• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Should Grand Central order the new Hitachi Trains?

Status
Not open for further replies.

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
Other than the pantograph well, do you know if there are any differences between the class 195 and class 331 bodyshells?
No difference. Physically identical above the solebar in every other way. That was the reason they were chosen by Arriva for ease of crew training and conversion.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

James90012

Member
Joined
21 Sep 2016
Messages
188
For fleet commonality on the East Coast, yes GC should order 80X. Going for something bespoke when almost every other intercity train is on the 80X platform seems odd when the line is only going to get busier and busier in the coming years.

With a new 125mph diesel-electric loco though, perhaps the MK5s offer a lower cost option (if the MK5s are indeed cleared for 125mph running!).
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,862
No difference. Physically identical above the solebar in every other way. That was the reason they were chosen by Arriva for ease of crew training and conversion.
Good - me trying to encourage energy efficiency here - so they (along with 196s and 197s) could in theroy (if the government would get it's act together on electrification) be sent (back) to Llanwern and stripped back to the bare bodyshells allowing the latter to be reused in new batches of EMUs (either with a pantograph well being cut into the roof on one coach or an extra vehicle with a pantograph well being built to lengthen the unit at the same time).

For fleet commonality on the East Coast, yes GC should order 80X. Going for something bespoke when almost every other intercity train is on the 80X platform seems odd when the line is only going to get busier and busier in the coming years.
Yes, if GC want bi-modes they should choose 80x. However, they should not order new 80x - there should be electrification elsewhere and cascades of existing bi-modes to GC. If they meerly want something approaching a like-for-like replacement for their current class 180s (due to poor reliability) then class 222s could be used if XC don't want/need them.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,403
Location
East coast of Yorkshire
Yes, the Durham Coast line is a way down the list but there are plenty of other places which aren't. For example, Hull could be fairly high up the list which would free up the Hull Trains 802s (and maybe some of TPE's 802s) for a cascade to Grand Central. Since GC has a larger fleet than Hull Trains, diesel gensets out of 801s could be used to make up the numbers.
by which time the 180s would have probably all fallen to pieces.

But what are likely timescales even for Hull electrification, TPE electrification progress is glacial, and I assume that this would need to be finished before any other schemes get the go ahead. Optimisticallly 15 years to switch on, probably nearer to 25. 180s will have been converted to razor blades or tin cans by that time, and 22x's will be end of life.

Would GC need the full 802 installed horsepower on diesel, I dont believe there is any running in excess of 70-75mph on any of the non electrified bits of their routes, so could they work with less gen sets?

GC being an open access operator will go with what ever provides the best business case, so unless there are changes to a new track access agreement which rule out diesel under wires nothing will change
 

Fisherman80

Member
Joined
29 Apr 2018
Messages
223
I wonder if Grand Central are looking at the soon to be withdrawn Mk5 stock as a medium term replacement for the 180s.
The Mks are 125mph coaches so you would need a 125mph diesel locomotive.
The only locomotive I can think of that is 125mph capable is the class 67.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
I wonder if Grand Central are looking at the soon to be withdrawn Mk5 stock as a medium term replacement for the 180s.
The Mks are 125mph coaches so you would need a 125mph diesel locomotive.
The only locomotive I can think of that is 125mph capable is the class 67.

They're looking at 221s, aren't they, with one already in service? Much more reliable. And reliable is what they need.
 

Fisherman80

Member
Joined
29 Apr 2018
Messages
223
They're looking at 221s, aren't they, with one already in service? Much more reliable. And reliable is what they need.
Your right about the reliability of the 221s. If Grand Central do indeed replace the 180s with 221s then hopefully they will do a massive marketing campaign with rock bottom prices because their reputation has hit rock bottom this year.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,278
Just to be clear, electrification to Hull wouldn’t release the 802 sets. The need to have full diesel capability on all HT diversionary routes rules out going full electric.

LHCS for GC would be too slow. They really need to get into 22x or 80x levels of acceleration for class 1 paths on the ECML.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,902
If Grand Central do indeed replace the 180s with 221s then hopefully they will do a massive marketing campaign with rock bottom prices because their reputation has hit rock bottom this year.
I'm not totally convinced they need to do much. Every GC I've been on over the last 6 months has been very well loaded between York/Doncaster and London.

The vast majority of passengers will just choose the time/price that suits from a journey planner and not care who they're traveling with.
 

Fisherman80

Member
Joined
29 Apr 2018
Messages
223
I cannot comment on the routes you mention,but I know the Bradford end of the route has been absolutely shocking.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
As has been mentioned in the Class 221 for Grand Central thread https://www.railforums.co.uk/threads/class-221-for-grand-central.249024/, the class 221 unit is only hired 12 months. It does not mean to say that GC are looking to totally replace their class 180 fleet with class 221 units or are not thinking about obtaining new stock. But even if GC ordered new stock today of an existing train unit in production, it possibly would be 2025 before production could begin depending on what the manufacturer is currently building from prior requests.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,906
Location
East Anglia
Your right about the reliability of the 221s. If Grand Central do indeed replace the 180s with 221s then hopefully they will do a massive marketing campaign with rock bottom prices because their reputation has hit rock bottom this year.

Don’t hold your breath. Loadings seem healthy from what I have seen. People still need to travel even those that have a hissy fit on X saying they’ll never travel with GC again.
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
Don’t hold your breath. Loadings seem healthy from what I have seen. People still need to travel even those that have a hissy fit on X saying they’ll never travel with GC again.
Yes, people have short memories when they see the cheaper priced tickets.
 

gc4946

Member
Joined
17 Jul 2019
Messages
368
Location
Leeds
The only way Grand Central could receive Hitachi trains would be by tagging onto a larger order and getting another 5 to 10 year track access agreement to justify investment.
If GC want replacements sooner for their 180s they could obtain some of the Transpennine Express Mk5s expected to be coming off lease at the end of this year, plus 68s, however unsure if the 88s or 93s can cope running off the wires
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
The only way Grand Central could receive Hitachi trains would be by tagging onto a larger order and getting another 5 to 10 year track access agreement to justify investment.
It doesn't need to be a tag on order. If it's standard 802s (even derated to 750hp) they can easily do a small order, the same way that Siemens will be happy to offer an off-the-shelf Vectron for a good price and lead time.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,403
Location
East coast of Yorkshire
If GC want replacements sooner for their 180s they could obtain some of the Transpennine Express Mk5s expected to be coming off lease at the end of this year, plus 68s
100mph running on the ECML wont work, given they run non stop to Doncaster or York they will need 125mph, I think even 110mph wouldnt work.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,862
Just to be clear, electrification to Hull wouldn’t release the 802 sets. The need to have full diesel capability on all HT diversionary routes rules out going full electric.
Do Hull Trains really need diversionary capability? Aren't Hull Trains and Lumo both First Group owned? If so, they don't appear to mind not having diversionary capability at Lumo, so presumably the diversionary capability at Hull Trains is just a helpful side effect to them having bi-modes anyway due to the last bit still waiting for wires.

LHCS for GC would be too slow. They really need to get into 22x or 80x levels of acceleration for class 1 paths on the ECML.
LHCS already runs on the ECML in the form of LNER's IC225 sets (although they are sadly now confined to services south of Leeds/York, but I understand this was due to avoiding having to keep doing traction refreshers for Scottish crews rather than LHCS being slower - with a shorter rake they probably wouldn't even be noticably slower).
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,902
It doesn't need to be a tag on order. If it's standard 802s (even derated to 750hp) they can easily do a small order, the same way that Siemens will be happy to offer an off-the-shelf Vectron for a good price and lead time.
From what @Clarence Yard has said the price of 80x has risen so much it's likely there won't be any further orders. With that in mind a small order is likely to simply be unaffordable, given smaller orders tend to cost more per unit too.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
It doesn't need to be a tag on order. If it's standard 802s (even derated to 750hp) they can easily do a small order, the same way that Siemens will be happy to offer an off-the-shelf Vectron for a good price and lead time.
80x production is very different to Vectron production. We’re now at the back end of 80x orders with little prospect of more substantial orders. In contrast, Siemens has a big order book for Vectrons which guarantees production for several years. GC ordering 80x is a completely different scenario to a small Vectron order.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,278
Do Hull Trains really need diversionary capability? Aren't Hull Trains and Lumo both First Group owned? If so, they don't appear to mind not having diversionary capability at Lumo, so presumably the diversionary capability at Hull Trains is just a helpful side effect to them having bi-modes anyway due to the last bit still waiting for wires.

LHCS already runs on the ECML in the form of LNER's IC225 sets (although they are sadly now confined to services south of Leeds/York, but I understand this was due to avoiding having to keep doing traction refreshers for Scottish crews rather than LHCS being slower - with a shorter rake they probably wouldn't even be noticably slower).

No, diversionary capability is a fundamental part of the Hull Trains business plan, always has been. It’s not a side effect and is quite deliberate, I can assure you of that. Hull doesn’t get Type 1 and 2 Schedule 4 money so it needs to divert when there is engineering work and it also helps when you have those all too frequent wires down incidents on the ECML. Being able to go via the GN/GE Joint line (or via Goole) is fairly fundamental.

Lumo was not developed by the same team at FG and has a different business model. If I had been involved, they would have had full diesel capability.

The class 91 situation is a world away from class whatever and mark v’s. If you can’t meet 22x/80x timings, you won’t easily run your services - you need to fit on the ECML, not get the ECML to fit around you. That was one of the reasons HT went for 80x - they needed to be able to match the LNER 80x units, especially with an ECML recast on the cards.

With interest rates starting to fall, it remains to be seen if Hitachi unit prices get competitive. We in the industry will shortly find out if they are starting to move towards acceptable levels.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
Lest we forget that on top of diversionary capability 2 x HT services per day go to/from Beverley and the chances of electrification up the Wolds Coast are very low.
 
Joined
3 May 2023
Messages
528
Location
Too far from an HST...
As has been mentioned in the Class 221 for Grand Central thread https://www.railforums.co.uk/threads/class-221-for-grand-central.249024/, the class 221 unit is only hired 12 months. It does not mean to say that GC are looking to totally replace their class 180 fleet with class 221 units or are not thinking about obtaining new stock. But even if GC ordered new stock today of an existing train unit in production, it possibly would be 2025 before production could begin depending on what the manufacturer is currently building from prior requests.
We don't know this for definite, two people who have connections stated 10 would be coming over with a "soft touch" refurb...so make of that what you will
 

hdennis13

Member
Joined
1 Nov 2023
Messages
49
Location
Cambridge
As LNER have ordered CAF tri modes, it I possible that GC would also? Or XC? Would batteries be sufficient for non wired sections?

As the 221s are being refurbished for probable use by GC and XC, I suspect this is unlikely.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,906
Location
East Anglia
As LNER have ordered CAF tri modes, it I possible that GC would also? Or XC? Would batteries be sufficient for non wired sections?

As the 221s are being refurbished for probable use by GC and XC, I suspect this is unlikely.
Batteries would probably not be great for the length of off wire on their routes. They would however be perfect for diesel operation here then battery mode in and around stations and also whilst idling.
 

cslusarc

Member
Joined
27 Jan 2011
Messages
167
I would like to see some of GWR's 5-car class 802/0s cascade to GC when more electrification to Oxford, Swansea and Taunton (via both Bristol and Bedwyn) is completed in the Western Region.
 

TheWalrus

Established Member
Joined
6 Oct 2008
Messages
2,070
Location
UK
Can’t see wires going West of Newbury to be honest, I don’t think it’s worth it unless there’s enough freight and passenger services combined to justify it.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
I would like to see some of GWR's 5-car class 802/0s cascade to GC when more electrification to Oxford, Swansea and Taunton (via both Bristol and Bedwyn) is completed in the Western Region.
Id like to see them cascaded to GWRs own Portsmouth to Cardiff route rather than an open access operator operating revenue abstraction services on the ECML.
 
Status
Not open for further replies.

Top