According to
http://www.networkrail.co.uk/browse documents/eNRT/May11/timetables/Table186.pdf
the 4th Brighton Express per hour (calling at East Croydon, Gatwick Airport and Hassocks) starts on 5 September.
This service was previously blocked by FCC.
Firstly, how did Southern get it passed this time?
Secondly, why doesn't it start from the beginning of the summer timetable?
http://www.networkrail.co.uk/browse documents/eNRT/May11/timetables/Table186.pdf
the 4th Brighton Express per hour (calling at East Croydon, Gatwick Airport and Hassocks) starts on 5 September.
This service was previously blocked by FCC.
Firstly, how did Southern get it passed this time?
Secondly, why doesn't it start from the beginning of the summer timetable?
