South Wales 'Metro' updates

MikePJ

Member
Joined
10 Dec 2015
Messages
1,013
TfW's Communities Facebook page has published details (linked here) of upcoming Bay Line works:


TfW's website (linked here) also confirms that the platform switch will happen during the closure this month:
Interesting, thanks! It’s going to be a busy month on the Bay branch.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MikePJ

Member
Joined
10 Dec 2015
Messages
1,013
Does anyone know whether they still intentioned to introduce step free access from the street to platform at Heath High Level?
I believe so. Similarly, there's supposed to be a new accessible footbridge with lifts at Cathays, but I suspect that these have been postponed to later phases of the project to help with TfW's cashflow.
 
Joined
22 Jun 2013
Messages
601
I believe so. Similarly, there's supposed to be a new accessible footbridge with lifts at Cathays, but I suspect that these have been postponed to later phases of the project to help with TfW's cashflow.
Much like Crwys Road then.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,652
Location
South Wales
To be fair to TfW, it's an achievement that the CVL Metro project has been completed at all. It's been funded largely by EU structural funding, that could've been pulled thanks to Brexit, but was secured by Welsh Govt just before Brexit. The UK Govt contribution to the CVL project has been pennies in comparison to the EU funding contribution.
Then we had a global pandemic that put a stop to all upgrade work, followed by rampant inflation. No doubt if it had been a DfT project, all of those factors would've led to the project's cancellation. It's a credit to Welsh Govt and TfW that the project has been seen through to it's completion.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,142
To be fair to TfW, it's an achievement that the CVL Metro project has been completed at all. It's been funded largely by EU structural funding, that could've been pulled thanks to Brexit, but was secured by Welsh Govt just before Brexit. The UK Govt contribution to the CVL project has been pennies in comparison to the EU funding contribution.
Then we had a global pandemic that put a stop to all upgrade work, followed by rampant inflation. No doubt if it had been a DfT project, all of those factors would've led to the project's cancellation. It's a credit to Welsh Govt and TfW that the project has been seen through to it's completion.
Well, we are still not at completion but we are near the point where the present network is upgraded and as you say, credit must go to the Welsh Government and TFW for getting this done. What is now of concern is the Senedd election in a year’s time when a party unfriendly to the railways might get elected and scupper any further work. At the top of the priority list must surely be fixing the capacity problem at Cardiff West junction that limits the City Line to a half hourly service. This is of course on the section of track that is controlled by Network Rail.
 

Cambrian359

Member
Joined
17 Jun 2018
Messages
302
To be fair to TfW, it's an achievement that the CVL Metro project has been completed at all. It's been funded largely by EU structural funding, that could've been pulled thanks to Brexit, but was secured by Welsh Govt just before Brexit. The UK Govt contribution to the CVL project has been pennies in comparison to the EU funding contribution.
Then we had a global pandemic that put a stop to all upgrade work, followed by rampant inflation. No doubt if it had been a DfT project, all of those factors would've led to the project's cancellation. It's a credit to Welsh Govt and TfW that the project has been seen through to it's completion.
While I agree it’s impressive they have still got this far with the Cardiff valleys metro system when compared to the likes of HS2 which has been repeatedly cut back it should be noted north wales promised extra services along the coast are seemingly postponed indefinitely (the 2017 promised Liverpool to Llandudno/shrewsbury/Cardiff & Manchester to Bangor services) along with cancellations of long established services on the Cambrian line and other promised extra Cambrian services are now unlikely to happen in the name of savings for TFW.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
And surely it looks broadly in line with the wider industry picture?
They had the fourth highest increase in journeys in the last quarter and were in the leading group all on ~15% - https://dataportal.orr.gov.uk/media/voqeicwn/passenger-rail-usage-oct-dec-2024.pdf

Also to be fair the increases happen pretty slowly. Chilterns Oxford extension showed a slow increase over about 5 years - but at the end ridership was up by ~50% - as per https://dataportal.orr.gov.uk/media/1476/table-1223-passenger-journeys-by-operator.ods ridership was up from 19.7m in 2011/12 to 29.3m in 2018/19
 
Last edited:

slowroad

Member
Joined
23 Jul 2021
Messages
371
Location
Wales
They had the fourth highest increase in journeys in the last quarter and were in the leading group all on ~15% - https://dataportal.orr.gov.uk/media/voqeicwn/passenger-rail-usage-oct-dec-2024.pdf

Also to be fair the increases happen pretty slowly. Chilterns Oxford extension showed a slow increase over about 5 years - but at the end ridership was up by ~50% - as per https://dataportal.orr.gov.uk/media/1476/table-1223-passenger-journeys-by-operator.ods ridership was up from 19.7m in 2011/12 to 29.3m in 2018/19
Yep, but that figure for Wales comes after a weak recovery from the pandemic, with journeys still about 6% down on the same quarter in 2019. Admittedly this is a bit better than the industry average (ex Elizabeth line). Also, doesn’t the Chiltern figure reflect abstraction?
 
Joined
22 Jun 2013
Messages
601
The figures are also for a time of frequent disruption to services for the Metro works, so are actually better than they appear.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
Yep, but that figure for Wales comes after a weak recovery from the pandemic, with journeys still about 6% down on the same quarter in 2019. Admittedly this is a bit better than the industry average (ex Elizabeth line). Also, doesn’t the Chiltern figure reflect abstraction?
The Chiltern figure likely does include some riders who stopped using GWR - yes.
 

slowroad

Member
Joined
23 Jul 2021
Messages
371
Location
Wales
The figures are also for a time of frequent disruption to services for the Metro works, so are actually better than they appear.
No strikes, though. Swings/roundabouts? Also, but purely anecdotally, the strongest recovery has been on the marches line.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,598
Location
Llanharan
No strikes, though. Swings/roundabouts? Also, but purely anecdotally, the strongest recovery has been on the marches line.
Seeing how more services are now 4-5 coaches and the MK4s being (somewhat) better than they were in previous years it's not a surprise the Marches have picked up a bit.

It's also good to see the valleys are on an upwards trend, I'm sure many are happy to see the back of the sprinters, specifically on the TAM lines!
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,599
I also wonder if any if this is down to a higher percentage of people actually buying tickets / paying thanks to ticket machines at stations that previously didn't have one, the payg scheme and even increased availability of etickets. Purely anecdotal but I know my old man will usually buy a ticket on his phone now rather than board and wait for the guard as was previously the norm (because there were no ticketing facilities).
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,952
Does anyone know why TfW is doing a timetable change on Sunday rather than at a usual timetable change?

I presume it's been planned for a while but I only saw posters about it yesterday.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,652
Location
South Wales
Does anyone know why TfW is doing a timetable change on Sunday rather than at a usual timetable change?

I presume it's been planned for a while but I only saw posters about it yesterday.
Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.

 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,952
Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.


Ooops!

Somehow I had it in mind we were already on the "summer" timetable

That makes sense then.
 

positron

Member
Joined
18 Oct 2022
Messages
706
Location
Cardiff
Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.

Ynyswen station will remain closed
Are there any updates on this? Have they made any progress on it recently? It seems bizzare how long it's taking.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,013
Are there any updates on this? Have they made any progress on it recently? It seems bizzare how long it's taking.
They stopped work on it over the winter and resumed only in April. https://tfw.wales/projects/metro/south-wales-metro/treherbert-line-transformation

"We have temporarily paused works over the winter, allowing our teams to plan the next and final phase of work. On their return to the site in April 2025, they will complete the station footbridge, resurface the station platforms and install new station furniture ready for it’s opening in Autumn 2025."

== Doublepost prevention - post automatically merged: ==

Next Sunday is this year's May timetable change date, in line with all other TOC's across Britain.

Quoting TfW:

Cardiff and Valleys services​



  • Early morning services from Coryton and Caerphilly into Cardiff will be retimed to improve connections to east-bound mainline services at Cardiff Central.
  • Late evening services between Rhymney and Caerphilly (Monday - Thursday) will be rail replacement services. There will also continue to be rail replacement buses on this section line of the line during selected periods until late Autumn.
  • Treherbert services will be departing earlier both into and out of Cardiff and Merthyr services will be departing slightly later into and out Cardiff.
  • Platform 2 at Aberdare station will open and will be used for arrivals only. Train services towards Cardiff will continue to depart from platform 1. Services will leave Aberdare slightly later.
  • Ynyswen station will remain closed.

If you're a regular commuter on the lines south of Pontypridd it's also worth knowing that because the Bay line is closed until May 25th, the normal 2tph Pontypridd-Queen St-Cardiff Bay trains are completely withdrawn.
 
Last edited:

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
917
Are there any updates on this? Have they made any progress on it recently? It seems bizzare how long it's taking.
No need to hurry with Ynyswen. It's within easy walking distance of Treherbert and Treorci. They should just have closed it, but politics dictated otherwise.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,952
No need to hurry with Ynyswen. It's within easy walking distance of Treherbert and Treorci. They should just have closed it, but politics dictated otherwise.

Google tells me about a 20 minute walk either way.

If I'd moved to somewhere near a station and it was being proposed that I add a 40 minute round trip walk every time I needed to catch the train, I would not consider myself to be playing politics if I objected (which I would!)
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,952
Apparently bridge removal work started on the 10th, with more to come on the 17th and 24th of this month.

It's a shame. I liked that bridge!

I fully understand why it's been replaced by the ugly but accessible one, and why they wouldn't want to maintain both.

But it does seem a shame that once an accessible bridge has been built, it seems to be too difficult to make sure the lifts work all the time.
 

tigermonstera

Member
Joined
11 Mar 2025
Messages
150
Location
UK
It's a shame. I liked that bridge!

I fully understand why it's been replaced by the ugly but accessible one, and why they wouldn't want to maintain both.
According to TfW it’s being donated to Blaenavon Heritage Railway. So it will still be around — just in Blaenavon.
 