Severn tunnel drainage

Status
Not open for further replies.

linuxlad7

Member
Joined
9 Nov 2017
Messages
132
Did my failing eyes deceive me or did Noel Dolphin report (on twitter) that they've usfully improved the drainage in the tunnel and are ready to roll???
(as usual with his threads, (I cant find it now! but I think its starts 'Ssssshhh))
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DidcotDickie

Member
Joined
12 Mar 2017
Messages
160
Location
Oxfordshire

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,170
Reported elsewhere that Network Rail need a possession to remove the balises at either end before class 80x can traverse the tunnel on electric (presumably the balises instruct the 80x to lower pantographs and switch to diesel at the tunnel entrance).

No way for drivers to override those?
 

linuxlad7

Member
Joined
9 Nov 2017
Messages
132
The Severn Tunnel is already live. See the GW Electrification thread: https://www.railforums.co.uk/threads/great-western-electrification-progress.83452/post-4547110

Reported elsewhere that Network Rail need a possession to remove the balises at either end before class 80x can traverse the tunnel on electric (presumably the balises instruct the 80x to lower pantographs and switch to diesel at the tunnel entrance).
thats the one - ta. must get down to Pilning
 
Last edited:

DidcotDickie

Member
Joined
12 Mar 2017
Messages
160
Location
Oxfordshire
No way for drivers to override those?
I doubt if they can in regular service. Also a report from a GWR driver/manager elsewhere implies that an 80x has already traversed the tunnel on electric (presumably on test) so it appears that there is a way round it in special circumstances.
 

linuxlad7

Member
Joined
9 Nov 2017
Messages
132
I doubt if they can in regular service. Also a report from a GWR driver/manager elsewhere implies that an 80x has already traversed the tunnel on electric (presumably on test) so it appears that there is a way round it in special circumstances.
What locos are in line to work this route though the tunnel, for freight especially
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,627
Location
Nottingham
Why so, when Class 88s have been designed for just such work.
Class 88 is fine if it's (pretty literally) the last mile that isn't electrified. The range and maximum speed on diesel are very low, so it's probably not adequate if electrification is missing for five or ten miles.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,170
Class 88 is fine if it's (pretty literally) the last mile that isn't electrified. The range and maximum speed on diesel are very low, so it's probably not adequate if electrification is missing for five or ten miles.

Class 93s might have been suitable if an order had actually been placed, but that's getting off topic (and very speculative).
 

linuxlad7

Member
Joined
9 Nov 2017
Messages
132
Class 93s might have been suitable if an order had actually been placed, but that's getting off topic (and very speculative).
meanwhile how do I get Welsh steel up to Brum, or even up to Burnaston
 
Last edited:

John R

Established Member
Joined
1 Jul 2013
Messages
6,098
meanwhile how do I get welsh steel up to Brum, or even up to Burnaston
There are two routes up to the Midlands via Hereford and Lydney that don't require use of the tunnel, even before considering the point that the majority of whichever route is taken is currently not electrified.
 

linuxlad7

Member
Joined
9 Nov 2017
Messages
132
Burnaston has the minor problem of no rail terminal, although one has been talked about. Does any steel for Toyota go by rail to a terminal nearby?
Willington has/had a station... failing that the A38 goes by the door, or (mixed-mode), -the Trent and Mersey. Or (as we've discussed many times) repower the Lickey
 