As far as Whifflet and Cumbernauld are concerned the existing EMU fleets are going to be worked harder. I don't believe these schemes needed new EMUs to resource their services.
As far as Whifflet and Cumbernauld are concerned the existing EMU fleets are going to be worked harder. I don't believe these schemes needed new EMUs to resource their services.
But will the Scots be desperate to scrap their 314s as desperately as some are here to scrap Pacers?
Network Rail is currently raising a bridge over the Grangemouth line at Beancross Rd. Has electrification of this line in CP5 been confirmed?
https://mobile.twitter.com/NetworkRailEGIP/status/470487216574455808?p=v
CP5 Delivery Plan said:There are significant interfaces for the Greenhill to Polmont and Dunblane/Alloa routes in respect of aligning the access requirements for construction with the need to protect diversionary routes during the core EGIP works. There are interfaces with the following projects:
- Electrification of the Grangemouth branch (planned to be funded from the Scottish Strategic Rail Freight Investment Fund);
NR must be confident it'll happen if going to the expense of raising the bridge.
I suppose it wouldn't be EGIP without a degree of ambiguity.
NR must be confident it'll happen if going to the expense of raising the bridge.
I suppose it wouldn't be EGIP without a degree of ambiguity.
Why are they raising the bridge now if it's not certain the wiring will happen soon? Is it to allow kelpies to canter under it?
Why are they raising the bridge now if it's not certain the wiring will happen soon? Is it to allow kelpies to canter under it?
Does anyone know what is happening to the bridge which takes Bath St over the ends of the platforms at Glasgow Queen Street? It is covered in scaffolding from the platforms under all the bridge deck. The work doesn't seem to be part of the station redevelopment for EGIP.
I thought Cumbernauld and Whifflett electrification was to free up 5x156 units for cascade to Northern to help with loss of 158s to TPE.
Driving under Cutty Sark bridge yesterday the OLE now looks to be fully strung on that part of the Whifflet line.
Official completion date still seems to be end of September (required to free up more DMUs for extra Ryder Cup services) but I wonder if testing might be starting in the next week or two before a full opening in early October?
Engineering works on Whifflet line
Due to Network Rail work to electrify this line, work will be ongoing to complete this project by September 2014 which will mean evening train services, Monday to Saturday, will be replaced by buses from 19 May to 27 September.
Last train from Glasgow Central to Whifflet will be the 20:16 Monday-Friday, & 19:16 on Saturdays.
Last train from Whifflet to Glasgow Central will be the 20:36 Monday-Friday, & 19:36 on Saturdays.
Paisley Canal was done to help free up DMUs to help provide capacity up in Inverness when the Kessock Bridge was being resurfaced - the reopening of Conon Bridge station was also part of this.
The Borders Railway will require around 6 units, I believe, when it opens for business on the 6th of September 2015, so the Cumbernauld and Whifflet (+Motherwell-Cumbernauld) DMUs will be used there almost immediately. The first possible cascades down south can only happen after the Edinburgh-Glasgow via Falkirk High service transfers from 2x3 170s to 3+4 EMUs.
EDIT: Still unfinished at Kirkwood yesterday (22/8/14) - no prizes for spotting what has still to be fitted in the OHLE rig in the pic
As the 318s are more heavily used thanks to electrification of more lines where are these 156s going? They may be needed for one-off events like Ryders Cup, etc but beyond that it really is time to send them on their way to Northern Rail. Enough is enough, stock should be sent where it is most needed. Not where the Scottish Government wants it for political gain.