BanburyBlue
Member
- Joined
- 18 May 2015
- Messages
- 878
With the latest news on the delays on the Great Western electrification, I was wondering where things lay with electrification?
There is a lot of talk about electrifying the MML, and the electric spine (Reading I think to Birmingham). I was also reading another thread on East-West rail with electrification being mentioned.
Are these sequential projects? Perhaps because only a limited number of people with the right skills to do the work?
When (and if) are they planned?
Or is it just that no-one has the money to pay for it all?
Thanks.
There is a lot of talk about electrifying the MML, and the electric spine (Reading I think to Birmingham). I was also reading another thread on East-West rail with electrification being mentioned.
Are these sequential projects? Perhaps because only a limited number of people with the right skills to do the work?
When (and if) are they planned?
Or is it just that no-one has the money to pay for it all?
Thanks.