South Western Railway contract extension

Status
Not open for further replies.

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,371
You forgot some of the others like Sunday trains after 1pm being similar to Saturday, the extra 22,000 seats into Waterloo in morning peak, free Wi-Fi on all the trains, and Wi-Fi at all stations, or refurbished toilets on all trains (ever been on a 458)

...... all still awaited
They didn't anticipate 50% fewer passengers travelling at peak time though.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WrongRoad

Member
Joined
3 Nov 2017
Messages
108
Service delivery has got worse, though, which very much is down to SWR. As fewer trains are running, performance really ought to be better.
Yes you are partly right, the real trouble for SWR is the very poor and unreliable Network Rail infrastructure it has to operate on. The SWR region is full of Emergency & Temporary Speed Restrictions which take months if not years to fix.There is always somewhere a Power Reduction Notice meaning trains have to operate at half power in certain sections which mean they can’t get to line speed and the acceleration is very slow costing time. For the past few days there’s been the signalling issues in the Rowlands Castle area.
 

Towers

Established Member
Joined
30 Aug 2021
Messages
3,009
Location
UK
As a related aside, does anybody know definitively what the issue with the Desiro fleet toilets? Pretty much every service seems to have a note saying that accessible toilet facilities are reduced, and experiences on board suggest some sort of ongoing issue with the toilets in general on the 444 & 450s. Is there a parts shortage, or is it something else?
 

nw1

Established Member
Joined
9 Aug 2013
Messages
9,430
Northern is failing for much of the same reasons as GTR didn’t work properly to start with. Too large an operation with too many different routes having completely different needs. It really should be split into at least two TOCs, ideally three.
Is fragmentation a good thing though?

It could be split into operating divisions, a la South Eastern, South Central and South Western Division of the Southern Region, if it is not already (and such things still exist) but separate companies just means less integrated timetable planning and multiple TOCs competing for paths.

It seems natural to me to have a single Northern TOC, because there is a lot of cross-Pennine traffic and routes so even the old LM/ER split doesn't make a lot of sense.

I'd go the other way and merge TPE and Northern, because they are both in the same area of the country (though obviously keep the long-distance stock with the long-distance services!)

My number one beef with privatisation was the fragmented nature of it; while politically I prefer public ownership for the railways I would have been a lot happier with a single franchise, or failing that, a small number of large regional TOCs (e.g. Southern, East Anglia, Great Western, Northern* and Scottish), running all passenger services (with regulated fares), to maximise integration and minimise bureaucracy.

(*basically combined LMS and LNER, minus Scotland and East Anglia, to produce a common TOC both sides of the Pennines).
 
Last edited:

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,885
Northern is failing for much of the same reasons as GTR didn’t work properly to start with. Too large an operation with too many different routes having completely different needs. It really should be split into at least two TOCs, ideally three.
You've got that backwards in my opinion. A lot of the issues are because Northern internally still acts as 2 companies - East and West work under very different T&Cs and have different attitudes. You have the issues of communication with 2 controls. It would be better to go the whole way and merge them completely.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,617
Location
Northampton
You've got that backwards in my opinion. A lot of the issues are because Northern internally still acts as 2 companies - East and West work under very different T&Cs and have different attitudes. You have the issues of communication with 2 controls. It would be better to go the whole way and merge them completely.
And with GTR - Southern and Thameslink are very definitely separate operations internally, not sure if GN are still a separate thing to TL north of the river though.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,617
Location
Northampton
What is OLR? Is that government run TOCs?
Operator of Last Resort, a Government-owned holding company that takes over franchises when the private franchisee drops out. Currently it runs LNER, Northern and SouthEastern. Wales and Scotland have similar but not exactly the same setups. It's a bit complicated at the moment because during COVID lots of the franchise contracts were changed to management contracts, which operate very similarly to the OLR but the holding company is still the private franchisee.
The OLR has also previously run the East Coast franchise between NXEC and VTEC, and SouthEastern after Connex were booted out in 2003.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
And with GTR - Southern and Thameslink are very definitely separate operations internally, not sure if GN are still a separate thing to TL north of the river though.

Very much operationally seperate, with separate depots.
 

Fazaar1889

Member
Joined
5 Oct 2022
Messages
629
Location
South East
Operator of Last Resort, a Government-owned holding company that takes over franchises when the private franchisee drops out. Currently it runs LNER, Northern and SouthEastern. Wales and Scotland have similar but not exactly the same setups. It's a bit complicated at the moment because during COVID lots of the franchise contracts were changed to management contracts, which operate very similarly to the OLR but the holding company is still the private franchisee.
The OLR has also previously run the East Coast franchise between NXEC and VTEC, and SouthEastern after Connex were booted out in 2003.
ah yeah thanks
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,482
SWR were failing even before Covid. They couldn’t manage the service level that SWT could.

On a very different railway. The Waterloo Capacity Upgrade which was underway as the franchise changed hands fundamentally changed Waterloo and it’s approaches, whilst it increased the number of platforms which in theory provided capacity for additional services the limitations it bought in, some expected and some only discovered once NR was completing the work (swinging overlaps on the former international platforms) meant delivery of the previous level of service was always going to be very difficult on a far less flexible station layout regardless of operator of the franchise.
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
As a related aside, does anybody know definitively what the issue with the Desiro fleet toilets? Pretty much every service seems to have a note saying that accessible toilet facilities are reduced, and experiences on board suggest some sort of ongoing issue with the toilets in general on the 444 & 450s. Is there a parts shortage, or is it something else?

The uniloos don’t like being forced open, but in the same breath it’s only recently become required to report to passengers defective accessible toilets.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,187
Location
West Wiltshire
What is OLR? Is that government run TOCs?

Yes, it's operator of last resort based in Waterloo station.

Here is Companies House link, the annual accounts have pages of its activities and what it does

 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,481
Location
Gomshall, Surrey
Yes for sure padded timetables are the order of the day
Horribly so - one wonders how far the trend will go. Every time there is an 'improvement', door opening times increase, for example (and thus dwell times), it seems, along with sundry other small individual increases in timings culminating in significanty slower journeys.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,031
Location
Surrey
Horribly so - one wonders how far the trend will go. Every time there is an 'improvement', door opening times increase, for example (and thus dwell times), it seems, along with sundry other small individual increases in timings culminating in significanty slower journeys.
Indeed and im not convinced it actually helps ppm either now. trains arrive at jcns too early get bought to a stand and then lose time reaccelerating.
 

VauxhallNova

Member
Joined
15 Jan 2021
Messages
191
Location
UK
Pre-Covid they seemed to be in quite a lot of financial trouble.

The announcement from Mr Shapps comes after SWR's recent financial statements indicated the franchise was "not sustainable in the long term".


Quite a turnaround, they must be very relieved to have got through all that onto a low risk deal.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,271
The original financial issues at SWR originated from the timetable assumptions. Bid timetables in that era were devised by the DfT and NR HQ with little input from the NR route. The same with the route capabilities.

So the bid timetable was basically inoperable. Bidders knew that there could be issues but they had to play the game or lose. You made sure you got as many reopeners into your Franchise Agreement as you possibly could.

Then you had to add the Waterloo remodelling (ongoing at franchise change) into the mix, which made a further mess of things, this time with the then current timetable.

So, with assumed revenue heading south, FG had to make provisions in its books for the losses whilst it argued with the DfT as to the extent the franchise should be adjusted to take all the relevant factors into account.

In this era, I don’t think the DfT let many franchises without there being subsequent grief for all concerned.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,031
Location
Surrey
In this era, I don’t think the DfT let many franchises without there being subsequent grief for all concerned.
Had Covid not intervened FSWR would have had to exhaust its parent company guarantee first of which its share was 100m or 145m across the franchise so that provided a fair bit of non governmental subsidy. However, as franchise terminated earlier they settled for less and have ended up better off under the subsequent management contracts.
 

VauxhallNova

Member
Joined
15 Jan 2021
Messages
191
Location
UK
No doubt SWR will continue lots of things from their first five years:

they'll continue not introducing the new trains they promised
they'll continue not carrying out the refurbishments they promised
they'll continue not running the trains they refurbished then scrapped
they'll continue running outer suburban 3+2 stock on longer distance services
and of course they'll continue driving passengers away....

And they'll continue getting their guaranteed profits courtesy of taxpayers funding everything.

I wonder if any of these were committed obligations?
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,271
All irrelevant once the Government took over. The committed obligations effectively went out the window and SWR just did what the DfT wanted them to do and FG collected nice management fees for the privilege.

Just before COVID, there had been a right row brewing between FG and the DfT over the SWR franchise and just how much of the mess was down to the DfT’s specification. After some discussion, the DfT started to do an exercise to compare a revised proposal from FG against what OLR could offer. COVID happened shortly afterwards.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
6,024
Then you had to add the Waterloo remodelling (ongoing at franchise change) into the mix, which made a further mess of things, this time with the then current timetable.
Of course this is post-covid hindsight, but it seems that a lot of time, effort and money ended up being wasted on the Waterloo suburban side remodelling, producing a layout that's apparently more awkward to operate than its predecessor (from comments read on here a while ago). The motivation, enabling 10 coach metro area trains, only lasted a short time until the 456s were withdrawn and scrapped. When the 701s eventually enter service* the longer platforms will be fully used again, but is the extra capacity still needed?

My impression is that 8 car 2x455 sets are quite adequate even with the present reduced timetables, but I no longer use those services myself so I may be mistaken there.

[*edited to remove a speculative element]
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,187
Location
West Wiltshire
What I find odd about this thread, is that it is over two weeks since First Group announced DfT had exercised its option to extend to May 2025, but the DfT has remained silent and not made any announcements, or updated any of its rail contracts webpages

Released : 10.02.2023

FIRSTGROUP PLC
SOUTH WESTERN RAILWAY CONTRACT EXTENSION
FirstGroup plc ('FirstGroup' or ‘the Group') today announces that the Department for Transport (‘DfT’) have exercised their option to continue the current contractual arrangements for the Group’s South Western Railway (‘SWR’) train operating company for the full two year extension period, as set out in SWR’s National Rail Contract (‘NRC’). The current NRC, which began in May 2021, will now run until 25 May 2025 on the existing terms.



 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,209
What I find odd about this thread, is that it is over two weeks since First Group announced DfT had exercised its option to extend to May 2025, but the DfT has remained silent and not made any announcements, or updated any of its rail contracts webpages





So the DfT Media/Press team haven't got their act together.
 