A local signal box to me closes at night but the line remains open. I always thought that the last signal of the box needed a release from the next box to be able to clear this signal. Is there a lever in the box that is used to close the box and release the last signal?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,756
Location
St Albans
Signal boxes that can be "switched out" can literally do just that. A large multipole switch is provided and a set procedure is followed to clear the box's signals and then the switch is operated to directly connect the block instruments in the boxes each side to each other. Thus the signals are left at 'clear' all night and there is therefore no need for a 'Line Clear' release to allow the 'starter' signal controlling access to the next section to be cleared.
 

Hooverguy

New Member
Joined
12 Nov 2010
Messages
4
Does this "multipole" switch release the locks on the last signals when operated? If not then there wouldn't be any way to clear the last signals in each direction.
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
When a box is 'switched out', it just becomes a collection of distant and stop signals that are permanently set to 'off', thus creating one long signal section between the previous signal box, and the following one.

Examples I have seen with the boxes both 'in' and 'out' are Pontrilas on the Central Wales line, Henley-in-Arden (not anymore) on the Stratford-upon-Avon line, and Arley on the Severn Valley Railway.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,835
Location
East Anglia
When a box is 'switched out', it just becomes a collection of distant and stop signals that are permanently set to 'off', thus creating one long signal section between the previous signal box, and the following one.

Examples I have seen with the boxes both 'in' and 'out' are Pontrilas on the Central Wales line, Henley-in-Arden (not anymore) on the Stratford-upon-Avon line, and Arley on the Severn Valley Railway.

Somerleyton Swing Bridge Box used to 'switch out' between 22.00-06.00 or whenever short staffed (much to the annoyance of river traffic). At these times ALL signals in both directions where cleared & the absolute block section then became Reedham Swing Bridge Box to Oulton Broad North Box.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Does this "multipole" switch release the locks on the last signals when operated? If not then there wouldn't be any way to clear the last signals in each direction.
A 'line clear' release and a single beat on the block bell is given by the 'boxes in advance in either direction (say A and C) in response to the 5-5-7 bell signal from B, to allow the latter to clear his signals right through in each direction. Once B has done this, a single beat is returned to both A and C, who both then acknowledge the 5-5-7 bell signal by repetition and return the block indicator to normal. B then turns his block switch 'out', and A and C proceed to check that through communication has been established.

Other than, I understand, some earlier WR installations (not sure whether any remain in this manner), the block switch certainly doesn't release any signals directly.
--- old post above --- --- new post below ---
Further to my earlier post, an example of a block switch (the only example, in the double line context referred to here, in preservation!) can be seen in the eleventh photo on this page (the first 'internal' photo) - the block switch is positioned between the two sets of block instruments.

Incidentally, in this case at least, although the block phone is connected through between Loughborough and Rothley when the block switch is turned 'out', it's still possible for Quorn to partake in any conversation. The block indicators and bells are taken out of circuit completely though.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Does this "multipole" switch release the locks on the last signals when operated? If not then there wouldn't be any way to clear the last signals in each direction.
The "Multipole" switch release you refer to is not a switch release.

The Block Switch merely serves to directly connect the block bells and the block indicator circuits between the signalboxes on each side.

Operating the BS will not of itself give any release to the electrical locking of the Section signal. If the Section signal was to be replaced to the On position with the BS in "Closed" then the Section signal would again become locked until a Line Clear Release was obtained.

The circuits for the Line Clear release require the adjoining signalbox to be open, the BS to be at "Open", and a Line Clear displayed on the Block Instrument.

There is a means of obtaining an illegal Line Clear Release of the Section signal but that shall not be divulged.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
It would be a massive, massive investment to resignal so much of the network, that's why- that's why we have such old technology still in use.

Why as many as 25 though- if you're going down that route, might as well concentrate control in even less locations, NATS style.

Though, going further, if were doing that full ERTMS ETCS level 2 roll out would be "better" than plain line side signalling, no?

But the anser is, mainly, money. RMT signallers would make some sort of safety-based argument in order to protect jobs (as, funnily enough, it is part of a union's role to fight job losses. This doesn't make them bad)
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Why not close 80% of all boxes and build 25 big IECC's... Saves a lot of money.
If it isn't broken, why fix it? In Cornwall the service is generally one train per hour and absolute block works well.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Indeed, where there's an intensive service over a complicated layout, a PSB or IECC could easily replace the workload a large number of 'boxes with a single workstation or two. Out in the rural areas, there's less cost savings to outweigh the investment. I'm sure it'll come eventually though.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
If it isn't broken, why fix it? In Cornwall the service is generally one train per hour and absolute block works well.

With so few trains, could Cornwall (including branches) not be controlled by one person? Quite possibly in Bristol? How many boxes are there in Cornwall?
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
With so few trains, could Cornwall (including branches) not be controlled by one person? Quite possibly in Bristol? How many boxes are there in Cornwall?
7 on the GWML with 2 on the Newquay branch. Saltash to St Germans inclusive is controlled by Plymouth PSB. To have one person controlling all of Cornwall would require a resignalling scheme with very little benefit.
 