mallard
Established Member
- Joined
- 12 Apr 2009
- Messages
- 1,304
Any chance they can be cleared through the Thameslink core, I believe the linespeed on the electrified part of the MML is only 110 anyway.![]()
Doubt it, no end doors. A tunnel down near Folkestone (I think?) had to be modified to permit them, since previously it had all been end-gangway stock like the CEPs VEPs and Electrostars down there.
