So pardon my ignorance, what is the next bit that will logically get energized - to Larbert possibly?
Good news BTW
Good news BTW
So pardon my ignorance, what is the next bit that will logically get energized - to Larbert possibly?
Good news BTW
It could be for signal sighting; or it could be due to a physical obstruction where the STC would normally go.When I last came down the M9 across the tracks, there were some gaps but these have now been filled in by TTCs. Why do they have to use these? Is it just that ground on one side wouldn't support a pile?
No sign of any small components, let alone wire.
Didnt realise there will be a local service .Wonder if its from High Level or Low level?I think Altnabreac’s suggestion was a new local service terminating at Shotts, so could be 318/320s?
Didnt realise there will be a local service .Wonder if its from High Level or Low level?
What fastest end to end journey time do people think could realistically be achieved on the Shotts line:-
1. After electrification?
2. After electrification and the introduction of new local services at both ends of the line allowing the semi fast services to stop less frequently?
After investing £160m in the line I expect the Scottish Govt will want to see an increase in frequency as well as journey time improvements.
Page 152 indicates that in the long term there’ll be demand for an additional 1tph Shotts-Glasgow service via the low level line, terminating at Central:
https://cdn.networkrail.co.uk/wp-content/uploads/2016/11/Scotland-Route-Study-Appendices.pdf
Curious. I distinctly remember Transport Scotland people talking about a new turnback being needed for extra trains to terminate at Central LL from the east.
If you mean the 2Vxx Dumbarton - Cumbernauld and vice versa service then no, it will be cut back to terminate at Springburn again as it used to.I am assuming that the Cumbernauld extension of the LL trains to Springburn will continue?
I don't think there ever was. The limited speed of the LL trains would be incompatible with the 100mph mainline trains.
I am assuming that the Cumbernauld extension of the LL trains to Springburn will continue?
Curious. I distinctly remember Transport Scotland people talking about a new turnback being needed for extra trains to terminate at Central LL from the east.
The thing that's always been said is that the foundations of the Radisson Blu get in the way, but that's never really made sense to me (the line runs directly under Argyle St, so the hotel is on the opposite side of the extant lines to the unused platforms); more plausible is the building opposite it (the one that contains the The Sir John Moore 'spoons among other things). That all said, an east-facing bay might not be impossible.Any prospect of the other 2 low level platforms at Central being brought back into service? This would fulfill the new turnback requirement.
I'm quite sure if this could be done easily it would have been done long by now. I heard rumours a while back that some "substantial civil engineering" (= expensive!) was required so wouldn't happen.
I and many others selfishly hope it's East Kilbride. I don't understand why Shotts was done first - operational reasons have been suggested but the usage figures on EK are far higher, it would appear the customers did not come first in this decision. In terms of stock, I believe 385s are planned but, being a relatively short commuter line, any Scotrail EMUs (or similar, cascaded) would do. A bit concerning to read up thread that the proposal and business case aren't even in the system yet. Hopefully they're in someone's desk drawer ready to be put in the post!Which is important as most people will still go Queen St - Edinburgh . Though if theres a decent connection i use the Shotts fast service .
I wonder what line will get wires next , Maryhill line ,, EK ...
You have consider stock too .
The thing that's always been said is that the foundations of the Radisson Blu get in the way, but that's never really made sense to me (the line runs directly under Argyle St, so the hotel is on the opposite side of the extant lines to the unused platforms); more plausible is the building opposite it (the one that contains the The Sir John Moore 'spoons among other things). That all said, an east-facing bay might not be impossible.
I don't understand why Shotts was done first
I and many others selfishly hope it's East Kilbride. I don't understand why Shotts was done first - operational reasons have been suggested but the usage figures on EK are far higher, it would appear the customers did not come first in this decision. In terms of stock, I believe 385s are planned but, being a relatively short commuter line, any Scotrail EMUs (or similar, cascaded) would do. A bit concerning to read up thread that the proposal and business case aren't even in the system yet. Hopefully they're in someone's desk drawer ready to be put in the post!