Hi, everyone
I would like to ask you that in the UK, what is the proportion of responsibility for the cost of signalling system maintenance between TOCs and Network Rail?
In addition, the signalling maintenance cost is combined with the fixed track access charge or the variable track access charge?
Thank you
I would like to ask you that in the UK, what is the proportion of responsibility for the cost of signalling system maintenance between TOCs and Network Rail?
In addition, the signalling maintenance cost is combined with the fixed track access charge or the variable track access charge?
Thank you