• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Southeastern services serving Blackfriars after 2018

Status
Not open for further replies.

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Things with Thameslink works seem to change quite quickly, and I was wondering what's the latest plans of how many SE services will serve the Blackfriars bays (so terminating trains) in the peaks from 2018, what increase that'll be from now and what services they'll be?

As it's looking like paths for SE to London terminals will reduce long term (Cannon Street by 3 an hour in the peaks I believe with the cutting of the link to Charing Cross) and CX by 1 or 2 an hour, I'm wondering if additional services to Blackfriars will make up for that or even offer more net services overall to London termini?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gtr driver

Member
Joined
24 Apr 2015
Messages
144
Things with Thameslink works seem to change quite quickly, and I was wondering what's the latest plans of how many SE services will serve the Blackfriars bays (so terminating trains) in the peaks from 2018, what increase that'll be from now and what services they'll be?

As it's looking like paths for SE to London terminals will reduce long term (Cannon Street by 3 an hour in the peaks I believe with the cutting of the link to Charing Cross) and CX by 1 or 2 an hour, I'm wondering if additional services to Blackfriars will make up for that or even offer more net services overall to London termini?

I believe pretty much everything that currently runs as a Thameslink train now on SE will terminate in the bays except the Catford loop which will become a full time Thameslink service and these new peak skip stop Maidstone East services that are in the proposed schedule.

I think the big increase in London Bridge - Blackfriars and beyond services will make up for the loss of the few Cannon Street ones; there's not that much in it distance wise as an alternative and may of course many may switch to Blackfriars if their train is going there anywhere than go through the hassle of changing for a Cannon Street service at a busy London Bridge. Which Charing Cross services are ceasing?
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Had a further dig and not sure which CX service exactly will be cut but saw it in a NR presentation online about tph capacity before and after 2018 - 29 an hour down to 28. Cannon Street capacity drops from 25 before 2015 to 22 after 2018 - net loss of 4 trains per hour in the peaks.

With Thameslink on SE territory, we have Catford services going from 2 to 4 an hour in the peaks I believe? The Maidstone ones will go via Bromley and just 2 per hour in the peaks? And only 8 car services too?

So the numbers of TL trains going into Southeastern territory will still be very small and wont do much for the wider SE network. The increase would be a gain of 4 services in peak hours, against a loss of SE capacity at London terminals of 4 trains in the peak hour. So no net change in service frequency for SE commuters as a result of the work, though more CX trains will stop at London Bridge.

I'm really just trying to get a grip on improvements for SE passengers in terms of train frequency from across the network to London Bridge as plans seem to fluctuate. I make it none, but of course other benefits do accrue such as less congestion on approaches and far more trains onwards through the core.

But no net additional trains reaching London Bridge after 2018 means its not really an improvement that will give huge long lasting changes for frequencies on various SE lines. So I wonder what the plans are to cope with long term SE growth - Crossrail taking some passengers and then Bakerloo by 2030 to free up some paths, and even that is far from guaranteed.
 
Last edited:

gtr driver

Member
Joined
24 Apr 2015
Messages
144
I thought the loop was already fully Thameslink ?

I mean it will operate as a Thameslink train full time in that it won't terminate at Blackfriars at any time as it does now at times that elude me (Sundays?)
--- old post above --- --- new post below ---
Had a further dig and not sure which CX service exactly will be cut but saw it in a NR presentation online about tph capacity before and after 2018 - 29 an hour down to 28. Cannon Street capacity drops from 25 before 2015 to 22 after 2018 - net loss of 4 trains per hour in the peaks.

With Thameslink on SE territory, we have Catford services going from 2 to 4 an hour in the peaks I believe? The Maidstone ones will go via Bromley and just 2 per hour in the peaks? And only 8 car services too?

So the numbers of TL trains going into Southeastern territory will still be very small and wont do much for the wider SE network. The increase would be a gain of 4 services in peak hours, against a loss of SE capacity at London terminals of 4 trains in the peak hour. So no net change in service frequency for SE commuters as a result of the work, though more CX trains will stop at London Bridge.

I'm really just trying to get a grip on improvements for SE passengers in terms of train frequency from across the network to London Bridge as plans seem to fluctuate. I make it none, but of course other benefits do accrue such as less congestion on approaches and far more trains onwards through the core.

But no net additional trains reaching London Bridge after 2018 means its not really an improvement that will give huge long lasting changes for frequencies on various SE lines. So I wonder what the plans are to cope with long term SE growth - Crossrail taking some passengers and then Bakerloo by 2030 to free up some paths, and even that is far from guaranteed.

Depends how you look at benefits. There are no extra trains in SE territory that I can see, indeed one of my major bones of contention has been that the Wimbledon Loop business cost the Catford loop its long awaited 4tph because by continuing north of Blackfriars it takes the two paths that were needed and causes a new conflict. Before the politicians got involved 4tph on both routes was proposed. It's not clear what happens in the peak, the Maidstones are peak only but if they are to take the role of the current skip stoppers eg miss Nunhead, Crofton Park, Beckenham Hill, Ravensbourne etc, I don't know.

As for wider benefits, well, SE passengers will benefit from the much better service to Blackfriars, Farringdon, Kings Cross/St Pancras and beyond, albeit with a change at London Bridge. And plenty of Catford Loop users are bound to find a direct train to say, City Thameslink, handy, albeit with a reduced frequency. And of course the knock on effects of all the grade separation, Borough Market viaduct etc will hopefully make all journeys through London Bridge easier.

I'm not sure we can necessarily gauge benefits in terms of direct trains alone any more as the network gets busier, for example even though I don't have any reason to use Cannon Street, I'd prefer 4tph all stations to Cannon Street on the Hayes line rather than 2 of them going to Charing Cross that run fast from Ladywell, on the basis that it would be a predictable turn up and go service. To my mind that would be worth the slower journey and the change at London Bridge for Charing Cross - as long as I know there are frequent trains at every interchange that don't have different stopping patterns, the ability to effectively throw away the timetable is as good as it gets in lieu of having a tube line.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
Yeah I'm confused :/

The Sevenoaks > Blackfriars > Beyond services are already fully Thameslink. Not many terminate in the bay. I believe that the bays had a different plan originally but its changed so many times I'm now totally lost to what the long term plans are no doubt they will change again. I could swear I see a Dover service sitting in the dock of the bays. We also run a 465 soaks service from the bays daily TL trains can also come up the main (they don't stop) and a fair few start away from Orpington but are again, all Thameslink services not SE ones.

I think I read from the original plan the medway/coastals (377 units) are being routed that way on a temporary basis whilst the Thameslink project is ongoing.

SE trains do indeed still use the loop. It's a route to vic. We stop there on various services.

I'll check my Sunday diagrams for you and see what runs. Mostly we run the Sunday services due to GTR staffing issues but they are still Thameslink owned we just drive them.

As for Charing Cross and Cannon Street May I suggest a trawl through the London Bridge thread as there was some good discussion there. In a nutshell the grand plan is to get everyone into London Bridge and have them change trains there. Services being split CX Fasts etc up the Flyover, CX stoppers via New Cross, Cannons via Deptford. Not sure I like it but capacity can be argued by unit length etc too and with a cut in tph you make the numbers up by the increase to 12 cars and the option to now take any service into london bridge then change. I think there has also been an increase in the Dartford > Vic services too so in terms of "london terminals" numbers are maintained.
 
Status
Not open for further replies.

Top