Other than at rush hours, a 1 car dmu would suffice for the Coryton branch. At one time, the service was run by bubble cars (class 121).
Today it's a single 153 (with the accessible lavatory taking up about a quarter of the space and reducing the seating capacity to less than 60).
 

Last Hurrah

Member
Joined
17 Jan 2023
Messages
124
Location
Canton
Today it's a single 153 (with the accessible lavatory taking up about a quarter of the space and reducing the seating capacity to less than 60).
Not ideal having a 153 arriving at Ninian Park after a match at the Cardiff City Stadium

Hopefully pre/post match services are something that will be significantly improved when the Metro works are completed

People were actively encouraged to use Grangetown station instead although it is further away
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,679
Location
Croydon
Not ideal having a 153 arriving at Ninian Park after a match at the Cardiff City Stadium

Hopefully pre/post match services are something that will be significantly improved when the Metro works are completed

People were actively encouraged to use Grangetown station instead although it is further away
If its like Crystal Palace then Home supporters and Away supporters are encouraged to use different stations so probably both stations.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,016
7B5ACA5C-4613-4082-A4E7-6BAF05E0CDF9.jpeg
Cardiff Bay update: we have track! No ballast yet, and I couldn’t see if the new turnout has been installed yet. 8797EF56-C4F5-4641-BC7B-2968A6A543E7.jpeg
 

bradleyd

Member
Joined
4 Apr 2011
Messages
149
Location
South Wales, but from the flat Southlands of lincs
My question, I was walking around Pontypridd earlier - I normally walk under the viaducts, but today, I decided to walk through the car park and then over the footbridge to the station, so I saw these structures for the first time (to the north of the station, where the Rhondda line splits from the Merthyr/aberdare lines). Are they purely for carrying wiring from one side of the track to the other, or do they have anything to do with electrification from that point? I have no idea where the electrification is due to start north of the station, which is bad when I live here and use the train to Cardiff and back 3 or 4 times a week,
 

Attachments

  • IMG20230428152224.jpg
    IMG20230428152224.jpg
    4.7 MB · Views: 201

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
My question, I was walking around Pontypridd earlier - I normally walk under the viaducts, but today, I decided to walk through the car park and then over the footbridge to the station, so I saw these structures for the first time (to the north of the station, where the Rhondda line splits from the Merthyr/aberdare lines). Are they purely for carrying wiring from one side of the track to the other, or do they have anything to do with electrification from that point? I have no idea where the electrification is due to start north of the station, which is bad when I live here and use the train to Cardiff and back 3 or 4 times a week,
IIRC the OLE north of the station resumes after both viaducts.
The masts here are mainly for cable carrying, and also switching - I think the Track Sectioning Site (TSS) at Pontypridd is going in the delta between the two branches (after the demolition of the old signalbox).
 

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
I understand engineering work is taking place around Treforest this morning, but this image from Traksy taken at 0530 is interesting!
 

Attachments

  • Screenshot_20230429_053443_Samsung Internet.jpg
    Screenshot_20230429_053443_Samsung Internet.jpg
    162.7 KB · Views: 189

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,638
Location
Rochdale
I presume Dave is taking retirement as at Fairwater it says 1990 - 2023. So Long, enjoy your retirement
 

Signal_Box

Member
Joined
25 Dec 2021
Messages
739
Location
UK
I presume Dave is taking retirement as at Fairwater it says 1990 - 2023. So Long, enjoy your retirement

Radyr SCC closed at 0030 this morning, control passing to Taff Wells over the weekend.

There is always a retirement.
 

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,575
Location
England
Radyr SCC closed at 0030 this morning, control passing to Taff Wells over the weekend.
Along with Abercynon PSB although I don't know if that closed at exactly the same time. Signal prefixes for control from Taffs Well (or, according to Philips Deaves' website, the "Core Valley Lines IECC" are VA (former Abercynon PSB signals) and VR (former Valleys Radyr PSB signals).

Having spent much time travelling along it under the Token system over the last 13 years I did send NR an email to ask if it might be possible to get hold of one of each type of token for the Porth - Treherbert line but have had no response. It would be nice to have a souvenir so I hope they will reply. Or will I have to pay their "redundant assets" section a large amount of money that will probably be equal to 50% of my monthly income?

Dave
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
Having spent much time travelling along it under the Token system over the last 13 years I did send NR an email to ask if it might be possible to get hold of one of each type of token for the Porth - Treherbert line but have had no response. It would be nice to have a souvenir so I hope they will reply. Or will I have to pay their "redundant assets" section a large amount of money that will probably be equal to 50% of my monthly income?
The tokens, along with the rest of the 'core valley lines' belong to the Welsh Government.
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,631
Location
wales
The tokens, along with the rest of the 'core valley lines' belong to the Welsh Government.
They may also be offered to museums first, Pembrokeshire museums for instance have some of the redundant tokens, and those things are massive.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
Canton Depot has also had its OLE energised.

BAM Nuttall installed the wires, Balfour Beatty did the HV power works.
Now we just need that annoying gap between Canton & the limit of wiring between Ninian Park & Waun-gron Park to be closed...<D
 

WesternBiker

Member
Joined
26 Aug 2020
Messages
692
Location
South Cambridgeshire
Canton Depot has also had its OLE energised.

BAM Nuttall installed the wires, Balfour Beatty did the HV power works.
Now we just need that annoying gap between Canton & the limit of wiring between Ninian Park & Waun-gron Park to be closed...<D
Is it planned to be? (To be honest, I find it hard to remember which bits are being wired and which are not...)
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
Is it planned to be? (To be honest, I find it hard to remember which bits are being wired and which are not...)
Sadly, it isn't, because it's NR-owned infrastructure and the works only cover the TfW-owned infrastructure.
Hopefully they'll remedy that at some point...
 

WesternBiker

Member
Joined
26 Aug 2020
Messages
692
Location
South Cambridgeshire
Sadly, it isn't, because it's NR-owned infrastructure and the works only cover the TfW-owned infrastructure.
Hopefully they'll remedy that at some point...
Thanks for the info. I wasn’t aware the depot was an island of TfW ownership. Hopefully logic will prevail at some point, as you say…
 

Last Hurrah

Member
Joined
17 Jan 2023
Messages
124
Location
Canton
Now we just need that annoying gap between Canton & the limit of wiring between Ninian Park & Waun-gron Park to be closed...<D

Gap extends from Canton Depot/ Ninian Park station beyond the TFW/CVL Route Boundary (RAD 1m 20ch) to RAD 1m 39ch

Sanatorium Road bridge is RAD 1m 24ch

Bit surprised masts didn’t go to the TFW/CVL Route Boundary - circa another 200 metres or so . . .
 
Last edited:

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,631
Location
wales
Sadly, it isn't, because it's NR-owned infrastructure and the works only cover the TfW-owned infrastructure.
Hopefully they'll remedy that at some point...

Thanks for the info. I wasn’t aware the depot was an island of TfW ownership. Hopefully logic will prevail at some point, as you say…
Could they not just approach Network Rail and basically say we pay for it you make it happen?
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
Could they not just approach Network Rail and basically say we pay for it you make it happen?
Yes, they could. But they won't as a matter of principle. Rail infrastructure is not devolved (apart from the core valley lines which were given to the Welsh Government).
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
Yes, they could. But they won't as a matter of principle. Rail infrastructure is not devolved (apart from the core valley lines which were given to the Welsh Government).
The Welsh Government have paid them directly for some infrasturcture improvements in the past (from memory, linespeed work around Wrexham, and refurbishing the bay platforms at Wrexham General). But principles can change over time, of course, and paying for piecemeal NR electrification around Cardiff detracts from the argument of getting NR/Westminster to fund electrifying the SWML as a whole.
 