Horror movies?I think it’s more likely that ERS has purchased 2 coaches for filming purposes (Both DM’s). I believe no intermediate coaches have been moved and I don’t think the 465s can operate without the equipment in the TSO/TSOL.
"The Taking of Peckham 123"Horror movies?![]()
Should say based on 20m rolling stockIt would require a huge amount of civils work to accommodate 23m cars on SE routes, the tender documents say that vehicle numbers are based on 23m rolling stock.
A contract notice issued last year by SE contained an option for wrapping up to 17 377's, which could be a clue.Southeastern are going to be replacing some networkers (not all) with some cascaded stock soon. I was told that a very strong hint was made on an internal colleague briefing today.
Would be too small for several networker displacements imoWouldn't that be the final two 707s?
This won't be news to anyone who has been following the discussions around class 379s, the only question is when such a move will happen. It was speculated to be this December but given it doesn't look like enough 379s will be in service to initiate the talked about cascade it will probably be next year now.Southeastern are going to be replacing some networkers (not all) with some cascaded stock soon. I was told that a very strong hint was made on an internal colleague briefing today.
The two remaining 707s would be enough to remove two 465s and a 466.Would be too small for several networker displacements imo
I think you mean 377s, released by 379-led cascade. How many 465/9s remain in service? How many 465s are used on mainline services? I know they still reach Tunbridge Wells.Would the 379s be enough to replace networkers on the mainline? Maybe withdraw some more metcams?
I believe 24x 465/9s are still in service. If two go when the last 707s arrive, and then another 17 when 377s come over as speculated, that still leaves 5x 465/9s, unless SE are planning a (likely unpopular) fleet reduction.I think you mean 377s, released by 379-led cascade. How many 465/9s remain in service? How many 465s are used on mainline services? I know they still reach Tunbridge Wells.
You do wonder whether, given the reported unreliability of the 465/9s, they could actually do without them if 17 377s and the remaining 465s offered greater availability.I believe 24x 465/9s are still in service. If two go when the last 707s arrive, and then another 17 when 377s come over as speculated, that still leaves 5x 465/9s, unless SE are planning a (likely unpopular) fleet reduction.
Possibly, but one other problem SE have been having is their existing 377/5s have been having reliability problems as well; maybe not as bad as 465/9s, but bad enough that Networker diagrams have regularly come in on relief for some 377 diagrams. A notable candidate for this currently is the 18:28 CST-AFK, which is normally am 8-car 377/5 formation, but seems to be a 6-car Networker formation quite regularly, sometimes multiple times a week, which is of course a capacity (and probably also comfort) reduction. The Maidstone East line has and may still do see this as well.You do wonder whether, given the reported unreliability of the 465/9s, they could actually do without them if 17 377s and the remaining 465s offered greater availability.
The 465s used to be diagrammed by subclass, back in May 2022 there were 84 units in traffic from 97 465/0 & 1. They are currently diagrammed together with 100 units in traffic which would need 16 units in traffic to compensate for the 465/9s going away. The 466s look to be used as little as possible with the focus on Tuesday to Thursday, they can't easily be removed without fleet reductions.I believe 24x 465/9s are still in service. If two go when the last 707s arrive, and then another 17 when 377s come over as speculated, that still leaves 5x 465/9s, unless SE are planning a (likely unpopular) fleet reduction.
Under the reported plan, the 377s from Southern get backfilled with 387s from GN which are backfilled with 379s. A small uplift in fleet for both GN and Southern with Networkers dropping out the bottom. There is no reported reliability issue on Southern as regards stock vs timetable.Isn’t SN still having stock shortages too?
2 717s, 3 377s, 2 387s, 4 458s, 6 450s, 3 350s, 2 331s, 2 385s, and 4 720sSoutheastern are going to be replacing some networkers (not all) with some cascaded stock soon. I was told that a very strong hint was made on an internal colleague briefing today.
Don't give them ideas2 717s, 3 377s, 2 387s, 4 458s, 6 450s, 3 350s, 2 331s, 2 385s, and 4 720s![]()
2 717s, 3 377s, 2 387s, 4 458s, 6 450s, 3 350s, 2 331s, 2 385s, and 4 720s![]()
"FIVE, GOLDEN HINDS!"… and a partridge in a pear tree.
These still get maintained at Selhurst?Possibly, but one other problem SE have been having is their existing 377/5s have been having reliability problems as well; maybe not as bad as 465/9s, but bad enough that Networker diagrams have regularly come in on relief for some 377 diagrams. A notable candidate for this currently is the 18:28 CST-AFK, which is normally am 8-car 377/5 formation, but seems to be a 6-car Networker formation quite regularly, sometimes multiple times a week, which is of course a capacity (and probably also comfort) reduction. The Maidstone East line has and may still do see this as well.
I don't think anybody has seriously suggested 350s for Southeastern. Not only are the 350/2s owned by a different ROSCO (part of the reason for their withdrawal), I doubt anybody is willing to convert them to DC. As far as I'm aware, the last time a train was converted from DC to AC or vice versa were the Connex 365s. It's especially unlikely considering other operators (primarily ScotRail) could do better with them.350s would indeed be a very good idea - they are a good, nice experiance train to travel on. The only problem is that the 350/2s to be released by LNW are NOT dual voltage: Now, if someone were to instruct that LNW release the 350/1s instead........
Given that the 350/1s have been refurbished and are to a broadly common standard to the 350/3 and 350/4s and the 350/2s haven't and aren't (in particular being 3+2) that suggestion will go down like a bucket of sick with LNW users.350s would indeed be a very good idea - they are a good, nice experiance train to travel on. The only problem is that the 350/2s to be released by LNW are NOT dual voltage: Now, if someone were to instruct that LNW release the 350/1s instead........
The 466s are needed for a 10 car railway so unless all the 10 car diagrams shift to become 376/707s or are reduced to 8 car, some 466s (the better ones) will need to remain.Surely they won’t bin the 466s?! Capacity problems incoming if they do.