I believe so. Similarly, there's supposed to be a new accessible footbridge with lifts at Cathays, but I suspect that these have been postponed to later phases of the project to help with TfW's cashflow.Does anyone know whether they still intentioned to introduce step free access from the street to platform at Heath High Level?
Much like Crwys Road then.I believe so. Similarly, there's supposed to be a new accessible footbridge with lifts at Cathays, but I suspect that these have been postponed to later phases of the project to help with TfW's cashflow.
Well, we are still not at completion but we are near the point where the present network is upgraded and as you say, credit must go to the Welsh Government and TFW for getting this done. What is now of concern is the Senedd election in a year’s time when a party unfriendly to the railways might get elected and scupper any further work. At the top of the priority list must surely be fixing the capacity problem at Cardiff West junction that limits the City Line to a half hourly service. This is of course on the section of track that is controlled by Network Rail.To be fair to TfW, it's an achievement that the CVL Metro project has been completed at all. It's been funded largely by EU structural funding, that could've been pulled thanks to Brexit, but was secured by Welsh Govt just before Brexit. The UK Govt contribution to the CVL project has been pennies in comparison to the EU funding contribution.
Then we had a global pandemic that put a stop to all upgrade work, followed by rampant inflation. No doubt if it had been a DfT project, all of those factors would've led to the project's cancellation. It's a credit to Welsh Govt and TfW that the project has been seen through to it's completion.
While I agree it’s impressive they have still got this far with the Cardiff valleys metro system when compared to the likes of HS2 which has been repeatedly cut back it should be noted north wales promised extra services along the coast are seemingly postponed indefinitely (the 2017 promised Liverpool to Llandudno/shrewsbury/Cardiff & Manchester to Bangor services) along with cancellations of long established services on the Cambrian line and other promised extra Cambrian services are now unlikely to happen in the name of savings for TFW.To be fair to TfW, it's an achievement that the CVL Metro project has been completed at all. It's been funded largely by EU structural funding, that could've been pulled thanks to Brexit, but was secured by Welsh Govt just before Brexit. The UK Govt contribution to the CVL project has been pennies in comparison to the EU funding contribution.
Then we had a global pandemic that put a stop to all upgrade work, followed by rampant inflation. No doubt if it had been a DfT project, all of those factors would've led to the project's cancellation. It's a credit to Welsh Govt and TfW that the project has been seen through to it's completion.
That is good.The upside is that TfW are seeing significant improvements in revenue, (the most recent quarterly revenue was £41.9m vs £36.4m for the same quarter in the previous year) so that will help both justify and fund future investment.
It’s a £5m increase across all of Wales. That won’t buy much on the railway…..That is good.
I was very worried that the South Wales Metro wouldn’t produce benefits.
And surely it looks broadly in line with the wider industry picture?It’s a £5m increase across all of Wales. That won’t buy much on the railway…..
They had the fourth highest increase in journeys in the last quarter and were in the leading group all on ~15% - https://dataportal.orr.gov.uk/media/voqeicwn/passenger-rail-usage-oct-dec-2024.pdfAnd surely it looks broadly in line with the wider industry picture?
Yep, but that figure for Wales comes after a weak recovery from the pandemic, with journeys still about 6% down on the same quarter in 2019. Admittedly this is a bit better than the industry average (ex Elizabeth line). Also, doesn’t the Chiltern figure reflect abstraction?They had the fourth highest increase in journeys in the last quarter and were in the leading group all on ~15% - https://dataportal.orr.gov.uk/media/voqeicwn/passenger-rail-usage-oct-dec-2024.pdf
Also to be fair the increases happen pretty slowly. Chilterns Oxford extension showed a slow increase over about 5 years - but at the end ridership was up by ~50% - as per https://dataportal.orr.gov.uk/media/1476/table-1223-passenger-journeys-by-operator.ods ridership was up from 19.7m in 2011/12 to 29.3m in 2018/19
The Chiltern figure likely does include some riders who stopped using GWR - yes.Yep, but that figure for Wales comes after a weak recovery from the pandemic, with journeys still about 6% down on the same quarter in 2019. Admittedly this is a bit better than the industry average (ex Elizabeth line). Also, doesn’t the Chiltern figure reflect abstraction?
No strikes, though. Swings/roundabouts? Also, but purely anecdotally, the strongest recovery has been on the marches line.The figures are also for a time of frequent disruption to services for the Metro works, so are actually better than they appear.
Seeing how more services are now 4-5 coaches and the MK4s being (somewhat) better than they were in previous years it's not a surprise the Marches have picked up a bit.No strikes, though. Swings/roundabouts? Also, but purely anecdotally, the strongest recovery has been on the marches line.
Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.Does anyone know why TfW is doing a timetable change on Sunday rather than at a usual timetable change?
I presume it's been planned for a while but I only saw posters about it yesterday.
Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.
![]()
Train timetables | Transport for Wales
Transport for Wales | Buy Cheap Train Tickets and Check Train Timestfw.wales
Check Train Times and Timetables | Great Western Railway
Check train times for routes across the South West and GWR network. Find current timetables or create your own personal timetable online.www.gwr.com
![]()
Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.
![]()
Train timetables | Transport for Wales
Transport for Wales | Buy Cheap Train Tickets and Check Train Timestfw.wales
Check Train Times and Timetables | Great Western Railway
Check train times for routes across the South West and GWR network. Find current timetables or create your own personal timetable online.www.gwr.com
![]()
Are there any updates on this? Have they made any progress on it recently? It seems bizzare how long it's taking.Ynyswen station will remain closed
They stopped work on it over the winter and resumed only in April. https://tfw.wales/projects/metro/south-wales-metro/treherbert-line-transformationAre there any updates on this? Have they made any progress on it recently? It seems bizzare how long it's taking.
"We have temporarily paused works over the winter, allowing our teams to plan the next and final phase of work. On their return to the site in April 2025, they will complete the station footbridge, resurface the station platforms and install new station furniture ready for it’s opening in Autumn 2025."
Quoting TfW:Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.
![]()
Train timetables | Transport for Wales
Transport for Wales | Buy Cheap Train Tickets and Check Train Timestfw.wales
Cardiff and Valleys services
- Early morning services from Coryton and Caerphilly into Cardiff will be retimed to improve connections to east-bound mainline services at Cardiff Central.
- Late evening services between Rhymney and Caerphilly (Monday - Thursday) will be rail replacement services. There will also continue to be rail replacement buses on this section line of the line during selected periods until late Autumn.
- Treherbert services will be departing earlier both into and out of Cardiff and Merthyr services will be departing slightly later into and out Cardiff.
- Platform 2 at Aberdare station will open and will be used for arrivals only. Train services towards Cardiff will continue to depart from platform 1. Services will leave Aberdare slightly later.
- Ynyswen station will remain closed.
No need to hurry with Ynyswen. It's within easy walking distance of Treherbert and Treorci. They should just have closed it, but politics dictated otherwise.Are there any updates on this? Have they made any progress on it recently? It seems bizzare how long it's taking.
No need to hurry with Ynyswen. It's within easy walking distance of Treherbert and Treorci. They should just have closed it, but politics dictated otherwise.
Apparently bridge removal work started on the 10th, with more to come on the 17th and 24th of this month.Looks like the top of the old footbridge at Taffs Well has been taken away, unsure when that happened.
Apparently bridge removal work started on the 10th, with more to come on the 17th and 24th of this month.
According to TfW it’s being donated to Blaenavon Heritage Railway. So it will still be around — just in Blaenavon.It's a shame. I liked that bridge!
I fully understand why it's been replaced by the ugly but accessible one, and why they wouldn't want to maintain both.
According to TfW it’s being donated to Blaenavon Heritage Railway. So it will still be around — just in Blaenavon.