Glenn1969
Established Member
I believe at least Grindleford, Hathersage, Hope and Bamford (and stations nearer Manchester) are on the list for platform lengthening this year ?
I believe at least Grindleford, Hathersage, Hope and Bamford (and stations nearer Manchester) are on the list for platform lengthening this year ?
Source would be helpful as it's not been heard in the valley. Maximum length of trains currently stopping in the Hope Valley is 4. East Midlands provide the first westbound and last eastbound services. As far as I know only Hathersage westbound is too short and I've not heard of plans to extend it.I believe at least Grindleford, Hathersage, Hope and Bamford (and stations nearer Manchester) are on the list for platform lengthening this year ?
The operational part of the platform at Grindleford on the Down is too short for 4x23m vehicles, Bamford's very tight if the signal's at danger, Hope's tight on the Up, and there's no chance at Hathersage in either direction.Source would be helpful as it's not been heard in the valley. Maximum length of trains currently stopping in the Hope Valley is 4. East Midlands provide the first westbound and last eastbound services. As far as I know only Hathersage westbound is too short and I've not heard of plans to extend it.
Dore & Totley does see 6 coach trains but will not be lengthened to take them before 2021/2 as part of the Hope Valley Capacity Improvement Scheme - a subject that causes TPE services to dwell for 2 minutes instead of the timetabled 1 as passengers have to access carriages 5 and 6 from carriage 4.
Is there any other platform available at that time? There seems to be an enormous reluctance to use anything other than the booked platform unless absolutely necessary, even if the opposite platform on the same island (so an easy alteration for passengers) is available.From my experience from travelling to/from Sheffield, most of the time, I tend to be most delayed on the Leeds - Nottingham via Barnsley NT service. Often waiting for a path at Meadowhall to cross over and then again waiting outside of Sheffield for a platform.
Booked in at XX:05 but usually delayed by a few minutes. This then delays the XX:11 TPE service to Manchester Airport as both the Nottingham and Manchester Airport services usually leave from platform 6A.
Is there any other platform available at that time? There seems to be an enormous reluctance to use anything other than the booked platform unless absolutely necessary, even if the opposite platform on the same island (so an easy alteration for passengers) is available.
Going to suggest something a little bit left-field:
Rebuild Rotherham Masborough as an option if Sheffield becomes too crowded?
Don't expect these to be achieved. They've been planning redoubling through Dore since before 2005. That might happen to latest timetable but 2023 is possibly more realistic?
Just to stir things up, it certainly winds us up in Sheffield when 'the' Transpennine link features in TfN and Network Rail's presentations and spending priorities
No chance of re-using Woodhead then?
I believe at least Grindleford, Hathersage, Hope and Bamford (and stations nearer Manchester) are on the list for platform lengthening this year ?
The operational part of the platform at Grindleford on the Down is too short for 4x23m vehicles, Bamford's very tight if the signal's at danger, Hope's tight on the Up, and there's no chance at Hathersage in either direction.

The delays in & out of Sheffield from the south aren't usually huge 5 or 6 minutes usually, into Leeds yes occasionally waiting platforms but usually the north bound XC gets a good run into Leeds.XC trains have a lot of padding in the timetable, which could explain some of your 'delays,' especially approaching Doncaster.
Sheffield station does need sorting out though. Often slow heading in on the Northern stoppers. Ideally there should be a way to route freight around the station too, as that seems to cause a few issues too.
You are also dreaming if you think these problems don't happen at Leeds. The Sheffield-Leeds Northern services all get stuck outside Leeds waiting for a path in or a platform.
The delays in & out of Sheffield from the south aren't usually huge 5 or 6 minutes usually, into Leeds yes occasionally waiting platforms but usually the north bound XC gets a good run into Leeds.
If you look on RTT over a week for various northbound services, most of the time on time at Chesterfield then the delays start at Dore.
Having made a big error on the 1st February and caught the 1.14 for Dore I was reminded it skips that stop when it failed to slow down!! I thus had time to kill at Grindleford Station cafe before waiting for the next train back - which was late.
I know those through lines are used for stabling, but it's still an inefficient use of space which is at a premium. If you were building the station from scratch today on the same footprint you wouldn't design it that way. Instead you'd use that space for an extra island giving two more full-length platforms.Is a station not built to serve the city though rather than the conveniences of the railway? Having to get a 30 minute bus, then change onto a tram, all at some expense, just to get to the station would not prove popular and would severely limit HS2s share of the market!
Those through lines are used primarily for stabling stock overnight and on Sundays. However, I don’t generally find Sheffield runs out of platform space, the delays at the station almost always attribute to congestion at both throats where it narrows to two tracks more quickly than almost any other major station. Also, both Dore and Meadowhall junctions slow things down, almost every time I catch a train at Dore I’ll see one grind to a halt at the MML signal there...often an XC train too.
Agreed. I’d have thought an easy fix would be to stick a bay (or two if room) in the north end of the platform 6/8 island so platforms 1, 2, 5, 6 and 8 can be left to through trains and London trains. Don’t know why this hasn’t been done already given the lack of space in 3/4.I know those through lines are used for stabling, but it's still an inefficient use of space which is at a premium. If you were building the station from scratch today on the same footprint you wouldn't design it that way. Instead you'd use that space for an extra island giving two more full-length platforms.