Apologies if it has already been linked, but there's a new BBC Wales documentary "How to Fix a Railway" on the Metro upgrades. It's available on iPlayer here:

Thanks for posting not sure its been shown on BBC nationally so maybe initially a regional programme.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Markdvdman

Member
Joined
14 Aug 2011
Messages
493
Location
Merthyr Tydfil / Gorslas
Hmm watched it on the Iplayer. Was a bit of too much of covid stuff really, more veg rather than meat!!! However, sayng the end point is now 2025 rather than what they told us as 2024 is not a good sign! There are issues with Treherbert that could be the reason for that I guess but those of us in the so called core valley lines have another 2 years of frustration it seems. The worst is the Pontypridd to Cardiff bus replacements whereby they cut the half hourly rail service to hourly. Still, will be nice when it is all done so they can then work on the rest of Wales who deserve it too!!
 

DaveHarries

Established Member
Joined
12 Dec 2011
Messages
2,574
Location
England
[.....] There are issues with Treherbert that could be the reason for that I guess [.....]
What are the issues with Treherbert? IIRC the plan was abolition, at some point, of the current method of working the line by NSKT (?) in favour of conventional signalling as well as some more double-tracking and some new / extended platforms.

Dave
 

Markdvdman

Member
Joined
14 Aug 2011
Messages
493
Location
Merthyr Tydfil / Gorslas
What are the issues with Treherbert? IIRC the plan was abolition, at some point, of the current method of working the line by NSKT (?) in favour of conventional signalling as well as some more double-tracking and some new / extended platforms. Dave

I believe there are issues with gas pipes. That is what somebody heard from a mate who is in the know. Allegedly. I hope they are wrong and everything will be ready by next year......
 

Hwnt52

Member
Joined
12 Aug 2016
Messages
48
Location
Cardiff
Two pictures from Quakers Yard today. All work is due to be completed in May and the station fully opened. The Merthyr line is closed for the coming week.P3194985A Quakers Yard.jpgP3194986A Quakers Yard.jpg
 

Hwnt52

Member
Joined
12 Aug 2016
Messages
48
Location
Cardiff
Two more photos of the Merthyr Line works, taken from the Abercanaid overbridge just north of Pentre-bach in typical valleys weather. The first is looking north towards Merthyr with the class 66 in the distance) and the second is looking south towards Pentre-bach station. Rebuilding the long double track section here has required four works trains from Westbury for each of the last three days.P3204987A Pentrebach.jpgP3204989A Pentrebach.jpg
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,099
I guess it’s just an illusion but those gantries look really high.
Amazing how other countries seem to be able to produce lightweight elegant gantries for high speed main line railways, but here we have heavy ugly things for relatively low speed trams.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,587
They've finally made official what the local rumours have been saying for a while - the Treherbert line needs a long term closure for the works. Current plan is rail replacement buses from the end of April this year until year next year. All I can say is that I bloody hope it is better organised than the current replacement buses have been. Because if not, every potential passenger will be pushed away from the railways by the time it reopens!

Link for the source of the news - https://news.tfw.wales/news/a-century-of-history-to-be-transformed-on-the-treherbert-line, with the relevant quote added:
The sheer scale of work needed on the on the Treherbert Line will mean the route between Pontypridd and Treherbert will be closed from 30 April 2023 until early 2024. No train services will operate during this time.

Why they couldn't have come out and said this months ago I have no idea given a closure of this length must have been in the planning for ages.
 
Last edited:

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
I also wonder if the works taking place on the Taff Vale lines would prevent any future freight operating? Potential for freight is low at the moment but with the greener agenda who knows what opportunities may present themselves.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
They've finally made official what the local rumours have been saying for a while - the Treherbert line needs a long term closure for the works. Current plan is rail replacement buses from the end of April this year until year next year. All I can say is that I bloody hope it is better organised than the current replacement buses have been. Because if not, every potential passenger will be pushed away from the railways by the time it reopens!

Link for the source of the news - https://news.tfw.wales/news/a-century-of-history-to-be-transformed-on-the-treherbert-line, with the relevant quote added:


Why they couldn't have come out and said this months ago I have no idea given a closure of this length must have been in the planning for ages.
Are they so incompetent they have only just realised this or have they just been hiding it since the plan was developed?
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
916
Are they so incompetent they have only just realised this or have they just been hiding it since the plan was developed?
There is another alternative namely that the work on the Aberdare and Merthyr lies has proved to be more complex and time-consuming than TFW expected and that to deliver the whole project within a reasonable timescale they decided to use the nuclear option.

I have no idea if this is the case but it is a possible explanation given that it would be virtually impossible to start the tram train services to Merthyr and Aberdare while still running DMUs up the Rhondda valley.
 

Tumbleweed

Member
Joined
17 Apr 2013
Messages
189
Wow...nearly a year...hope people remember there is a railway there when its finished!

== Doublepost prevention - post automatically merged: ==

I also wonder if the works taking place on the Taff Vale lines would prevent any future freight operating? Potential for freight is low at the moment but with the greener agenda who knows what opportunities may present themselves.
Probably would be fine between Pontypridd and Cardiff for extra freight lines but further up the valleys space would be a problem in some areas. A lot of the land once used for freight lines has been redeveloped/sold off etc.
 
Last edited:

Dr Day

Member
Joined
16 Oct 2018
Messages
758
Location
Bristol
Probably would be fine between Pontypridd and Cardiff for extra freight lines
Are you thinking about building new tracks just for freight or capacity for freight trains on the existing tracks? Either would appear pretty tricky between Pontypridd and Cardiff with the proximity of the track to the surrounding built up area (certainly at the Cardiff end) and 12-18 passenger trains per hour depending on the track section. The tram-trains will be presumably have to be compatible with Cwmbargoed freight as they share tracks through Queen Street.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
Are you thinking about building new tracks just for freight or capacity for freight trains on the existing tracks? Either would appear pretty tricky between Pontypridd and Cardiff with the proximity of the track to the surrounding built up area (certainly at the Cardiff end) and 12-18 passenger trains per hour depending on the track section. The tram-trains will be presumably have to be compatible with Cwmbargoed freight as they share tracks through Queen Street.
Some going via the cityline don't forget
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
916
I'm curious as to what freight people think might be carried on the Merthyr / Treherber / Aberdare lines. Ffos y Fran mine has applied for a short extention before closure but I think I'm right in saying that their coal is shipped via the Taff Bargoed and Rhymney Valley lines neither of which will see any Tram-Trains.

What else might there be?
 

Tumbleweed

Member
Joined
17 Apr 2013
Messages
189
Are you thinking about building new tracks just for freight or capacity for freight trains on the existing tracks? Either would appear pretty tricky between Pontypridd and Cardiff with the proximity of the track to the surrounding built up area (certainly at the Cardiff end) and 12-18 passenger trains per hour depending on the track section. The tram-trains will be presumably have to be compatible with Cwmbargoed freight as they share tracks through Queen Street.
Obviously it there would need to be freight loops at least.
 

Com166

Member
Joined
15 Aug 2019
Messages
19
Location
Cardiff
Wow...nearly a year...hope people remember there is a railway there when its finished!

== Doublepost prevention - post automatically merged: ==


Probably would be fine between Pontypridd and Cardiff for extra freight lines but further up the valleys space would be a problem in some areas. A lot of the land once used for freight lines has been redeveloped/sold off etc.
Some years ago when Radyr signalling was done the 2 tracks were slewed to use the whole track bed and increase line speed between Radyr and Treforest
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
916

South Wales Metro reaches new milestone with arrival of first new tram-train​

https://nation.cymru/news/south-wal...lestone-with-arrival-of-first-new-tram-train/

The South Wales Metro project has reached another milestone with the arrival of the first brand new tram-train to Transport for Wales’ (TfW) new depot in Taff’s Well.

The Class 398 tram-train was delivered by road to the new Taff’s Well depot overnight on 21 March.
 