• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Signalling disruption between Doncaster and York - 14/05/24

Status
Not open for further replies.

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
I’m on a northbound LNER between London and York. Stuck way down the route because of signal issues between Doncaster and York. Any further info on what’s going on?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
11 Feb 2022
Messages
187
Location
Doncaster
Loss of signalling, Suspected theft of signalling cables

Edit: Complete block on all lines between York and Doncaster, NR staff hoping to clamp points and implement emergency special working
Signalling lost between Moat Hills and Shaftholme Jn

Another edit to pacify being corrected time and time again: One TOC is saying cable theft, others stating signal fault
 
Last edited:

800001

Established Member
Joined
24 Oct 2015
Messages
7,378
Loss of signalling, Suspected theft of signalling cables

Edit: Complete block on all lines between York and Doncaster, NR staff hoping to clamp points and implement emergency special working
Signalling lost between Moat Hills and Shaftholme Jn
It’s not cable theft, it’s a fuse that’s blown, but module has melted as well.
 

Mike99

Member
Joined
4 Mar 2011
Messages
863
Location
G E M L
I’m on a northbound LNER between London and York. Stuck way down the route because of signal issues between Doncaster and York. Any further info on what’s going on?
Out of interest which service are you on?
 

Intercity_225

Member
Joined
13 Jan 2024
Messages
600
Location
March
I see at Peterborough they are letting the Leeds services through, overtaking the York services. Could they keep the queue onto the slows so that the suburban Thameslinks and Leeds/Harrogate/Skipton/Bradford services can overtake?
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
Announcer says cable theft. Any further info on logs to suggest it is or could this be false?

== Doublepost prevention - post automatically merged: ==

I see at Peterborough they are letting the Leeds services through, overtaking the York services. Could they keep the queue onto the slows so that the suburban Thameslinks and Leeds/Harrogate/Skipton/Bradford services can overtake?
In theory this works I think. We've been handily placed on the initial part of the down slow, while trains stopping are passing into 2 and 5
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,378
Announcer says cable theft. Any further info on logs to suggest it is or could this be false?

== Doublepost prevention - post automatically merged: ==


In theory this works I think. We've been handily placed on the initial part of the down slow, while trains stopping are passing into 2 and 5
Everything still suggests signal fault, blown fuse in a location cabinet, which has also melted the holder so not a quick fix.

Still not seeing anything regards cable theft (but if it’s northern or TPE) depends what delay code they are using.
 

Intercity_225

Member
Joined
13 Jan 2024
Messages
600
Location
March
Interesting that the LNER advice on the NRE website says services via Leeds are unaffected, while at the top of the page it says services are affected to Bradford Foster Square. Mistake, perhaps?
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
We are now moving with intention to begin single line working north of Doncaster on the up line
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,612
Location
Northampton
I see at Peterborough they are letting the Leeds services through, overtaking the York services. Could they keep the queue onto the slows so that the suburban Thameslinks and Leeds/Harrogate/Skipton/Bradford services can overtake?
Only 1 signal section on the slow before the platform, although they are now letting 1S30 forward so 1S31 can pull into the station.

A Hull Trains service to Beverly has also diverted at Doncaster (skipping Selby) to avoid the single line working section.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,378
Interesting that the LNER advice on the NRE website says services via Leeds are unaffected, while at the top of the page it says services are affected to Bradford Foster Square. Mistake, perhaps?
Terminating the Leeds extensions at Leeds, releases crew to divert 2 services via Micklefield.

One addition Leeds to York and 1E25 via Micklefield.

== Doublepost prevention - post automatically merged: ==

We are now moving with intention to begin single line working north of Doncaster on the up line
Suspension of services at Kings Cross and Peterborough for northbound Anglo Scot’s services lifted, with emergency special working to be implemented very soon.
 
Joined
11 Feb 2022
Messages
187
Location
Doncaster
Still not seeing anything regards cable theft (but if it’s northern or TPE) depends what delay code they are using.
I sent you a DM from Arrakis sent by Hull trains showing this.

Only messages from Northern are for ticket acceptance for rest of the day
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,378
I sent you a DM from Arrakis sent by Hull trains showing this.

Only messages from Northern are for ticket acceptance for rest of the day
So that message comes from TPE, so do not know where they have got cable theft from, as all Comms as I have said has been signal fault.

== Doublepost prevention - post automatically merged: ==

I sent you a DM from Arrakis sent by Hull trains showing this.

Only messages from Northern are for ticket acceptance for rest of the day
So, they are looking for possibilities of cable theft, but, still, everything points to a blown fuse.

However attempted cable theft is still not confirmed.
 
Last edited:

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
OTT showing trains going on the down line through the "danger zone". Is this special working or normal working?

And why on earth were 1S30 and my train (1S31) held at Peterborough when a short term resolution 40 mins up the line was moving into place?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,378
OTT showing trains going on the down line through the "danger zone". Is this special working or normal working?

And why on earth were 1S30 and my train (1S31) held at Peterborough when a short term resolution 40 mins up the line was moving into place?
Emergency Special Working now in place.

You will have been held as timescales may not of been known, can’t hold you at Grantham or Newark as Blocking platforms, so Peterborough better option rather than having you sat in middle of countryside in a loop or slow line.

Plus you wouldn’t have got any further by being moved further ahead, as you are waiting behind 1S28 and 1N29 to pass through the area.
 
Last edited:

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
Currently waiting outside Doncaster. Is it possible they're looking to sort the issue now? Announcer said engineers onsite and not much seems to be moving
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,378
Currently waiting outside Doncaster. Is it possible they're looking to sort the issue now? Announcer said engineers onsite and not much seems to be moving
Line block taken after passage of 1N29 to rectify issue.

Normal working given at 22:02.
 
Status
Not open for further replies.

Top