Before retiring last year I was an occasional morning Edinburgh to South Gyle user and there were quite a few getting off there. The train terminated there though.

I know that South Gyle is a fairly busy commuter station but I was curious to know if anyone knows how many people use it from Midlothian and the Borders
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,589
Location
Scotland
There’s a Tweedbank-Edinburgh service that runs through to South Gyle in the morning peak, and obviously some go right through to Glenrothes. I’d be interested to know passenger numbers for Border line stations-South Gyle. Could possibly introduce a North Berwick/Dunbar peak service right through to South Gyle.
For the time being electrification as far as Dalmeny is a moot point for Borders services, but would be essential for a Dunbar-South Gyle service since terminators run to the passenger loops before returning to Haymarket/Edinburgh.
 

railjock

Member
Joined
30 Jun 2012
Messages
373
I know that South Gyle is a fairly busy commuter station but I was curious to know if anyone knows how many people use it from Midlothian and the Borders
Sorry, I meant Eskbank to South Gyle. Quite well used for people working at South Gyle and Edinburgh Park. Maybe 30/40 getting off there from the 8:03 from Eskbank though some wil have got on at Edinburgh stations.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,243
With through services from Borders to Glasgow , cant see it now with electrification
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
I see that NR are tweeting that they are checking the OHLE between Greenville and Polmont via Grahamston, which suggests that it is all installed, and about to be energised.

Now announced as going live on May 1st.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
An update on electrification of the Highland Main Line from Perth to Inverness!

The updated DMRB Stage 3 design for the A9 dualling in the Kingussie area was consulted on last week at public meetings.
https://www.transport.gov.scot/publ...pril-2018-crubenmore-to-kincraig-a9-dualling/

It includes this rail relevant comment on page 6 about the proposed new junction at Kingussie:

Development of the junction proposals include improved headroom to the A86 (Kerrow Road) and Highland Mainline Railway to accommodate future overhead line electrification.

Good to see that future electrification is being taken into account on the HML.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,594
Location
Nottingham
Clearance for OLE is pretty much standard in any new highway over rail bridge. Unless there's some site constraint the extra cost of making it that bit higher is lost in the noise compared with the scheme cost.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,589
Location
Scotland
Clearance for OLE is pretty much standard in any new highway over rail bridge.
Possibly reading it wrong but I got the impression that increasing the clearance is the main reason for the new bridge.

Edit: Ignore me, I was being thick.
 
Last edited:

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Going live doesn't mean passed by the ORR for passenger services. But I think it will just be a diversionary route until they have enough emus to launch the service via Cumbernauld. Goodness'knows when that will be.
 

Stopper

Member
Joined
11 Nov 2017
Messages
670
What’s happening to the Cumbernauld-Dumbarton Central service after the new Cumbernauld services are running? It’s quite regularly terminated at Springburn and is the least used North Clyde line train, I was wondering if it will be cut back to Springburn.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Clearance for OLE is pretty much standard in any new highway over rail bridge. Unless there's some site constraint the extra cost of making it that bit higher is lost in the noise compared with the scheme cost.

Basically they were going to widen an existing (S2) bridge that isn’t high enough but the revised design instead proposes an entirely new (D2) Bridge because of the ongoing plans for electrification of the HML. This is definitely good news of some long term thinking.
 

Ginaro

Member
Joined
23 Aug 2016
Messages
132
Location
Scotland
Development of the junction proposals include improved headroom to the A86 (Kerrow Road) and Highland Mainline Railway to accommodate future overhead line electrification.

Good to see that future electrification is being taken into account on the HML.
Wide enough for double track as well?
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Travelled between Camelon and Stirling today and electrification is looking very advanced. Most masts are up and all but Kerse Road of the structures are sorted. Wiring is just starting as well. All in all looks to be very good progress.
 
Last edited:

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Actually where the M9 crosses the line near Plean all the posts are up, but bare, and that hasn't changed for some time. I was hoping for progress when I drove up this afternoon.
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,072
Wires are up as far as Larbert junction but no further. Still patches of missing masts around former Plean Junction and a couple of other spots, possible awaits Scottish Power works to overhead cables.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,265
Location
Isle of Wight
How far off is the Grangemouth branch?

Incidentally an interesting stat from today's Modern Railways meet up at the NRM:

"Delivery of EGIP electrification has slipped - issues around contractor performance, additional compliance work and issues from previous programmes. Costs escalated, emerging around £1.5 million/single track km"
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,072
Wires are only ready for testing on the main lines, limit of electrification is just after the junction
 

Fougasse

Member
Joined
3 Apr 2018
Messages
53
Actually where the M9 crosses the line near Plean all the posts are up, but bare, and that hasn't changed for some time. I was hoping for progress when I drove up this afternoon.
Wires are also up from just north of Larbert siding to about a klick after M876 overbridge.
Wires are up as far as Larbert junction but no further. Still patches of missing masts around former Plean Junction and a couple of other spots, possible awaits Scottish Power works to overhead cables.
 

DuncanS

Member
Joined
16 May 2017
Messages
277
Location
Falkirk
We've also had some Network Rail staff, or minimum wage paid students, handing out leaflets warning us of imminent death if we touch the wires.
 