Never been an incident due to overspeeding? What about Maidstone East, Nuneaton or Morpeth?
Another for the list Eltham Well Hall.
Never been an incident due to overspeeding? What about Maidstone East, Nuneaton or Morpeth?
would any driver in his right mind ever even edge up to 130mph or is the culture and the chance of getting caught just too strict now?
The ECML should've been electrified in totality like the WCML.
Absolutely. I think the GWML could survive a while as it is if budgets are pressed. I hear the HST reliability is higher than it's ever been? Any electrification money should as said be spent infilling the ECML I think. I always never understood how the Skipton branch wasn't given sufficient power for 91's either; slight oversight?!!
Have any drivers been sacked for this? I was on a late running train doing 139/140mph (confirmed by GPS) from Scotland to London, for a section north of Peterborough, (under GNER) and if a driver was that sure he'd be caught - why would he have risked it?
This was on a Sunday evening for what it's worth, no idea how busy the line was - but our delay had been not far off leaving Edinburgh so it may have been pretty quiet later on (9-10pm approximately). With the recovery time, it probably arrived at King's Cross not very late at all.
Don't pay too much heed to GPS either. You get errors due to the devices re - triangulating themselves between satellites. Many cheaper devices do not allow for changes in height above sea level either, ie they shorten the distance that the train has actually covered.
I agree you get errors (blips) but I think on the whole they can give you a good idea of how fast you are going over a distance, especially the more expensive models.
Could a train doing 140 mph stop within the same distance that a train from 125 mph can? What about adverse rail conditions?
See my post way back on the first page of this thread for the answer to your question.
O L Leigh
There is a lot of very expensive technology in place to assist in the managing of drivers, who by and large are not the sort of people to play fast and loose with the safety of themselves and their passengers. It is not the job of enthusiasts to manage railway professionals, and please recognise that we will take a degree of offense when you appear to be trying to do so.
I have seen the fallacy of GPS demonstrated on a heritage line. An enthusiast claimed a speed attained, that the loco in question is physically incapable of achieving with that load in that location. Some further questions led to the information that I posted above. Unless you have access to the OTMR (black box) data for a particular journey, and the knowledge to interpret it, it is probably unwise to make accusations as to what has been happening.
Do you think I'm a railway enthusiast who goes around timing trains and making dubious comments? Please! And the OTMR is not the only way to determine the speed of a train.
A few questions, if I may be so bold, having read this extremely interesting thread:-
If my memory serves me right the HST and APT were developed at more or less the same time, the HST being designed for 125 mph (or it would seem 120mph initially) and the APT for 150mph. Was the APT equipped with in cab signalling and if not, was it the case that drivers having difficulty in sighting the signals was one of the reasons for it being abandoned?
It always seemed strange to me that it did a couple (?) of runs on the WCML in atrocious winter weather conditions, when it seems to acquit itself quite well considering, and was then shelved.
I can also recall from 20 or may be more years ago that a system of in cab signalling was introduced on part of the South Western main line out of Waterloo where the aspect of the previous signal was shown in the cab (ie an extension to AWS). Couldn't this solve the problem of 140mph running on the ECML?
More recently, wasn't the WCML upgrade intended to allow 140mph but was pegged back to 125mph on cost grounds? Was it the in cab signalling that proved too expensive and so was abandoned?
The OTMR (On Train Monitoring Recorder) must be fitted to all trains using Network rail lines (even steam locomotives) but AFAIK it doesn't send out a massive warning if the line speed is exceeded. Needs to be downloaded and looked at by a driver manager. They are obviously examined randomly anyway and most definitely in the case of an incident occuring. So unless the train or the driver had been involved in some sort of incident prior he could just have gotten away with it.