sefyllian
Member
- Joined
- 14 Jan 2013
- Messages
- 138
How would a separate platform and line fit in with the Cardiff/RCT/WG aspiration for a line from Beddau via Plasdwr connecting to the Central to Bay line?
Would provision be made to join these at a later date, if that should come to fruition?
There have been so many plans/aspirations/dreams that it’s hard to keep track!
I noticed the current TfW consulation on extending the other end of the line (Cardiff Bay–Newport Road) does imply the line to Central will not be connected to the mainline at that end. The proposed service is stated as just Cardiff Central–Newport Road (via the Bay).

Here’s a 1900 map of the station that shows the old Riverside platforms, for info. (Photo: Brian Mortimer / CC BY 2.0)





