notadriver
Established Member
- Joined
- 1 Oct 2010
- Messages
- 3,734
? ? ? ?
I was once told by a train driver that use of more than step 2 (or approximately 50 percent of the maximum braking capacity) was not to be used during normal 'routine' braking.
? ? ? ?
Thats a hell of a junction margin !! Depends on the junction speed, distance between signals, double red protection, speed of the freight etc etc... its not as cut and dried as your example.
Does anyone know if the recommended 50 percent braking rule applies to high speed trains, or do they have to brake harder?
An extreme example for sure, but these are the kind of things that destroy capacity and make it difficult to path high speed trains.
Assuming the train was doing the booked Down Relief to Southall West Loop or vice versa to the Up Relief an Up train would be checked by YY at SN280 which is at the London end of Hayes & Harlington station platform.....An example would be a crossing move at Southall, the HST would probably get checked if it's left Slough.
An extreme example for sure, but these are the kind of things that destroy capacity and make it difficult to path high speed trains.
You've had a driving policy half explained to you.
The 3 Step brake is fitted to the 2nd generation multiple units. When introduced, drivers were taught to go straight into step 3 (full service), then progresssively ease back to step 1 as they came to a stand. It works by electrical circuits, so brake pipe pressures do not apply. Drivers are now taught to use step 2 for normal braking, and keep step 3 "in reserve", or in some companies only to use it briefly at higher speeds. It's a company policy, not a rule in the railway sense of the word.
HST's or Mk IV's are fitted with the 7 step brake, controlled by an E70 brake control unit. High speed braking is a case of "early and light" if you can. You start to brake for a station a couple of miles out, and aim to come in on one smooth application.
Thank you E&W Lucas but you say only half of the driving policy? Which bit is missing ?
You've had a driving policy half explained to you.
The 3 Step brake is fitted to the 2nd generation multiple units. When introduced, drivers were taught to go straight into step 3 (full service), then progresssively ease back to step 1 as they came to a stand. It works by electrical circuits, so brake pipe pressures do not apply. Drivers are now taught to use step 2 for normal braking, and keep step 3 "in reserve", or in some companies only to use it briefly at higher speeds. It's a company policy, not a rule in the railway sense of the word. [\QUOTE]
Not all companies teach 'step 2' braking. For Westcode brakes we were taught to base the braking on step 1 for tread brakes and step 2 for disc brakes, with adjustments as necessary.
Unless something has changed recently, there are no 110 mph sections on the Berks and Hants west of Castle Cary. The maximum linspeed between Castle Cary and Cogload Junction is 100 mph.110mph sections with 2 aspect signalling are Berks and Hants west of Castle Cary
Not all companies teach 'step 2' braking. For Westcode brakes we were taught to base the braking on step 1 for tread brakes and step 2 for disc brakes, with adjustments as necessary.
Does not do much for signal sighting though so any system would be plagued by that problem still.
Exactly - company instructions, reflecting the different characteristics the traction used, not the sort of rigid "rules" that the OP thought existed.
Quite so, but you know as well as I do freight doesn't tend to stick to timetables too well, and it's not always possible to keep things on the move.
As I said, it's an extreme example and raising train speeds when you have a very varied traffic mix destroys paths, as you know, which can mean less revenue, depending on how much additional revenue is attracted by cutting timings.
I once sat in a meeting where it was even suggested that some parts of a principal main line should be *lowered* to accommodate more trains. There are considerable areas, especially on the GWML east of Wotton Bassett junction and the WCML where pathing is very tricky simply because of the traffic mix and raising overall speed would make the situation worse
This is what I've argued many a time. High Speed works okay on segregated lines like HS1, but increasing the top speed on "existing" lines is a very short term move because you catch up with the slower train in front pretty quickly.
You can't overspeed now anyway; systems don't let you as far as I'm aware but with regard to your point....
There's never been an incident due to overspeeding. Drivers know what the train can do, just like the WCML, drivers of the Pendolinos agree they could easily do 135mph without any danger at all, the same was true in 1980's and early 90's, the infrastructure is capable and I don't buy the argument that drivers can't react fast enough on lines when they did it just fine in the past and managed to get trains in early when railwaymen were proud of getting trains in before time. It was pride in the job and didn't endanger anyone!
I might add 125mph isn't very fast anyway; when a train goes past at 125mph it doesn't exactly blow me away with how fast it is, it just sort of glides past. It may have seemed fast in the past but if you've ever done 125mph in a car (and I have on a circuit and more) it's a reasonable speed but not enough that you can't see what's happening if you're trained to do it everyday. The only argument I can see against overspeeding or officially being able to go faster than 125mph is pathing and traffic issues due to a intensively used railway but that's all. There's a lot of excuses now that weren't there before and business has taken over meaning every piece of acceleration costs becuase of diesel or electricity used which is a shame really. Like in sport, private enterprise and railways do not make for the best railway. I remember the days when I could travel on a Sunday by train!
The Lisbon to Porto pedolinoas do 135/137 on large sections of line but then theirs are a lot quieter in terms of traffic than ours but I'm not aware of any radio based signalling there, the same with the pendolinos in northern Italy; same story.
Never been an incident due to overspeeding? What about Maidstone East, Nuneaton or Morpeth?
Wasn't there one at or near Didcot as well once when a driver didn't realise until too late that he had been signalled onto a relief loop and he approached at full line speed?
I seem to recall that one of the well known railway personalities was actually on board and he realised what was about to happen moments before it did; was it O.S. Nock?