So pardon my ignorance, what is the next bit that will logically get energized - to Larbert possibly?

Good news BTW
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
When I last came down the M9 across the tracks, there were some gaps but these have now been filled in by TTCs. Why do they have to use these? Is it just that ground on one side wouldn't support a pile?

No sign of any small components, let alone wire.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,854
Location
Beeston (Notts)
When I last came down the M9 across the tracks, there were some gaps but these have now been filled in by TTCs. Why do they have to use these? Is it just that ground on one side wouldn't support a pile?

No sign of any small components, let alone wire.
It could be for signal sighting; or it could be due to a physical obstruction where the STC would normally go.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,248
I think Altnabreac’s suggestion was a new local service terminating at Shotts, so could be 318/320s?
Didnt realise there will be a local service .Wonder if its from High Level or Low level?
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Didnt realise there will be a local service .Wonder if its from High Level or Low level?

I think you confuse me for a Scotrail timetable planner or official at Transport Scotland! No confirmation of any extra services yet. One suggestion though that I had heard mention of was to extend a Low Level service out to Shotts, picking up the calls at Holytown, Carfin, Cleland and Hartwood.

This would then allow the 2tph from High Level to both be semi fast services, albeit slightly slower at the east end as they would still need to cover the calls at the West Lothian and Edinburgh smaller stations.

Another possibility is to extend the Hamilton circle service that currently terminates in Motherwell at xx12 to give a regular Hamilton - Motherwell - Edinburgh service via Shotts. Will be interesting to see what if anything they decide to do with the Shotts line.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
What fastest end to end journey time do people think could realistically be achieved on the Shotts line:-

1. After electrification?
2. After electrification and the introduction of new local services at both ends of the line allowing the semi fast services to stop less frequently?

After investing £160m in the line I expect the Scottish Govt will want to see an increase in frequency as well as journey time improvements.
 
Last edited:

47271

Established Member
Joined
28 Apr 2015
Messages
2,983
This is all great. It's just a shame that there are no trains to run on the electrified lines!

I'm joking obviously, it is good to see one part of EGIP and its spinoffs going so well now.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,248
What fastest end to end journey time do people think could realistically be achieved on the Shotts line:-

1. After electrification?
2. After electrification and the introduction of new local services at both ends of the line allowing the semi fast services to stop less frequently?

After investing £160m in the line I expect the Scottish Govt will want to see an increase in frequency as well as journey time improvements.

Which is important as most people will still go Queen St - Edinburgh . Though if theres a decent connection i use the Shotts fast service .

I wonder what line will get wires next , Maryhill line ,, EK ...
You have consider stock too .
 

Stopper

Member
Joined
11 Nov 2017
Messages
670
Will be interesting to see if there is some low level services terminated at Shotts. Possibly the Milngavie-Motherwell via Hamilton or the Dalmuir-Whifflet via Carmyle. Picking up stops at Hartwood, Cleland, Carfin and Holytown as mentioned above.

That would allow both Shotts line services to run fast Shotts-Bellshill. Would obviously still be a fairly slow service with all the Edinburgh and West Lothian calls in there though.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
My daughter was on the 17.18 'peak time' train yesterday. Very quiet after the first few stops. Traffic will have to grow a lot before extras are needed.
 

Stopper

Member
Joined
11 Nov 2017
Messages
670
The Shotts trains never look that busy at peak times when I see them at Haymarket. Quite often it’s just a single 156 and it never seems to have anyone standing.

The Shotts service doesn’t exactly serve many big places. A faster half-hourly service might entice some more passengers away from Livi North to Livi South, but other than Bellshill (which has the Lanark services towards Glasgow also), it’s not really serving much other than some small West Lothian & North Lanarkshire towns, aswell as some little-used Edinburgh suburbs.

It will probably just remain the same 2tph (fast, slow) service with quicker journey times.
 
Last edited:

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
It could pick up more end to end traffic if it had a 2tph service with sub 60 min journey time.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Just to expand on my previous post, once you get the journey time below 60 mins Edinburgh-bound passengers travelling via Central have less incentive to walk over to Queen Street. And it benefits commuters coming the other way too due to Central’s proximity to the IFSD where tens of thousands of jobs and most of Glasgow’s blue chip employers are based. Central is around 7-8 minutes closer to the IFSD than Queen Street is in terms of walking time. The IFSD is also where most of the future city centre jobs growth will happen, with plenty of gap sites and numerous major office proposals in the pipeline.
 

Stopper

Member
Joined
11 Nov 2017
Messages
670
The current semi-fast is around 67-68 minutes I believe? That should improve when the 385s arrive.

A big problem with usage on the line is that there isn’t a lot of big commuter towns on the line. For example, Livingston South is the secondary station in Livingston. Bellshill and Uddingston also both have the option of a possible 6-car 320 with quicker journey times rather than a 2-car 156.

The line via Falkirk has massively busy commuter stations such as Linlithgow, Polmont, Falkirk High and Croy. The A-B line has Livi North, Bathgate, Airdie and Coatbridge. There’s not a lot to offer other than improving end-to-end journey times to give Central passengers a regular fast Edinburgh service.
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
Page 152 indicates that in the long term there’ll be demand for an additional 1tph Shotts-Glasgow service via the low level line, terminating at Central:

https://cdn.networkrail.co.uk/wp-content/uploads/2016/11/Scotland-Route-Study-Appendices.pdf

I am aware of a siding at Exhibition Centre station that is used for Anderston starters/terminators. If it would be possible to squeeze in a platform, the trains could be extended to run to and from Exhibition Centre.

There is an elevated section of roadway that is part of the Clydeside Expressway near to the siding, therefore it may not be possible to squeeze in a platform there.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
Curious. I distinctly remember Transport Scotland people talking about a new turnback being needed for extra trains to terminate at Central LL from the east.
 

Hackneyite

Member
Joined
14 May 2013
Messages
41
Am I right in deducing that there is no longer-if there ever was- any notion of integrating Edinburgh- Falkirk Grahamston-Cumbernauld into the Glasgow suburban network?
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
I don't think there ever was. The limited speed of the LL trains would be incompatible with the 100mph mainline trains.
I am assuming that the Cumbernauld extension of the LL trains to Springburn will continue?
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
Curious. I distinctly remember Transport Scotland people talking about a new turnback being needed for extra trains to terminate at Central LL from the east.

Any prospect of the other 2 low level platforms at Central being brought back into service? This would fulfill the new turnback requirement.
I'm quite sure if this could be done easily it would have been done long by now. I heard rumours a while back that some "substantial civil engineering" (= expensive!) was required so wouldn't happen.
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
I am assuming that the Cumbernauld extension of the LL trains to Springburn will continue?
If you mean the 2Vxx Dumbarton - Cumbernauld and vice versa service then no, it will be cut back to terminate at Springburn again as it used to.
 

Stopper

Member
Joined
11 Nov 2017
Messages
670
I don't think there ever was. The limited speed of the LL trains would be incompatible with the 100mph mainline trains.
I am assuming that the Cumbernauld extension of the LL trains to Springburn will continue?

No but I believe the Argyle line services via Whifflet will remain.
 

gordonjahn

Member
Joined
23 Oct 2010
Messages
146
Curious. I distinctly remember Transport Scotland people talking about a new turnback being needed for extra trains to terminate at Central LL from the east.

Maybe confusing this with the turn back at Finnieston / Kelvinhaugh to reverse trains through Queen St LL from the East (so they aren't hitting the busy section through Patrick and Hyndland)?

At the moment everything through QST LL has to go through Patrick but when there was chat about Crossrail and building the High St chord, the idea was to bring services from (I assume Paisley Canal / Ayrshire / Inverclyde / somewhere?!?) across the city and union and terminate at Queen St LL or Charing Cross using the turn back. This would presumably save on platform space at Central and people looking for cross-Glasgow connections could potentially change at Gilmour St for a Queen St service and not need to walk between Central and Queen St.

I was never sure how passengers would appreciate the extra time taken to get around to Queen St, but I think that was the idea - imagine, the 15 minute Kilcreggan ferry trip could be replaced with 2 hours on a direct train from Gourock to Helensburgh!
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
Any prospect of the other 2 low level platforms at Central being brought back into service? This would fulfill the new turnback requirement.
I'm quite sure if this could be done easily it would have been done long by now. I heard rumours a while back that some "substantial civil engineering" (= expensive!) was required so wouldn't happen.
The thing that's always been said is that the foundations of the Radisson Blu get in the way, but that's never really made sense to me (the line runs directly under Argyle St, so the hotel is on the opposite side of the extant lines to the unused platforms); more plausible is the building opposite it (the one that contains the The Sir John Moore 'spoons among other things). That all said, an east-facing bay might not be impossible.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
Which is important as most people will still go Queen St - Edinburgh . Though if theres a decent connection i use the Shotts fast service .

I wonder what line will get wires next , Maryhill line ,, EK ...
You have consider stock too .
I and many others selfishly hope it's East Kilbride. I don't understand why Shotts was done first - operational reasons have been suggested but the usage figures on EK are far higher, it would appear the customers did not come first in this decision. In terms of stock, I believe 385s are planned but, being a relatively short commuter line, any Scotrail EMUs (or similar, cascaded) would do. A bit concerning to read up thread that the proposal and business case aren't even in the system yet. Hopefully they're in someone's desk drawer ready to be put in the post!
 

gordonjahn

Member
Joined
23 Oct 2010
Messages
146
The thing that's always been said is that the foundations of the Radisson Blu get in the way, but that's never really made sense to me (the line runs directly under Argyle St, so the hotel is on the opposite side of the extant lines to the unused platforms); more plausible is the building opposite it (the one that contains the The Sir John Moore 'spoons among other things). That all said, an east-facing bay might not be impossible.

You're correct. See http://www.eastbank.org.uk/images/Glasgow/GW0136.jpg for a visual; the GLC LL is west of the main station complex so yes, it's the Westergate Building (with Wetherspoons) that's in the way. There's a very long thread with old pictures at https://urbanglasgow.co.uk/abandoned-central-low-level-in-1967-t3419.html
 

gordonjahn

Member
Joined
23 Oct 2010
Messages
146
I and many others selfishly hope it's East Kilbride. I don't understand why Shotts was done first - operational reasons have been suggested but the usage figures on EK are far higher, it would appear the customers did not come first in this decision. In terms of stock, I believe 385s are planned but, being a relatively short commuter line, any Scotrail EMUs (or similar, cascaded) would do. A bit concerning to read up thread that the proposal and business case aren't even in the system yet. Hopefully they're in someone's desk drawer ready to be put in the post!

Simple - it wasn't about passengers, even if that's the thing politicians shout about: http://www.freightonrail.org.uk/hottopicstenproposedenhancementsscotland.htm. Clearing Shotts to W12 and electrifying (along with the Edinburgh south sub) gives an alternative electric route to Glasgow/Central belt terminals for W12 gauge if the WCML/Carstairs can't be used.
 