Hi, everyone

I would like to ask you that in the UK, what is the proportion of responsibility for the cost of signalling system maintenance between TOCs and Network Rail?
In addition, the signalling maintenance cost is combined with the fixed track access charge or the variable track access charge?

Thank you
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
22,006
Location
Airedale
I am not aware of specific charges made by NR to TOCs for signalling maintenance. AFAIK the cost is borne 100% by NR and recouped by TACs.
 

100andthirty

Member
Joined
5 Mar 2012
Messages
608
Location
Milton Keynes
Question 1) - entirely Network Rail
Question 2) - linking costs to track access charge whether fixed or variable is not easy. I think the fixed charge is aimed at upgrades, and variable at maintenance, but i suspect that is grossly simplistic.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
36,043
Hi, everyone

I would like to ask you that in the UK, what is the proportion of responsibility for the cost of signalling system maintenance between TOCs and Network Rail?
In addition, the signalling maintenance cost is combined with the fixed track access charge or the variable track access charge?

Thank you

The cost of all signalling maintenance on the NR network is the responsibility of NR.

Question 1) - entirely Network Rail
Question 2) - linking costs to track access charge whether fixed or variable is not easy. I think the fixed charge is aimed at upgrades, and variable at maintenance, but i suspect that is grossly simplistic.

In very simple terms* the total value of fixed track access charges represents the cost necessary to operate and maintain the network in a steady state condition, with full availability, if no trains ran. The variable charge is that which accrues by the principle of trains running.

* as ever it isn’t this simple
 

Tio Terry

Member
Joined
2 May 2014
Messages
1,198
Location
Spain
The fixed, trackside, signalling system is the responsibility of Network Rail. Any on train element of the signalling system - AWS, arguably GSM-R and any ETCS/ERTMS - is normally the responsibility of the TOC. As the industry moves towards in-cab signalling - Heathrow services, GW Mainline, ECML - more responsibility will transfer to the TOC and/or their rolling stock provider.
 