I watched one of Railmarts YouTube cab rides from Acton Yard to St Pancreas stone terminal. I was amazed to see so many manual signalboxes, semaphores and bullhead rails so near central london.You’ve still got quite a few to choose from, with these lines being at least part signalled by semaphores:
- Settle to Carlisle Line.
- Harrogate Loop.
- Newcastle to Carlisle.
- Carlisle to Glasgow (via Dumfries) I believe.
- Llandudno Junction to Blaenau Ffestiniog I believe.
- Holyhead to Chester.
- Esk Valley Line.
- Cumbrian Coast.
- Hull to Scarborough may still have a few semaphores left.
- Sheffield to Cleethorpes via Brigg.
Is there any mainlines or branch lines that still use semaphore signalling or is it all controlled by lights these days.
Add on Ayr to Stranraer, north of Dunblane to Inverness via both Aviemore and Dundee/Aberdeen (but excluding both cities) and if you want semaphores under OHLE, the Grangemouth branch.
Only operational semaphore distant in Scotland is at Glenwhilly, which I believe is motor-operated. Carrbridge has been colour light since 1979! Correct re the co-actor at Greenloaning. Very little Tokenless Block and Tablet/Token left as well.Pitlochry and Aviemore are now colour lights along with carrbridge.
I believe greenloaning between dunblane and gleneagles has the last co-acting semaphore signal in Scotland, easily seen from the road bridge, I can’t think of any manual distant signals in scotland, not sure if there are any left unfortunately.
Cupar to leuchars is semaphore. Carnoustie, Arbroath, montrose (1 i think) Inverkeilor, Laurencekirk, craigo, Carmont and Stonehaven all semaphores. Newtonhill box is now abolished and under control of Aberdeen SC I believe.
Out of interest, how old are the semaphores on these lines?
And how much does it generally cost to run them vs centralised control, I'd presume they have to be more frequent?
True, but a lot of it is becoming life expired. Even colour light areas.But, if it’s not broke why change it? Increased service levels which often drive Resignalling schemes aren’t happening now so there’s no current requirement to push many schemes forward.
Out of interest, how old are the semaphores on these lines?
And how much does it generally cost to run them vs centralised control, I'd presume they have to be more frequent?
Modern colour light signalling with axle counters are generally cheaper over the life of the assets than retaining mechanical signalling.
Generally mechanical signalling area which are Resignalling go into go into signalling centres, often plugged onto existing panels.
Thankfully at least round here displaced staff have moved to other locations, so the staff costs are minimal if at all.
But, if it’s not broke why change it? Increased service levels which often drive Resignalling schemes aren’t happening now so there’s no current requirement to push many schemes forward.
Are ALL semaphores manually controlled (IE a human in a signal box)?
The reason i asked is in a recent conversation I had with a neighbour, he suggested some are actually controlled centrally (similar to lights) using motors to actuate the arms. He claimed, the only reason they were not changed to lights was due to sighting and other reasons, where to change to lights would require surveys, and other works not justifying the cost in some places?
In 2005, I had an interesting conversation with the signaller at Eccles Road, on the Ely to Norwich line. He said that signallers' salaries were by far the biggest cost - equipment maintenance was largely 'patch and mend' where necessary. On that line, 40 signallers were required to cover the 9 boxes. At an average of £25K each, annual salary costs were £1 million. Network Rail had estimated the cost of resignalling at £150 million, so in terms of cost savings the scheme was going to take a long time to pay for itself! Of course, the modular signalling eventually installed in 2012 might have worked out cheaper - it was certainly meant to be.Out of interest, how old are the semaphores on these lines?
And how much does it generally cost to run them vs centralised control, I'd presume they have to be more frequent?
Its more than £25K if you start including pensions etc.. then you factor in delay minutes saved for less failures and so on. It isn't as cut and dried as just the salary.In 2005, I had an interesting conversation with the signaller at Eccles Road, on the Ely to Norwich line. He said that signallers' salaries were by far the biggest cost - equipment maintenance was largely 'patch and mend' where necessary. On that line, 40 signallers were required to cover the 9 boxes. At an average of £25K each, annual salary costs were £1 million. Network Rail had estimated the cost of resignalling at £150 million, so in terms of cost savings the scheme was going to take a long time to pay for itself! Of course, the modular signalling eventually installed in 2012 might have worked out cheaper - it was certainly meant to be.
Its more than £25K if you start including pensions etc.. then you factor in delay minutes saved for less failures and so on. It isn't as cut and dried as just the salary.
Yes, but that occurred after, when you are proposing a scheme you would normally assume a slightly better implementation!Albeit the Norwich to Ely line will have put significant holes in the business case with the number of total failures and problems that occurred
The OD crossings didn't work well, there were several inherent problems with the design and implementation and so on (every time you put a train inside at Eccles Road you have to caution the next trains on the main lines to remove aspect restrictions, unless they've finally fixed that).
That is on top of the other issues like level crossing workload causing a number of unpleasant incidents.
All in all I think the success of that particular scheme could be called mixed.
How many lower quadrant are still in use .
How many lower quadrant are still in use .
How many lower quadrant are still in use .
Worcester, Shrewsbury, Moreton-in-Marsh, quite a lot on the Welsh Marches line, although intermixed with some upper quadrants as well.Still quite a lot in West country on mainline down to Penzance.