main lines (i.e. the 'low priority' ones that got out-competed under B.R.).

Waterloo-Exeter need more capacity not less, which is what the 185's would bring in their current configeration (which is why the 22x's would be of no use on that route as well). It is also why it would make a good case for electrification.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,692
Location
Nottingham
Any unit for Waterloo-Exeter really needs end gangways, so revenue staff can get through the train and passengers can move into the right portion when they are split at Salisbury. Something like a dual-voltage 444 would be ideal.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
Waterloo-Exeter need more capacity not less, which is what the 185's would bring in their current configeration (which is why the 22x's would be of no use on that route as well). It is also why it would make a good case for electrification.

I think it should keep its 158/159s until it is electrified (hopefully early in CP6) - no other DMU provides a better set-up for a route that needs high capacity operation at the eastern end plus splittable units for the quieter western end.

185s, 222s etc wouldn't be an improvement on that line - only EMUs would.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,343
Although I am not a big fan of Siemens units anyway, Class 444-esque units would be best for many regional express duties (if we were to go all out for electrification anyway).
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
I think it should keep its 158/159s until it is electrified (hopefully early in CP6) - no other DMU provides a better set-up for a route that needs high capacity operation at the eastern end plus splittable units for the quieter western end.

185s, 222s etc wouldn't be an improvement on that line - only EMUs would.

That sounds sensible. I often tend to forget the capacity issue, which means that the only way to maintain capacity is to run regular 9-car formations if 185s were ever brought in - which is probably why SWT swapped their 170s for 158s (which became 159/1s).
--- old post above --- --- new post below ---
Although I am not a big fan of Siemens units anyway, Class 444-esque units would be best for many regional express duties (if we were to go all out for electrification anyway).

I'm not a big fan either. With improved seats (even just thicker padding) and some means to move the air about inside, then they might work.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
I don't see why Basingstoke - Exeter electrification should be particularly difficult. West of Salisbury, with only one track in place over much of the route, clearance for OHLE through former double track structures should be easier to achieve than on the remaining double track sections. I guess more importantly the scheme would also be dependant on conversion of the Southampton route west of Basingstoke from 3rd rail to OHLE; then perhaps a unified fleet of long distance dual voltage units could be used on both lines.

Although I see you point, it is likely that with electrification that more of the track will be redoubled (as it is cheaper to do two things at once than it is to do them at different times), in doing so there is the risk that more of the structures will need to be modified than would be needed if only one or other scheme was going ahead.
--- old post above --- --- new post below ---
I think it should keep its 158/159s until it is electrified (hopefully early in CP6) - no other DMU provides a better set-up for a route that needs high capacity operation at the eastern end plus splittable units for the quieter western end.

185s, 222s etc wouldn't be an improvement on that line - only EMUs would.

Early CP6 is when we could do with a whole load of DMU's to replace the pacers (see other thread).
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
Early CP6 is when we could do with a whole load of DMU's to replace the pacers (see other thread).

I'm trying to be positive and accept that the CP5 electrification (with the focus on "main lines" - the GWML/ MML/ "TransPennine Main Line") means there are a lot of "quick win" electrifications for early in CP6 that would free up decent numbers of DMUs.

Apart from the Valley Lines there's not a huge amount of direct replacement of 75mph DMUs in CP5, but (the "root" electrification) sets things up for "branch" electrification after 2019.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
They have poor fuel economy because they are 125mph units capable of accelerating as fast as an EMU (or a 75mph DMU) - the best of both worlds.
Yes. A big mistake if you ask me, one that IEP looks set to make which is one reason why I'm set against it. If you want the acceleration of an EMU then, unless you're service is very infrequent, the line should be electrified so you can have an EMU, the fuel ecconomy of Voyagers probably makes them alot more expensive to run, meaning the investment in OHLE would probably pay for itself quicker than replacing IC125s. The cost of running 22xs means they aren't really suitable for anything other than the Intercity routes they are presently used on, but they don't provide sufficent comfort or capacity to be suitable were they are.

Well I never, a thread mentioning 22xs and Great Western and here you are yet again trying to foist the blasted things on the Cotswold Line, despite having been told umpteen times before that they will never ever in a million years have adequate seating capacity, even in nine-car formations, to replace the 500-seat and 580-seat HSTs currently used, never mind allow for any future growth in passenger traffic. And that the idea of adding electric traction to 22xs is pretty obviously dead and buried.
Sorry, I forgot the seating capacity issue in my eagerness to rid ourselves of the impending doom IEP will bring about if it isn't rationalised. As for E-Voyager being dead, I know, but note the passage from NYM that I was quoting when I said that: "there is also the small matter that electrodieseling the 222 fleet is significantly more viable if combined with a transfer to GW than it is for the 220 / 221 fleet with XC. If anyone cares then I'll post up more details." Just because bi-mode 221s and 220s have been declared unviable it doesn't mean bi-mode 222s have been also.

I do however have to ask you, would you rather have 8/9-car bi-mode class 222 units on the Cotswolds line or the have the 5-car IEP DfT is planning to foist on the Cotswolds line. A 5-car IEP, by the way, will have around 250 standard class seats and 60 First class I believe. A 8-car 222 might not have as many seats as an IC125, but it'd have more seats than the IEP bi-modes you'd get otherwise.

The donkey engine is the small engine going in the IEP electric sets for shunting/get out of trouble if power is lost situations
I know that. Again, check the context of my words. To rephrase what I was saying: if you put bi-mode 222s on the Cotswolds line, the IEP order needn't include ANY bi-modes and instead can be all pure-electric IEPs (and I clarified that, by 'pure'-electric, I meant no 'donkey engine').

And you can't constantly change locos on Class 91+Mk4 formations. The time division multiplex gear hates being being plugged in and unplugged frequently, which is why these trains run as semi-permanently-coupled formations, same as 90s+Mk3s on Norwich services and with 86/87/90s on West Coast expresses before Pendolinos. And aren't Mk4s another element of your plans to save the GW from IEP? They can't be in two places at once.
If the TDM is that problematic it needs work. However, is it really that bad? While the mrk4 rakes are semi-permanently-coupled, the 91 is not fixed to the set. Sometimes, I think, the 91 is swapped at Kings Cross between workings. How many different DVTs has the class 91 in 'Flying Scotsman' livery run with since the 'Flying Scotsman' livery was applied?

Any unit for Waterloo-Exeter really needs end gangways, so revenue staff can get through the train and passengers can move into the right portion when they are split at Salisbury. Something like a dual-voltage 444 would be ideal.
Agreed, or (better yet?) a dual-voltage 5-WES (aka class 442), perhaps in 3-car or 4-car formations rather than the 5-car sets of 442/444. Similarly I think TransPennineExpress should have OHLE-powered 444/442-type units, and the north-Wales coast if it is electrified. Portion-working should not be done with units that don't have end-gangways in my opinion, anything that lacks end-gangways should be long enough that you don't need to run it in multiple (another reason why I don't like Voyagers and short IEPs).

I think it should keep its 158/159s until it is electrified (hopefully early in CP6) - no other DMU provides a better set-up for a route that needs high capacity operation at the eastern end plus splittable units for the quieter western end.

185s, 222s etc wouldn't be an improvement on that line - only EMUs would.
Agreed. The last applies to a lot of other lines though, including TPE where the 185s currently are. Somebody should have built a load more 158s/159s instead of 170s and 185s.

Early CP6 is when we could do with a whole load of DMU's to replace the pacers (see other thread).
Isn't CP6 a bit late to replace Pacers? Unless they are given a dispensation to work for a year or two extra, they will have to have the access-for-all mods by the end of 2019. If anyone has invested in said mods for the Pacers they will be here to stay for some time.

I'd agree with the doubling up of staff on longer trains - even if there's a link from each coach - how can one person check all tickets on an HST (for example)? One member of staff can struggle on some Sprinters, so seems optimistic to ask one to deal with a two hundred metre (plus) train - regardless of corridor connection
I agree, multiple revenue protection staff for longer trains regardless of corridor connections would be useful. However, doubling-up catering staff is unecessary if there are through corridor-connections and the ability to move passengers between units on-the-move (if they are in the wrong portion on a portion-worked service or one unit is full and standard while there are plenty of seats in the other) is, in my opinion, crucial.
 