• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Southern Class 313 withdrawal/storage/scrapping updates

Status
Not open for further replies.

physics34

Established Member
Joined
1 Dec 2013
Messages
4,093
Most Coastway services - especially Brighton to Southampton - are also rammed with 4 car units, sometimes to the point where no more passengers can board. The whole of Southern seem to be having a rolling stock shortage, so the 377/5s are desperately needed, and hopefully some 387s or 379s at some point. The issue is, you could say the same about Southeastern, who still need their 377/5s.
Those damn 701s at swr are holding everything up... its not even funny anymore its utterly embarrassing. I still reckon the 387/379 cascade will happen, the leasing company will have to bite the bullet.... unless they go to scotland to replace 318/320.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43096

On Moderation
Joined
23 Nov 2015
Messages
18,854
Most Coastway services - especially Brighton to Southampton - are also rammed with 4 car units, sometimes to the point where no more passengers can board. The whole of Southern seem to be having a rolling stock shortage, so the 377/5s are desperately needed, and hopefully some 387s or 379s at some point. The issue is, you could say the same about Southeastern, who still need their 377/5s.
The thing is that revenue on the railway is around 80-85% of what it was pre-pandemic, with the London commuter operators particularly badly affected by the revenue drop. Cutting Southern's fleet by 15% (as has been done) is therefore an entirely logical and proportionate response. It should be noted that SWR's fleet has been similarly cut by around 17%.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,373
I still reckon the 387/379 cascade will happen, the leasing company will have to bite the bullet....
I suspect the DfT doesn't care one bit about overcrowding on a handful of services well away from anywhere in their sphere of interest. If there really is overcrowding, the leasing company is hardly going to reduce its price. It is up to Southern to agree some approach which moves units around within their existing fleet to deal with it because there are still lightly loaded services elsewhere on their network and there is no chance that revenue has recovered.
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
Those damn 701s at swr are holding everything up... its not even funny anymore its utterly embarrassing. I still reckon the 387/379 cascade will happen, the leasing company will have to bite the bullet.... unless they go to scotland to replace 318/320.
Yes, it seems to affect everything at the moment. They are piling up at the depot near me, and it really makes me realise just how bad this has gotten. The whole program seems to have been to 'do it on the cheap' and 'bodge' it, which is now having consequences for the whole network.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,031
Location
Surrey
Yes, it seems to affect everything at the moment. They are piling up at the depot near me, and it really makes me realise just how bad this has gotten. The whole program seems to have been to 'do it on the cheap' and 'bodge' it, which is now having consequences for the whole network.
The 720's work fine the 701 is mismanagement by both supplier and purchaser but helps keep the 313's going a bit longer and some may make 47 years.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Why do you think that?
I cannot see there being enough class 313's in working order if they are kept on until next year and if Southern do not have the stock to run the Coastway services, they will revert to bus replacement services which is what has been done in the past. Even though other services have been able to continue, even if it has meant that Southern have provided shorter trains than required.
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
993
The thread name “Twilight” is really very misleading. They’re hardly in their final days.
They were when the thread started.
The Class 701 mess has meant they are not quite so at risk of imminent withdrawal as they were.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,188
The thing is that revenue on the railway is around 80-85% of what it was pre-pandemic, with the London commuter operators particularly badly affected by the revenue drop. Cutting Southern's fleet by 15% (as has been done) is therefore an entirely logical and proportionate response. It should be noted that SWR's fleet has been similarly cut by around 17%.
How far back do we have to go for Southern's revenue to be 85% of the January 2020 figure? Was the fleet 15% smaller at that time?

== Doublepost prevention - post automatically merged: ==

Most Coastway services - especially Brighton to Southampton - are also rammed with 4 car units, sometimes to the point where no more passengers can board. The whole of Southern seem to be having a rolling stock shortage, so the 377/5s are desperately needed, and hopefully some 387s or 379s at some point. The issue is, you could say the same about Southeastern, who still need their 377/5s.
What was the West Coastway service like in 1995? From memory the Arun valley was still hourly and each of Victoria to Hastings and Victoria to Littlehampton (splitting at Worthing for Bournemouth) were hourly. Though it was around that time that all three routes went half hourly, splitting at Haywards Heath in the latter cases. Brighton to Seaford was half hourly and Hastings hourly. I cannot recall the service pattern heading west out of Brighton.
 
Last edited:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,439
Location
Somerset
The thing is that revenue on the railway is around 80-85% of what it was pre-pandemic, with the London commuter operators particularly badly affected by the revenue drop. Cutting Southern's fleet by 15% (as has been done) is therefore an entirely logical and proportionate response. It should be noted that SWR's fleet has been similarly cut by around 17%.
Only to an accountant!
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,373
How far back do we have to go for Southern's revenue to be 85% of the January 2020 figure? Was the fleet 15% smaller at that time?
That doesn't stand to reason. The costs would have been lower then as well. The problem now is 85% of revenue against higher costs.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,188
That doesn't stand to reason. The costs would have been lower then as well. The problem now is 85% of revenue against higher costs.
Which costs in particular? Electricity springs to mind. Anyway, reducing the fleet size by 15% won't reduce the cost of running the railway by that amount so the fact that revenue and rolling stock have both reduced by 15% is presumably coincidence.
 

4BEP

Member
Joined
21 Jan 2022
Messages
76
Location
Loose
Most Coastway services - especially Brighton to Southampton - are also rammed with 4 car units, sometimes to the point where no more passengers can board. The whole of Southern seem to be having a rolling stock shortage, so the 377/5s are desperately needed, and hopefully some 387s or 379s at some point. The issue is, you could say the same about Southeastern, who still need their 377/5s.
As you say Southeastern still need the 377/5s as the Southwest 707s are metro units and were never intended to free up the 377s. Southeastern is now in the hands of the OLR with no sign of any new mainline stock being ordered. The December TT will mot change things as it will still require all of the 375s and 377s.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,373
The December TT will mot change things as it will still require all of the 375s and 377s.
That does seem to be a failure in the planning. How does it still need all of the 375s and 377s when there are fewer services in the peak relative to historic patterns?

As you say Southeastern still need the 377/5s as the Southwest 707s are metro units and were never intended to free up the 377s. Southeastern is now in the hands of the OLR with no sign of any new mainline stock being ordered.
If, as you say the 707s were just there for Networker replacement, then greater priority should have been given to writing a December 2022 timetable that didn't need as many mainline units and allowed the release of 12 377/5s to Southern.
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
As you say Southeastern still need the 377/5s as the Southwest 707s are metro units and were never intended to free up the 377s. Southeastern is now in the hands of the OLR with no sign of any new mainline stock being ordered. The December TT will mot change things as it will still require all of the 375s and 377s.
And I don't think they will be in any rush to order new units from Alstom after 'Arteriogate', as a 701 sort of unit would have probably been worth looking into for networker replacement, but I can't see them wanting Aventras until SWRs fleet are operating to an acceptable standard. Without getting too speculative, maybe they could order some more 707s. But until the 701s get working, the 707s and 377/5s, and the 313s will have no real choice but to stay put.
 

KJCross1983

Member
Joined
21 Oct 2021
Messages
56
Location
Chichester
From December 3x 313's will be removed and will be replaced with 3x three cars, 3 series 377's. The rest of the 313's are looking at going in May 2023.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,031
Location
Surrey
From December 3x 313's will be removed and will be replaced with 3x three cars, 3 series 377's. The rest of the 313's are looking at going in May 2023.
Good to hear but is that based on SE releasing the balance of the 377/5's or a further rejig of diagrams or service culls?
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
From December 3x 313's will be removed and will be replaced with 3x three cars, 3 series 377's. The rest of the 313's are looking at going in May 2023.
Wow, its been a while since we had 377/3s on the coastway. I wonder if all 28 or so will make there way over by May.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,373
Wow, its been a while since we had 377/3s on the coastway. I wonder if all 28 or so will make there way over by May.
Given there are only 12 or so 313 diagrams, it doesn't seem apparent that the whole 377/3 fleet will migrate to coastal workings.

If they are being worked on a cyclic basis, you would expect all 28 to work coast services at some point but it seems likely that they will retain London metro work as well.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,431
The thing is that revenue on the railway is around 80-85% of what it was pre-pandemic, with the London commuter operators particularly badly affected by the revenue drop. Cutting Southern's fleet by 15% (as has been done) is therefore an entirely logical and proportionate response. It should be noted that SWR's fleet has been similarly cut by around 17%.
Revenue and capacity requirements are not the same.
 

TST2022

Member
Joined
31 Aug 2022
Messages
152
Location
Brighton
Wow, its been a while since we had 377/3s on the coastway. I wonder if all 28 or so will make there way over by May.
I don't know whether this is true or not but a /3 was forming a Portsmouth harbour service from Brighton a few weeks ago

== Doublepost prevention - post automatically merged: ==

Given there are only 12 or so 313 diagrams, it doesn't seem apparent that the whole 377/3 fleet will migrate to coastal workings.

If they are being worked on a cyclic basis, you would expect all 28 to work coast services at some point but it seems likely that they will retain London metro work as well.
I believe the /5s will go to South London with the 6 and 7s and then the /3s doing London work will be cascaded down. All of them can't be taken down because of Redhill to Tonbridge line needing /3s but can always operate with a /1 /2 or /4 aswell
 
Status
Not open for further replies.

Top