• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Selhurst Depot

Status
Not open for further replies.

markwo15

Member
Joined
21 Mar 2012
Messages
15
Lots of work going on to re-instate sidings, anybody have any details of why, what for etc?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,274
Lots of work going on to re-instate sidings, anybody have any details of why, what for etc?

Additional and longer trains are on order, the 377/6s (5 car) I'd suggest. Also, there's all those 377/5s to come back from Thameslink in the future, currently stabled at Bedford etc...

(The upcoming franchise merger won't affect any of this, space will still be needed.)
 

pendolino

Member
Joined
22 Nov 2010
Messages
737
Lots of work going on to re-instate sidings, anybody have any details of why, what for etc?

These are what are known as the 'forest' sidings, being reinstated for the new rolling stock on order. We shall have to come up with a new name now that they're now longer...er...forest.
 

Smudger105e

Member
Joined
5 Jan 2010
Messages
1,012
Location
N 52° 53.492 W 001° 15.493
Traditionally sidingd retain names that they were given years ago, so the New sidings at Toton have been there about 25 years, and the Steam Shed at Stewarts Lane was neither a shed (the roof was removed in the 1960s) or for steam engines any more!!
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Additional and longer trains are on order, the 377/6s (5 car) I'd suggest. Also, there's all those 377/5s to come back from Thameslink in the future, currently stabled at Bedford etc...

(The upcoming franchise merger won't affect any of this, space will still be needed.)

Correct, the Forest sidings are coming back into use for the 377/6 fleet. As for the /5 fleet, they are likely to be accommodated by in part the 456 leaving in addition to the stabling capacity changes planned for Southern/Thameslink franchise as part if the TLP.
 

Old-School

Member
Joined
19 Aug 2012
Messages
18
Location
Surrey
The works on re-opening the sidings at Selhurst Depot

New sidings at Selhurst are driven by construction works at London Bridge, where
the bay platforms are being remodelled and Southern trains lose the ability to hold trains
overnight. The site that has been identified as a substitute for London Bridge is the disused Selhurst Field Sidings.
 
Status
Not open for further replies.

Top